973 resultados para Open Building


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Understanding the differences between the temporal and physical aspects of the building life cycle is an essential ingredient in the development of Building Environmental Assessment (BEA) tools. This paper illustrates a theoretical Life Cycle Assessment (LCA) framework aligning temporal decision-making with that of material flows over building development phases. It was derived during development of a prototype commercial building design tool that was based on a 3-D CAD information and communications technology (ICT) platform and LCA software. The framework aligns stakeholder BEA needs and the decision-making process against characteristics of leading green building tools. The paper explores related integration of BEA tool development applications on such ICT platforms. Key framework modules are depicted and practical examples for BEA are provided for: • Definition of investment and service goals at project initiation; • Design integrated to avoid overlaps/confusion over the project life cycle; • Detailing the supply chain considering building life cycle impacts; • Delivery of quality metrics for occupancy post-construction/handover; • Deconstruction profiling at end of life to facilitate recovery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a need to take a fresh look at the traditional application of the marketing concept to political marketing. As many businesses have learned, Integrated Marketing Communications (IMC) practices and principles will help them to build customer relationships and profitable brands. Political marketing must also change with the times and implement IMC practices toward building and nourishing brand relationships with voters and other important stakeholders. The nature of the contribution of this paper is the identification of a gap in the political marketing literature - the stagnation of political marketing at the 4P's marketing concept, and to play a role in the future development of political marketing. In recent developments, it is seen that there is a gradual movement away from this traditional marketing theory. There are a growing number of academics who have approached very closely to the IMC concept or aspects of it, but have not however embraced or have been reluctant to, the prospect of applying it to political marketing. IMC is a practical, logical and ultimately inevitable future for political marketing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As a functioning performing arts centre, commercial enterprise, tourist attraction and major national asset, Sydney Opera House must continue to demonstrate the optimal use and effectiveness of its facilities management (FM) to provide value for its stakeholders. To better achieve this, the Cooperative Research Centre for Construction Innovation focussed on the following three themes for investigation in the FM Exemplar Project — Sydney Opera House: digital modelling — developing a building information model capable of integrating information from disparate software systems and hard copy, and combining this with a spatial 3D computeraided design (CAD)/geographic information system (GIS) platform. This model offers a visual representation of the building and its component elements in 3D, and provides comprehensive information on each element. The model can work collaboratively through an open data exchange standard (common to all compliant software) in order to mine the data required to further FM objectives (such as maintenance) more efficiently and effectively. services procurement — developing a multi-criteria performance-based procurement framework aligned with organisational objectives for FM service delivery performance benchmarking — developing an FM benchmarking framework that enables facilities/ organisations to develop key performance indicators (KPIs) to identify better practice and improvement strategies. These three research stream outcomes were then aligned within the broader context of Sydney Opera House’s Total Asset Management (TAM) Plan and Strategic Asset Maintenance (SAM) Plan in arriving at a business framework aligned with, and in support of, organisational objectives. The Sydney Opera House is managed by the Sydney Opera House Trust on behalf of the Government of the State of New South Wales. Within the framework of the TAM Plan prepared in accordance with NSW Treasury Guidelines, the assimilation of these three themes provides an integrated FM solution capable of supporting Sydney Opera House’s business objectives and functional requirements. FM as a business enabler showcases innovative methods in improving FM performance, a better alignment of service and performance objectives and provides a better-practice model to support the business enterprise.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent theoretical work has suggested “entrepreneurial capabilities” themselves may provide the resource foundations to deliver competitive advantage for entrepreneurial firms. This paper empirically examines how start-ups use such entrepreneurial capabilities to build competitive advantage. We investigate the effects of technological and marketing expertise, knowledge of market trends, flexibility and networking on the ability to obtain a cost leadership or differentiation advantage. Using a large dataset of 1,108 start-ups obtained after random sampling of over 30,193 households, we find that differentiation strategies benefit from most resource advantages. Cost leadership strategies, however, seem only to benefit from technological expertise and flexibility and not related to market-based advantages. By doing so, this study contributes to both entrepreneurship and RBV-theories by showing how entrepreneurial capabilities lead to competitive advantages in nascent and early-stage start-ups.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Historically, asset management focused primarily on the reliability and maintainability of assets; organisations have since then accepted the notion that a much larger array of processes govern the life and use of an asset. With this, asset management’s new paradigm seeks a holistic, multi-disciplinary approach to the management of physical assets. A growing number of organisations now seek to develop integrated asset management frameworks and bodies of knowledge. This research seeks to complement existing outputs of the mentioned organisations through the development of an asset management ontology. Ontologies define a common vocabulary for both researchers and practitioners who need to share information in a chosen domain. A by-product of ontology development is the realisation of a process architecture, of which there is also no evidence in published literature. To develop the ontology and subsequent asset management process architecture, a standard knowledge-engineering methodology is followed. This involves text analysis, definition and classification of terms and visualisation through an appropriate tool (in this case, the Protégé application was used). The result of this research is the first attempt at developing an asset management ontology and process architecture.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The full economic, cultural and environmental value of information produced or funded by the public sector can be realised through enabling greater access to and reuse of the information. To do this effectively it is necessary to describe and implement a policy framework that supports greater access and reuse among a distributed, online network of information suppliers and users. The objective of this study was to identify materials dealing with policies, principles and practices relating to information access and reuse in Australia and in other key jurisdictions internationally. Open Access Policies, Practices and Licensing: A review of the literature in Australia and selected jurisdictions sets out the findings of an extensive review of published materials dealing with policies, practices and legal issues relating to information access and reuse, with a particular focus on materials generated, held or funded by public sector bodies. The report was produced as part of the work program of the project “Enabling Real-Time Information Access in Both Urban and Regional Areas”, established within the Cooperative Research Centre for Spatial Information (CRCSI).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The analysis and value of digital evidence in an investigation has been the domain of discourse in the digital forensic community for several years. While many works have considered different approaches to model digital evidence, a comprehensive understanding of the process of merging different evidence items recovered during a forensic analysis is still a distant dream. With the advent of modern technologies, pro-active measures are integral to keeping abreast of all forms of cyber crimes and attacks. This paper motivates the need to formalize the process of analyzing digital evidence from multiple sources simultaneously. In this paper, we present the forensic integration architecture (FIA) which provides a framework for abstracting the evidence source and storage format information from digital evidence and explores the concept of integrating evidence information from multiple sources. The FIA architecture identifies evidence information from multiple sources that enables an investigator to build theories to reconstruct the past. FIA is hierarchically composed of multiple layers and adopts a technology independent approach. FIA is also open and extensible making it simple to adapt to technological changes. We present a case study using a hypothetical car theft case to demonstrate the concepts and illustrate the value it brings into the field.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Open and Trusted Health Information Systems (OTHIS) Research Group has formed in response to the health sector’s privacy and security requirements for contemporary Health Information Systems (HIS). Due to recent research developments in trusted computing concepts, it is now both timely and desirable to move electronic HIS towards privacy-aware and security-aware applications. We introduce the OTHIS architecture in this paper. This scheme proposes a feasible and sustainable solution to meeting real-world application security demands using commercial off-the-shelf systems and commodity hardware and software products.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Information and Communications Technologies globally are moving towards Service Oriented Architectures and Web Services. The healthcare environment is rapidly moving to the use of Service Oriented Architecture/Web Services systems interconnected via this global open Internet. Such moves present major challenges where these structures are not based on highly trusted operating systems. This paper argues the need of a radical re-think of access control in the contemporary healthcare environment in light of modern information system structures, legislative and regulatory requirements, and security operation demands in Health Information Systems. This paper proposes the Open and Trusted Health Information Systems (OTHIS), a viable solution including override capability to the provision of appropriate levels of secure access control for the protection of sensitive health data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has been increasing reliance on mechanical heating, ventilation and air-conditioning (HVAC) systems to achieve thermal comfort in office buildings. The use of universal standards for thermal comfort adopted in air-conditioned spaces often results in a large disparity between mean daily external summer temperatures and temperatures experienced indoors. The extensive overuse of air-conditioning in warm climates not only isolates us from the vagaries of the external environment, but is generally dependent on non-renewable energy. A pilot study conducted at the Queensland University of Technology (QUT) involved altering the thermostat set-points to two or three degrees above the normal summer setting in two air-conditioned buildings during the subtropical summer. This paper presents the findings of the research that led to the formulation of the test study. The findings of the test study are printed in the companion paper DES 72: Adjusting Building Thermastats for Environmental Gains – a Pilot Study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses the preliminary findings of an ongoing research project aimed at developing a technological, operational and strategic analysis of adopting BIM in AEC/FM (Architecture-Engineering-Construction/Facility Management) industry as a collaboration tool. Outcomes of the project will provide specifications and guidelines as well as establish industry standards for implementing BIM in practice. This research primarily focuses on BIM model servers as a collaboration platform, and hence the guidelines are aimed at enhancing collaboration capabilities. This paper reports on the findings from: (1) a critical review of latest BIM literature and commercial applications, and (2) workshops with focus groups on changing work-practice, role of technology, current perception and expectations of BIM. Layout for case studies being undertaken is presented. These findings provide a base to develop comprehensive software specifications and national guidelines for BIM with particular emphasis on BIM model servers as collaboration platforms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an IT enabled technology that allows storage, management, sharing, access, update and use of all the data relevant to a project through out the project life-cycle in the form of a data repository. BIM enables improved inter-disciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. While the technology itself may not be new, and similar approaches have been in use in some other sectors like Aircraft and Automobile industry for well over a decade now, the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry is still to catch up with them in its ability to exploit the benefits of the IT revolution. Though the potential benefits of the technology in terms of knowledge sharing, project management, project co-ordination and collaboration are near to obvious, the adoption rate has been rather lethargic, inspite of some well directed efforts and availability of supporting commercial tools. Since the technology itself has been well tested over the years in some other domains the plausible causes must be rooted well beyond the explanation of the ‘Bell Curve of innovation adoption’. This paper discusses the preliminary findings of an ongoing research project funded by the Cooperative Research Centre for Construction Innovation (CRC-CI) which aims to identify these gaps and come up with specifications and guidelines to enable greater adoption of the BIM approach in practice. A detailed literature review is conducted that looks at some of the similar research reported in the recent years. A desktop audit of some of the existing commercial tools that support BIM application has been conducted to identify the technological issues and concerns, and a workshop was organized with industry partners and various players in the AEC industry for needs analysis, expectations and feedback on the possible deterrents and inhibitions surrounding the BIM adoption.