911 resultados para New York Trade School. Electrical Department


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Vols. for <, 1881, 1887,1926, 1928, 1931, 1934, 1936-38> issued also without Detailed statement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Description based on: June 28-29, 1882 and Jan. 24-25, 1883.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report year irregular.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Facsimile reprint. Originally published: New York : C.T. Evans, 1863.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

At head of title: State of New York.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Four earlier editions were issued as Library school bulletins: no. 2, covering the years 1887-1896; no. 11, 1887-1901; no. 31, 1887-1911; no. 48, 1887-1921.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nos. 1 to 56 constitute vols. I to XV.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

On cover: From G. K. Hall & Co. with all good wishes at Christmas MCMLXVIII.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

General note: Title and date provided by Bettye Lane.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

GEA Consulting Engineers, acting as the design engineers, was hired by the owner, East Village 207 Residential LLC2 for energy modeling for compliance with LEED NC V3 -- This report details the results of the energy simulation done with the 100% construction documents -- This report only refers to entities within the LEED3 project boundary -- The project consists of a new eight-story high-end residential condominium building with 81 units, as shown in illustration 1, and approximately 117,905 GSF, equivalent to 10,953.73 m2, is located at 211 E 13th Street in New York, NY -- The residential portion of the building will function 24-7 -- The design goal is to utilize energy efficient measures to reduce electrical energy use and aims to achieve LEED certification -- LEED EA Credit 14 requires a building to demonstrate a percentage improvement in the proposed building performance compared with the baseline building -- The Credit rewards 1 point for achieving 12% reduction in energy costs -- Additionally, the Credit rewards another point for each subsequent reduction of 2% in the building’s energy cost