983 resultados para Integration projects
Resumo:
In this paper different aspects of teaching tribology and maintenance-related subjects with a hands-on focus at Queensland University of Technology (QUT) are presented and discussed. As part of the study, a combination of data from core units, such as engineering design units, and elective units, was used, in addition to laboratory experiments, real-life projects, interactive software packages and industry visits. The mechanical engineering curriculum structure used at QUT, consisting of the main specialization (first major) and the second specialization (second major), is also discussed with specific emphasis on the teaching of tribology and maintenance-related subjects. To evaluate students' satisfaction with the novel teaching approaches used, tailored questionnaires were used as well as QUT's online learning experience survey (LEX). Statistical results of these sureveys are presented and discussed. In summary, these showed that students overwhelmingly support the hands-on and practical focus in teaching tribology and maintenance-related subjects and that the teaching approaches used shorten the learning curve and make students better prepared for integration in the workplace.
Resumo:
Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.
Resumo:
A general mistrust within the contactor and subcontractor companies has identified one of the significant barriers to derive benefits from true downstream supply chain integration. Using the general theory of trust in inter-organizational relations and conducting interviews, this research discusses factors that influence development of trust and cooperation in contractor– subcontractor relationships in construction projects. System dynamics is the simulation method is selected in this theory-building effort, based on qualitative data collected from two projects of a construction company in Thailand. Performance, permeability and system based trust are found to make significant contributions toward parties’ trust level. Three strategic policies such as best value contracting, management of subcontractors as internal team and semi project partnering approach are recommended to stimulate the trust factors as well as cooperative long term relationship.
Resumo:
Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.
Resumo:
Quality, in construction projects should be regarded as the fulfillment of expectation of those contributors involved in such projects. Although a significant amount of quality practices have been introduced within the industry, attainment of reasonable levels of quality in construction projects continues to be an ongoing problem. To date, some research into the introduction and improvement of quality practices and stakeholder management has been undertaken, but so far no major studies have been completed that comprehensively examine how greater consideration of stakeholders’ perspectives of quality can be used to contribute to final project quality outcomes. This paper aims to examine the requirements for development of a framework leading to more effective involvement of stakeholders in quality planning and practices thus ultimately contributing to higher quality outcomes for construction projects. Through an extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines the viewpoints of major stakeholders on project quality. It proposes a set of criteria to be used as a basis for a quality practice improvement framework, which will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices leading to the achievement of improved quality outcomes on future projects.
Resumo:
The use of professional competency standards to assess postgraduate nursing student’s clinical performance has been in place since 2004, at the Queensland University of Technology, School of Nursing & Midwifery (SONAM) when the Graduate Certificate in Emergency Nursing degree commenced. Emergency nursing students were assessed in their workplace, using a Clinical Performance Appraisal Tool or CPAT which was based on the Australian College of Critical Care Nurses (ACCCN) Competency Standards. With the subsequent formation of a separate Emergency Nursing Course advisory group in 2007, there was a review of clinical assessment course component. The release of the 2008 CENA revised Practice Standards for the Emergency Nursing Specialist’s, led to the emergency nursing course advisory committee supporting the integration of the CENA practice standards for assessment of emergency nurses in preference to the less relevant ACCCN competency standards. The SONAM emergency nursing study area team commenced the phasing in and progression of the CENA practice standards across the two Graduate Certificate units, and Graduate Diploma and Master of Nursing (emergency) clinical major options in 2009. As some units undertaken in the degree are available to nurses in other disciplines a separate CPAT was devised for the clinical assessments according to speciality context. The team has had to carefully consider how the professional standards are integrated into the teaching and assessment of the unit and not just applied instead of the ACCCN competency standards. Professional standards for the emergency context has also helped tailor course content and learning outcomes to be relevant across a number of emergency nursing contexts in Australia. The assessment of the CPAT is undertaken at the workplace by QUT appointed clinical lecturers. Clinical lecturers need to apply and have suitable postgraduate qualification to undertake the position. The clinical lecturer support role is well established at QUT. The integration of the new CENA practice standards has necessitated a review of the postgraduate assessment of emergency nurses. A clinical lecturer workshop has been organised to review role, scope and how to utilise the new look CENA based CPAT, clinical assessment format.
Resumo:
Notwithstanding the obvious potential advantages of information and communications technology (ICT) in the enhanced provision of healthcare services, there are some concerns associated with integration of and access to electronic health records. A security violation in health records, such as an unauthorised disclosure or unauthorised alteration of an individual's health information, can significantly undermine both healthcare providers' and consumers' confidence and trust in e-health systems. A crisis in confidence in any national level e-health system could seriously degrade the realisation of the system's potential benefits. In response to the privacy and security requirements for the protection of health information, this research project investigated national and international e-health development activities to identify the necessary requirements for the creation of a trusted health information system architecture consistent with legislative and regulatory requirements and relevant health informatics standards. The research examined the appropriateness and sustainability of the current approaches for the protection of health information. It then proposed an architecture to facilitate the viable and sustainable enforcement of privacy and security in health information systems under the project title "Open and Trusted Health Information Systems (OTHIS)". OTHIS addresses necessary security controls to protect sensitive health information when such data is at rest, during processing and in transit with three separate and achievable security function-based concepts and modules: a) Health Informatics Application Security (HIAS); b) Health Informatics Access Control (HIAC); and c) Health Informatics Network Security (HINS). The outcome of this research is a roadmap for a viable and sustainable architecture for providing robust protection and security of health information including elucidations of three achievable security control subsystem requirements within the proposed architecture. The successful completion of two proof-of-concept prototypes demonstrated the comprehensibility, feasibility and practicality of the HIAC and HIAS models for the development and assessment of trusted health systems. Meanwhile, the OTHIS architecture has provided guidance for technical and security design appropriate to the development and implementation of trusted health information systems whilst simultaneously offering guidance for ongoing research projects. The socio-economic implications of this research can be summarised in the fact that this research embraces the need for low cost security strategies against economic realities by using open-source technologies for overall test implementation. This allows the proposed architecture to be publicly accessible, providing a platform for interoperability to meet real-world application security demands. On the whole, the OTHIS architecture sets a high level of security standard for the establishment and maintenance of both current and future health information systems. This thereby increases healthcare providers‘ and consumers‘ trust in the adoption of electronic health records to realise the associated benefits.
Resumo:
Fundamental studies on constructability issue done in United States, United Kingdom and Australia illustrate capability of this concept to affect overall objectives of construction projects. It can result in significant cost and time savings and improved final quality by consideration of construction contractors experiences during conceptual planning and design phases. As intensive as these studies are, they do not attempt to investigate importance of these activities in order to find each of their specific barriers separately. This research explores Constructability Activities (CAs) in all project phases separately based on amount of contractors involvement in each activity and also amount of gap that exists between target and actual effects of each activity on achieving the final objectives of building projects in Malaysia. It ends to development of Critical Constructability Activities (CCAs). This research is crucial to gaining a better understanding of CCAs which are caused based on contractors higher participation percentage and larger gaps between their target and actual effects on achieving the final aims of the project. This research highlights the need to overcome barriers of CAs implementation in building projects. This study recommends construction stakeholders to concentrate more on CCAs in order to achieve the overall objectives of the project much faster and easier.
Resumo:
In recent years, enterprise architecture (EA) has captured a growing attention as a means to systematically consolidate and interrelate diverse business and IT artefacts in order to provide holistic decision support. The recent popularity of a service-orientation has added “service “and related constructs as a new element that requires consideration within an Enterprise Architecture. Since the emergence of the Service-Oriented Architecture (SOA), many attempts have been made to incorporate SOA artefacts in existing EA frameworks. Yet, the approaches taken to achieve this goal differ substantially for the most commonly used EA frameworks to date. SOA in the context of enterprise architecture is one of the future research challenges. Several authors argue that further research is needed in order to understand how SOA impacts prior enterprise architecture frameworks. This study explores SOA integration within EA, identifies SOA integration approaches within EA and identifies factors that impact SOA integration within Enterprise Architecture.
Collaboration : developing integration in multi-purpose services in rural New South Wales, Australia
Resumo:
Introduction: The Multi-purpose Service (MPS) Program was introduced to rural Australia in 1991 as a solution to poor health outcomes in rural compared with metropolitan populations, difficulty in attracting healthcare staff and a lack of viability and range of health services in rural areas. The aim of this study was to describe the main concerns of participants involved in the development of multi-purpose services in rural New South Wales (NSW). This article is abstracted from a larger study and discusses the extent to which collaboration occurred within the new multi-purpose service. Methods: A constructivist grounded theory methodology was used. Participants were from 13 multi-purpose services in rural NSW and 30 in-depth interviews were conducted with 6 community members, 11 managers and 13 staff members who had been involved in the process of developing a multi-purpose service. Results: The main concern of all participants was their anticipation of risk. This anticipation of risk manifested itself in either trust or suspicion and explained their progression through a phase of collaborating. Participants who had trust in other stakeholders were more likely to embrace an integrated health service identity. Those participants, who were suspicious that they would lose status or power, maintained that the previous hospital services provided a better health service and described a coexistence of services within the multi-purpose service. Conclusions: This study provided an insight into the perceptions of community members, staff members and managers involved in the process of developing a multi-purpose service. It revealed that the anticipation of risk was intrinsic to a process of changing from a traditional hospital service to collaborating in a new model of health care provided at a multi-purpose service.
Resumo:
Many of the teaching elements in Civil and Environmental Engineering and Spatial Science/Surveying are strongly related to multidisciplinary real-world situations. Professionals in each discipline commonly work collaboratively, knowing each other’s professional and technical limitations and requirements. Replication of such real-world situations allows students to gain an insight and acquire knowledge of professional practice for both civil engineering and spatial science disciplines. However, replication of an authentic design project is not always possible in a single unit basis where empirical project situations are often created with controlled sets of constraints, inputs and outputs. A cross-disciplinary design-based project that is designed to promote active student learning, engagement and professional integration would be the preferred option. The central aim of this collaborative project was to create positive and inclusive environments to promote engaging learning opportunities that cater for a range of learning styles with a two-way linkage involving third-year civil engineering and spatial science (surveying) students. This paper describes the cross-disciplinary project developed and delivered in 2010 and 2011. A survey was conducted at completion of the project to assess the degree of improvement in student engagement and their learning experiences. Improvements were assessed in a range of dimensions including student motivation, learning by cross-disciplinary collaboration and learning by authentic design project experiences. In this specific cross-disciplinary linkage project, the study findings showed that teaching approaches utilised have been effective in promoting active student learning and increasing engagement.
Resumo:
The process of learning symbolic Arabic digits in early childhood requires that magnitude and spatial information integrates with the concept of symbolic digits. Previous research has separately investigated the development of automatic access to magnitude and spatial information from symbolic digits. However, developmental trajectories of symbolic number knowledge cannot be fully understood when considering components in isolation. In view of this, we have synthesized the existing lines of research and tested the use of both magnitude and spatial information with the same sample of British children in Years 1, 2 and 3 (6-8 years of age). The physical judgment task of the numerical Stroop paradigm (NSP) demonstrated that automatic access to magnitude was present from Year 1 and the distance effect signaled that a refined processing of numerical information had developed. Additionally, a parity judgment task showed that the onset of the Spatial-Numerical Association of Response Codes (SNARC) effect occurs in Year 2. These findings uncover the developmental timeline of how magnitude and spatial representations integrate with symbolic number knowledge during early learning of Arabic digits and resolve inconsistencies between previous developmental and experimental research lines.
Resumo:
[Quality Management in Construction Projects by Abdul Razzak Rumane, CRC Press, Boca Raton, FL, 2011, 434 pp, ISBN 9781439838716] Issues of quality management, quality control and performance against specification have long been the focus of various business sectors. Recently there has been an additional drive to achieve the continuous improvement and customer satisfaction promised by the 20th-century ‘gurus’ some six or seven decades ago. The engineering and construction industries have generally taken somewhat longer than their counterparts in the manufacturing, service and production sectors to achieve these espoused levels of quality. The construction and engineering sectors stand to realize major rewards from better managing quality in projects. More effort is being put into instructing future participants in the industry as well as assisting existing professionals. This book comes at an opportune time.
Resumo:
This paper investigates the use of visual artifacts to represent a complex adaptive system (CAS). The integrated master schedule (IMS) is one of those visuals widely used in complex projects for scheduling, budgeting, and project management. In this paper, we discuss how the IMS outperforms the traditional timelines and acts as a ‘multi-level and poly-temporal boundary object’ that visually represents the CAS. We report the findings of a case study project on the way the IMS mapped interactions, interdependencies, constraints and fractal patterns in a complex project. Finally, we discuss how the IMS was utilised as a complex boundary object by eliciting commitment and development of shared mental models, and facilitating negotiation through the layers of multiple interpretations from stakeholders.
Resumo:
Despite promising benefits and advantages, there are reports of failures and low realisation of benefits in Enterprise System (ES) initiatives. Among the research on the factors that influence ES success, there is a dearth of studies on the knowledge implications of multiple end-user groups using the same ES application. An ES facilitates the work of several user groups, ranging from strategic management, management, to operational staff, all using the same system for multiple objectives. Given the fundamental characteristics of ES – integration of modules, business process views, and aspects of information transparency – it is necessary that all frequent end-users share a reasonable amount of common knowledge and integrate their knowledge to yield new knowledge. Recent literature on ES implementation highlights the importance of Knowledge Integration (KI) for implementation success. Unfortunately, the importance of KI is often overlooked and little about the role of KI in ES success is known. Many organisations do not achieve the potential benefits from their ES investment because they do not consider the need or their ability to integrate their employees’ knowledge. This study is designed to improve our understanding of the influence of KI among ES end-users on operational ES success. The three objectives of the study are: (I) to identify and validate the antecedents of KI effectiveness, (II) to investigate the impact of KI effectiveness on the goodness of individuals’ ES-knowledge base, and (III) to examine the impact of the goodness of individuals’ ES-knowledge base on the operational ES success. For this purpose, we employ the KI factors identified by Grant (1996) and an IS-impact measurement model from the work of Gable et al. (2008) to examine ES success. The study derives its findings from data gathered from six Malaysian companies in order to obtain the three-fold goal of this thesis as outlined above. The relationships between the antecedents of KI effectiveness and its consequences are tested using 188 responses to a survey representing the views of management and operational employment cohorts. Using statistical methods, we confirm three antecedents of KI effectiveness and the consequences of the antecedents on ES success are validated. The findings demonstrate a statistically positive impact of KI effectiveness of ES success, with KI effectiveness contributing to almost one-third of ES success. This research makes a number of contributions to the understanding of the influence of KI on ES success. First, based on the empirical work using a complete nomological net model, the role of KI effectiveness on ES success is evidenced. Second, the model provides a theoretical lens for a more comprehensive understanding of the impact of KI on the level of ES success. Third, restructuring the dimensions of the knowledge-based theory to fit the context of ES extends its applicability and generalisability to contemporary Information Systems. Fourth, the study develops and validates measures for the antecedents of KI effectiveness. Fifth, the study demonstrates the statistically significant positive influence of the goodness of KI on ES success. From a practical viewpoint, this study emphasises the importance of KI effectiveness as a direct antecedent of ES success. Practical lessons can be drawn from the work done in this study to empirically identify the critical factors among the antecedents of KI effectiveness that should be given attention.