867 resultados para Infrastructure Procurement


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector infrastructure market, especially in the very large economic infrastructure sector procured using Pubic Private Partnerships, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI). This paper aims to report on progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major infrastructure projects. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors into Australia. Elsewhere, the authors have developed Dunning’s principal hypothesis to suit the context of this research and to address a weakness arising in this hypothesis that is based on a nominal approach to the factors in Dunning's eclectic framework and which fails to speak to the relative explanatory power of these factors. In this paper, a first stage test of the authors' development of Dunning's hypothesis is presented by way of an initial review of secondary data vis-à-vis the selected sector (roads and bridges) in Australia (as the host location) and with respect to four selected home countries (China; Japan; Spain; and US). In doing so, the next stage in the research method concerning sampling and case studies is also further developed and described in this paper. In conclusion, the extent to which the initial review of secondary data suggests the relative importance of the factors in the eclectic framework is considered. It is noted that more robust conclusions are expected following the future planned stages of the research including primary data from the case studies and a global survey of the world’s largest contractors and which is briefly previewed. Finally, and beyond theoretical contributions expected from the overall approach taken to developing and testing Dunning’s framework, other expected contributions concerning research method and practical implications are mentioned.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With increasing media exposure and evidence of environmental impacts, it is increasingly recognized that incorporating sustainability principles in construction works is both crucial and beneficial. However a recent survey reveals that among stakeholders of infrastructure projects such as roads, there is no common understanding on what constitutes sustainability in real-life projects. Sustainability has been interpreted widely and differently and as a result, sustainability outcomes are not tangible at the project level or often neglected. Under such conditions, policies and strategies on sustainability remain largely ideological and cannot be sufficiently reflected in the actual project delivery. The major difficulty of this sustainability pursuit lies in the lack of consensus among the experts on sustainability criteria and indicators. To move ahead, these criteria and indicators are to be agreed upon. This paper reviews the sustainable infrastructure development, its criteria and indicators, focusing on road infrastructure context. It goes on to introduce a Delphi study, an integral part of a QUT research, aimed at identifying critical sustainability criteria and indicators for Australian road infrastructure projects. It paves the way for further identification of solutions for each critical indicator at a subsequent stage. The criteria, indicators and solutions will be encapsulated into a decision making framework for the enhancement of sustainability deliverables. By doing so, the research will promote more integrated thinking of and consistent approaches to the sustainability agenda in road and highway infrastructure projects in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sourcing appropriate funding for the provision of new urban infrastructure has been a policy dilemma for governments around the world for decades. This is particularly relevant in high growth areas where new services are required to support swelling populations. The Australian infrastructure funding policy dilemmas are reflective of similar matters in many countries, particularly the United States of America, where infrastructure cost recovery policies have been in place since the 1970’s. There is an extensive body of both theoretical and empirical literature from these countries that discusses the passing on (to home buyers) of these infrastructure charges, and the corresponding impact on housing prices. The theoretical evidence is consistent in its findings that infrastructure charges are passed on to home buyers by way of higher house prices. The empirical evidence is also consistent in its findings, with “overshifting” of these charges evident in all models since the 1980’s, i.e. $1 infrastructure charge results in greater than $1 increase in house prices. However, despite over a dozen separate studies over two decades in the US on this topic, no empirical works have been carried out in Australia to test if similar shifting or overshifting occurs here. The purpose of this research is to conduct a preliminary analysis of the more recent models used in these US empirical studies in order to identify the key study area selection criteria and success factors. The paper concludes that many of the study area selection criteria are implicit rather than explicit. By collecting data across the models, some implicit criteria become apparent, whilst others remain elusive. This data will inform future research on whether an existing model can be adopted or adapted for use in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Under pressure from both the ever increasing level of market competition and the global financial crisis, clients in consumer electronics (CE) industry are keen to understand how to choose the most appropriate procurement method and hence to improve their competitiveness. Four rounds of Delphi questionnaire survey were conducted with 12 experts in order to identify the most appropriate procurement method in the Hong Kong CE industry. Five key selection criteria in the CE industry are highlighted, including product quality, capability, price competition, flexibility and speed. This study also revealed that product quality was found to be the most important criteria for the “First type used commercially” and “Major functional improvements” projects. As for “Minor functional improvements” projects, price competition was the most crucial factor to be considered during the PP selection. These research findings provide owners with useful insights to select the procurement strategies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Transport and logistics are essential to effective business. Very little is currently known about the impact of improved transport on micro-enterprises in developing economies and whether improvements in this area would assist the very poor. This paper looks at the obstacles of an inefficient transport facilitation system and the high costs incurred by 22 survival micro-entrepreneurs funded by the same local NGO and operating in diverse industry sectors in a peri-urban context in Mozambique. Six case studies are selected to illustrate the most common constraints they face. The perspectives of the micro-business owners are confronted with those of government officials and community leaders for two reasons: to identify any mismatch and to discuss possible solutions. Significant discrepancies are detected between government agenda and needs of the population, while community-based entrepreneurship (CBE) is discussed as a possible collective strategy in dealing with the problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

From its early birth through to the twenty-first century, the planning for social infrastructure has been viewed as a crucial element in promoting the development of healthy communities. The existence of good social infrastructure in every level of human settlement (i.e. neighbourhoods, districts, regions etc.) is vital because it is considered to be an element that impacts positively and meaningfully on the quality of life for members of the targeted community. The increasing importance of the sustainable development agenda in human settlements has prompted concerns over the cost of the government’s failure to provide for adequate social infrastructure for their communities. Part of this failure is attributed to the inconsistent outcome from the use of traditional planning standards that are based on population-to-facility ratios. This paper explores the literature discussion on social infrastructure for sustainable communities. It examines how a participation-oriented, need-sensitive approach in the planning and provision of social infrastructure is used as an alternative to the traditional standards that are based on population-to-facility ratios. It does this by giving an overview of its application in the planning and provision of social infrastructure for Australia’s fastest growing region of South-East Queensland.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Organisations within the not-for-profit sector provide services to individuals and groups government and for-profit organisations cannot or will not consider. This response by the not-for-profit sector to market failure and government failure is a well understood contribution to society by the nonprofit sector. Over time, this response has resulted in the development of a vibrant and rich agglomeration of services and programs that operate under a myriad of philosophical stances, service orientations, client groupings and operational capacities. In Australia, these organisations and services provide social support and service assistance to many people in the community; often targeting their assistance to clients facing the most difficult of clients with complex problems. Initially, in undertaking this role, the not-for-profit sector received limited sponsorship from government, relying on primarily on public donations to fund the delivery of services. (Lyons 2001). Over time governments assumed greater responsibility in the form of service grants to particular groups: ‘the worthy poor’. More recently, government has engaged in widespread procurement of services from the not-for-profit sector, which specify the nature of the outcomes to be achieved and, to a degree, the way in which the services will be provided. A consequence of this growing shift to a more marketised model of service contracting, often offered-up under the label of enhanced collaborative practice, has been increased competitiveness between agencies that had previously worked well together (Keast and Brown, 2006). One of the challenges which emerge from the procurement of services by government from third sector organisations is that public values such as effectiveness, efficiency, transparency and professionalism can be neglected (Jørgensen and Bozeman 2002), although this is not always the case (Brown, Furneaux and Gudmundsson 2012). While some approaches to the examination of social procurement - the intentional purchasing of social outcomes (Furneaux and Barraket 2011) - assumes that public values are lost in social procurement arrangements (Bozeman 2002; Jørgensen and Bozeman 2002), alternative approach suggest such inevitability is not the case. Instead, social procurement is seen to involve a set of tensions (Brown, Potoski and Slyke 2006) or a set of trade offs (Charles et al. 2007), which must be managed, and through such management, public values can be potentially safeguarded (Bruin and Dicke 2006). The potential trade-offs of public values in social procurement is an area in need of further research, and one which carries both theoretical and practical significance. Additionally, the juxtaposition of policies – horizontal integration and vertical efficiency – results in a complex, crowded and contested policy and practice environment (Keast et al., 2007),, with the potential for set of unintentional consequences arising from these arrangements. Further the involvement of for-profit, non-profit, and hybrid organisations such as social enterprises, adds further complexity in the number of different organisational forms engaged in service delivery on behalf of government. To address this issue, this paper uses information gleaned from a state-wide survey of not-for-profit organisations in Queensland, Australia which included within its focus organisational size, operational scope, funding arrangements and governance/management approaches. Supplementing this information is qualitative data derived from 17 focus groups and 120 interviews conducted over ten years of study of this sector. The findings contribute to greater understanding of the practice and theory of the future provision of social services.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to the many advantages offered on projects by such systems. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. In order to provide evidence of the benefits of DB, it is essential to identify the factors that can contribute to successful DB implementation and this paper aims to provide evidence of such factors that can promote the successful implementation of DB project delivery systems on Indonesian road infrastructure projects. Four main factors and 28 indicators were identified from an extensive literature review, and a Delphi questionnaire survey was conducted amongst 20 experts drawn from the Indonesian road infrastructure construction sector. The first round Delphi study found that regulation, competency of clients, ability to manage DB projects and external conditions were the major factors that can promote successful DB implementation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Just as telecommunications has played a key role in the global economy,1 high-speed broadband will have a significant role to play in the future of the digital economy. In particular high-speed broadband will have a role to play in the delivery of applications and services necessary for acquiring, and maintaining into the future Australia and Australians’ appropriate education level; community; health services, information provision and support; government services and engagement and participation by the public in the political process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Product innovation is an important contributor to the performance of infrastructure projects in the construction industry. Maximizing the potential for innovative product adoption is a challenging task due to the complexities of the construction innovation system. A qualitative methodology involving interviews with major construction project stakeholders is employed to address the research question: ‘What are the main obstacles to the adoption of innovative products in the road industry?’ The characteristics of six key product innovation obstacles in Australian road projects are described. The six key obstacles are: project goal misalignment, client pressures, weak contractual relations, lack of product trialling, inflexible product specifications and product liability concerns. A snapshot of the dynamics underlying these obstacles is provided. There are few such assessments in the literature, despite the imperative to improve construction innovation rates globally in order to deliver road infrastructure projects of increasing size and complexity. Key obstacles are interpreted through an open innovation construct, providing direction for policy to enhance the uptake of innovation across the construction product supply network. Early evidence suggests the usefulness of an open innovation construct that integrates three conceptual lenses: network governance, absorptive capacity and knowledge intermediation, in order to interpret product adoption obstacles in the context of Australian road infrastructure projects. The paper also provides practical advice and direction for government and industry organizations that wish to promote the flow of innovative product knowledge across the construction supply network.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Australian economy has been transformed by bold federal government initiatives over the last decade. The political rhetoric is that without these reforms, the Australian economy will falter and be uncompetitive in a global market place. Despite the electoral disquiet that rapid systemic change brings, both sides of politics have adopted the broad starting point that it is imperative that our economy be transformed or Australian living standards will dramatically plummet...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – The rapidly changing role of capital city airports has placed demands on surrounding infrastructure. The need for infrastructure management and coordination is increasing as airports and cities grow and share common infrastructure frameworks. The purpose of this paper is to document the changing context in Australia, where the privatisation of airports has stimulated considerable land development with resulting pressures on surrounding infrastructure provision. It aims to describe a tool that is being developed to support decision-making between various stakeholders in the airport region. The use of planning support systems improves both communication and data transfer between stakeholders and provides a foundation for complex decisions on infrastructure. Design/methodology/approach – The research uses a case study approach and focuses on Brisbane International Airport and Brisbane City Council. The research is primarily descriptive and provides an empirical assessment of the challenges of developing and implementing planning support systems as a tool for governance and decision-making. Findings – The research assesses the challenges in implementing a common data platform for stakeholders. Agency data platforms and models, traditional roles in infrastructure planning, and integrating similar data platforms all provide barriers to sharing a common language. The use of a decision support system has to be shared by all stakeholders with a common platform that can be versatile enough to support scenarios and changing conditions. The use of iPadss for scenario modelling provides stakeholders the opportunity to interact, compare scenarios and views, and react with the modellers to explore other options. Originality/value – The research confirms that planning support systems have to be accessible and interactive by their users. The Airport City concept is a new and evolving focus for airport development and will place continuing pressure on infrastructure servicing. A coordinated and efficient approach to infrastructure decision-making is critical, and an interactive planning support system that can model infrastructure scenarios provides a sound tool for governance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Information communication and technology (ICT) systems are almost ubiquitous in the modern world. It is hard to identify any industry, or for that matter any part of society, that is not in some way dependent on these systems and their continued secure operation. Therefore the security of information infrastructures, both on an organisational and societal level, is of critical importance. Information security risk assessment is an essential part of ensuring that these systems are appropriately protected and positioned to deal with a rapidly changing threat environment. The complexity of these systems and their inter-dependencies however, introduces a similar complexity to the information security risk assessment task. This complexity suggests that information security risk assessment cannot, optimally, be undertaken manually. Information security risk assessment for individual components of the information infrastructure can be aided by the use of a software tool, a type of simulation, which concentrates on modelling failure rather than normal operational simulation. Avoiding the modelling of the operational system will once again reduce the level of complexity of the assessment task. The use of such a tool provides the opportunity to reuse information in many different ways by developing a repository of relevant information to aid in both risk assessment and management and governance and compliance activities. Widespread use of such a tool allows the opportunity for the risk models developed for individual information infrastructure components to be connected in order to develop a model of information security exposures across the entire information infrastructure. In this thesis conceptual and practical aspects of risk and its underlying epistemology are analysed to produce a model suitable for application to information security risk assessment. Based on this work prototype software has been developed to explore these concepts for information security risk assessment. Initial work has been carried out to investigate the use of this software for information security compliance and governance activities. Finally, an initial concept for extending the use of this approach across an information infrastructure is presented.