940 resultados para Illinois Correctional Industries


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report of the Iowa State Prison Industries – Farms for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report of the Iowa State Prison Industries for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) and the Iowa and Illinois Departments of Transportation (Iowa DOT and IDOT) have identified the Selected Alternative for improving Interstate 74 (I-74) from its southern terminus at Avenue of the Cities (23rd Avenue) in Moline, Illinois to its northern terminus one mile north of the I-74 interchange with 53rd Street in Davenport, Iowa. The Selected Alternative identified and discussed in this Record of Decision is the preferred alternative identified in the Final Environmental Impact Statement (FEIS). The purpose of the proposed improvements is to improve capacity, travel reliability, and safety along I-74 between its termini, and provide consistency with local land use planning goals. The need for the proposed improvements to the I-74 corridor is based on a combination of factors related to providing better transportation service and sustaining economic development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Combined report on the eight Judicial District Departments of Correctional Services for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on the Iowa State Prison Industries – Farms for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Corrections (DOC) and the Department of Human Rights, Division of Criminal and Juvenile Justice Planning (CJJP) entered into a contract for services from January 2, 2007 to June 30, 2008 for the purposes of assisting in the evaluation component for the two-year Prison Re-Entry Initiative (PRI) grand awarded to the DOC by the U.S. Office of Justice Programs. The PRI grant period ran from July 2006 through June 2008 and included two primary components. First, all PRI participants returning to Polk County would participate in a Lifeskills curriculum offered through the Des Moines Area Community College (DMACC) at four Iowa prison institutions located at Mitchellville, Newton, Fort Dodge and Rockwell City. Second, all PRI participants returning to Polk County would be referred to The Directors Council (TDC) for cmmunity-based wrap-around services.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Corrections (DOC) and the Department of Human Rights, Division of Criminal and Juvenile Justice Planning (CJJP) entered into a contract for services from September 12, 2007 to June 30, 2009 for the purposes of assisting in the evaluation component for the two-year Iowa Prisoner Re-Entry Initiative (PRI) Rural Service Delivery Model. This contract was extended to November 2009. The Rural PRI grant period ran from July 1, 2007 to June 30, 2009 and was extended to November 30, 2009. The purpose of the program was to improve community safety by providing pre-release services and successful transition planning and aftercare services to offenders released from state institutions to the Second Judicial District Department of Correctional Services. Participants included all offenders released to the Second Judicial District during the grant period.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Combined report on the eight Judicial District Departments of Correctional Services for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of the Sixth Judicial District Department of Correctional Services for the period July 1, 2008 through June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Rock Island Centennial Bridge spanning the Mississippi River between Rock Island, Illinois and Davenport, Iowa was opened to traffic on July 12, 1940. It is a thoroughly modern, four-lane highway bridge, adequate in every respect for present day high speed passenger and transport traffic. The structure is ideally situated to provide rapid transit between the business districts of Rock Island and Davenport and serves not only the local or shuttle traffic in the Tri-City Area, but also heavy through motor travel on U.S. Highways 67 and 150. The Centennial Bridge is notable in several respects. The main spans are box girder rib tied arches, a type rather unusual in America and permitting simplicity in design with pleasing appearance. The Centennial Bridge is the only bridge across the Mississippi providing for four lanes of traffic with separation of traffic in each direction. It is a toll bridge operating alongside a free bridge and has the lowest rates of toll of any toll bridge on the Mississippi River. It was financed entirely by the City of Rock Island with no obligation on the taxpayers; there was no federal or state participation in the financing. But perhaps the most outstanding feature of the new bridge is its great need. A few remarks on the communities served by the new structure, the services rendered, and some statistics on cross-river traffic in the Tri-City Area will emphasize the reasons for constructing the Centennial Bridge.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on Iowa State Prison Industries – Farms for the year ended June 30, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report of Iowa State Prison Industries for the year ended June 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Combined report on the eight Judicial District Departments of Correctional Services for the year ended June 30, 2013