868 resultados para Construction projects
Resumo:
Project alliancing is a new alternative to traditional project delivery systems, especially in the commercial building sector. The Collaborative Process is a theoretical model of people and systems characteristics that are required to reduce the adversarial nature of most construction projects. Although developed separately, both are responses to the same pressures. Project alliancing was just used successfully to complete the National Museum of Australia. This project was analyzed as a case study to determine the extent to which it could be classified as a “collaborative project”. Five key elements of The Collaborative Process were reviewed and numerous examples from the management of this project were cited that support the theoretical recommendations of this model. In the case of this project, significant added value was delivered to the client and many innovations resulted from the collective work of the parties to the contract. It was concluded that project alliances for commercial buildings offer many advantages over traditional project delivery systems, which are related to increasing the levels of collaboration among a project management team.
Supply chain sustainability : a relationship management approach moderated by culture and commitment
Resumo:
This research explores the nature of relationship management on construction projects in Australia and examines the effects of culture, by means of Schwarz’s value survey, on relationships under different contract strategies. The research was based on the view that the development of a sustainable supply chain depends on the transfer of knowledge and capabilities from the larger players in the supply chain through collaboration brought about by relationship management. The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the findings. The aim was to investigate how values and attitudes enhance or reduce the incorporation of the supply chain into the project. From the research it was found that the degree of match and mismatch between values and contract strategy impacts commitment and the engagement and empowerment of the supply chain.
Resumo:
A general mistrust within the contactor and subcontractor companies has identified one of the significant barriers to derive benefits from true downstream supply chain integration. Using the general theory of trust in inter-organizational relations and conducting interviews, this research discusses factors that influence development of trust and cooperation in contractor– subcontractor relationships in construction projects. System dynamics is the simulation method is selected in this theory-building effort, based on qualitative data collected from two projects of a construction company in Thailand. Performance, permeability and system based trust are found to make significant contributions toward parties’ trust level. Three strategic policies such as best value contracting, management of subcontractors as internal team and semi project partnering approach are recommended to stimulate the trust factors as well as cooperative long term relationship.
Resumo:
Highway construction works have significant bearings on all aspects of sustainability. As they typically involve huge capital funds, stakeholders tend to place all interests on the financial justifications of the project, especially when embedding sustainability principles and practices may demand significant initial investment. Increasing public awareness and government policies demand that infrastructure projects respond to environmental challenges and people start to realise the negative consequences of not to pursue sustainability. Stakeholders are now keen to identify sustainable alternatives and financial implications of including them on a whole lifecycle basis. Therefore tools that aid the evaluation of investment options, such as provision of environmentally sustainable features in roads and highways, are highly desirable. Life-cycle cost analysis (LCCA) is generally recognised as a valuable approach for investment decision making for construction works. However to date it has limited application because the current LCCA models tend to focus on economic issues alone and are not able to deal with sustainability factors. This paper reports a research on identifying sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into existing LCCA models to produce a new sustainability based LCCA model with cost elements specific to sustainability measures. This presents highway project stakeholders a practical tool to evaluate investment decisions and reach an optimum balance between financial viability and sustainability deliverables.
Supply chain sustainability : a relationship management approach moderated by culture and commitment
Resumo:
This paper explores the nature of relationship management on construction projects in Australia and examines the effects of culture, by means of Schwarz’s value survey, on relationships under different contract strategies. The research was based on the view that the development of a sustainable supply chain depends on the transfer of knowledge and capabilities from the larger players in the supply chain through collaboration brought about by relationship management. The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the fi ndings. The aim was to investigate how values and attitudes enhance or reduce the incorporation of the supply chain into the project. From the research it was found that the degree of match and mismatch between values and contract strategy impacts commitment and the engagement and empowerment of the supply chain.
Resumo:
Local communities are vulnerable to the potential environmental risks associated with construction activity. Currently, little is understood about how perceptions of environmental risks are shaped and spread within a community. A better understanding of this process can help bridge the gap between developers and communities and bring about more sustainable development practices. This paper reports a research methodology which uses social contagion theory to investigate this process. The research adopts a single case study approach of a highly controversial housing project in the greater Sydney metropolitan area. The case study is particularly significant as it investigates an extensive and on-going community-based protest campaign (dating back almost 20 years) that has generated the longest standing 24 hour community picket in the New South Wales.
Resumo:
Design-build (DB) system has been demonstrated as an effective delivery method and been widely used overseas. However it does not receive the same popularity in the People’s Republic of China (PRC). This paper first conducts a literature review on advantages and disadvantages of DB in general; then it gives an overview of the PRC construction industry. There are ample evidences that the DB system will theoretically bring benefits to the PRC construction industry. After a thorough investigation of the current DB market, it can be concluded that the development of the DB system is still at its infancy stage. The barriers to entry have been finally identified, which relate to the legal restraints, negative owner attitude, and high requirement of DB projects. These barriers constitute obstacles to the development of DB system in the PRC. However, with rapid growth of construction industry, new requirements in modern construction projects, and strong promotion from governments, it is believed that the domestic DB market will have great potential in the near future.
Resumo:
Construction sites around the world employ large numbers of people from diverse cultural backgrounds. The effective management of this cultural diversity has important implications for the productivity, safety, health and welfare of construction workers and for the performance and reputation of firms which employ them. The findings of a three year, multi-staged study of cultural diversity management practices on construction sites are critiqued using social identity theory. This reveals that so called "best-practice" diversity management strategies may have an opposite effect to that intended. It is concluded that the management of diversity on construction projects would benefit from being informed by social identity research.
Resumo:
The design-build (DB) system is a popular and effective delivery method of construction projects worldwide. After owners decide to procure their projects through the DB system, they may wish to determine the optimal proportion of design to be provided in the DB request for proposals (RFPs), which serve as solicitations for design-builders and describe the scope of work. However, this presents difficulties to DB owners and there is little, if any, systematic research in this area. This paper reports on an empirical study in the USA entailing both an online questionnaire survey and Delphi survey to identify and evaluate the factors influencing owners’ decisions in determining the proportion of design to include in DB RFPs. Eleven factors are identified, i.e. (1) clarity of project scope; (2) applicability of performance specifications; (3) desire for design innovation; (4) site constraints; (5) availability of competent design-builders; (6) project control requirements; (7) user group involvement level; (8) third party requirements; (9) owner experience with DB; (10) project complexity; and (11) schedule constraints. A statistically significant agreement on the eleven factors was also obtained from the (mainly non-owner) Delphi experts. Although some of the experts hold different opinions on how these factors affect the proportion of design, these findings furnish various stakeholders with a better understanding of the delivery process of DB projects and the appropriate provision of project information in DB RFPs. As the result is mainly industry opinion concerning the optimal proportion of design, in addition and for completeness, future studies should be conducted to obtain a big picture of the optimal proportion of design by means of seeking owners’ inputs.
Resumo:
The effect of resource management on the building design process directly influences the development cycle time and success of construction projects. This paper presents the information constraint net (ICN) to represent the complex information constraint relations among design activities involved in the building design process. An algorithm is developed to transform the information constraints throughout the ICN into a Petri net model. A resource management model is developed using the ICN to simulate and optimize resource allocation in the design process. An example is provided to justify the proposed model through a simulation analysis of the CPN Tools platform in the detailed structural design. The result demonstrates that the proposed approach can obtain the resource management and optimization needed for shortening the development cycle and optimal allocation of resources.
Resumo:
This report presents the results of Phase 3 of the Innovative Road Products Project: National Focus Groups. The groups developed solutions to address the most important obstacles constraining the adoption of innovative products in Australian road construction projects. The Innovative Products Survey, the major Project deliverable in 2011, and the largest innovation survey ever undertaken in the Australian road consutrction industry, results in the identification of key obstacles constraining the adoption of innovative products on road projects.
Resumo:
The demand of implementing Whole Life Cycle Costing (WLCC) towards property development has increased since the launch of Value Management Circular 3/2009 by the Economic Planning Unit Malaysia. The circular made compulsory for all public construction projects and programme including property development estimated more than RM 50 Million to conduct WLCC. However, a knowledge gap on WLCC approach still exists and become a barrier among the practitioner in Malaysia particularly in property development industry. The main focus of this paper is to discuss the WLCC approach and introduce the indicator that need to be considered in Malaysia property development.
Resumo:
A pressing cost issue facing construction is the procurement of off-site pre-manufactured assemblies. In order to encourage Australian adoption of off-site manufacture (OSM), a new approach to underlying processes is required. The advent of object oriented digital models for construction design assumes intelligent use of data. However, the construction production system relies on traditional methods and data sources and is expected to benefit from the application of well-established business process management techniques. The integration of the old and new data sources allows for the development of business process models which, by capturing typical construction processes involving OSM, provides insights into such processes. This integrative approach is the foundation of research into the use of OSM to increase construction productivity in Australia. The purpose of this study is to develop business process models capturing the procurement, resources and information flow of construction projects. For each stage of the construction value chain, a number of sub-processes are identified. Business Process Modelling Notation (BPMN), a mainstream business process modelling standard, is used to create base-line generic construction process models. These models identify OSM decision-making points that could provide cost reductions in procurement workflow and management systems. This paper reports on phase one of an on-going research aiming to develop a proto-type workflow application that can provide semi-automated support to construction processes involving OSM and assist in decision-making in the adoption of OSM thus contributing to a sustainable built environment.
Resumo:
Public-private partnerships (PPPs) are increasingly used to procure Australian infrastructure projects. As with all construction projects, the early briefing stages are often the most crucial in determining a successful outcome. There is, however, a lack of systematic research on the type and nature of the critical factors affecting the effectiveness and efficiency of PPP during this period. A literature review is presented of PPP usage in Australia, in which four main categories of factors (procurement, stakeholder, risk, and finance) are identified, each with several subfactors. A questionnaire survey involving state government stakeholders is also described, and a mathematical model that ranks the factors involved is developed. This is followed by an examination of the potential of the factors to help improve the PPP briefing stage for both public and private sectors.