769 resultados para Construction Industry
Resumo:
The construction industry is one of major strategic importance. Its level of productivity has a significant effect on national economic growth. The analysis of published census/biannual surveys of construction by the Department of Statistics of Malaysia shows that Malaysia managed to achieve construction labour productivity growth between 1996 and 2005 despite increases in cost per employee. The decrease in unit labour costs is attributed to the value added improvement per worker through the increase in capital intensity. The marginal decline in capital productivity is due to the gestation period and the overcapacity of the industry. The civil engineering sub-sector recorded the highest labour productivity and is the most labour competitive in terms of unit labour cost and added value per labour cost. The residential sub-sectors recorded greatest change in the productivity indicators between 1996 and 2005.
Resumo:
This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.
Resumo:
Construction sector application of Lead Indicators generally and Positive Performance Indicators (PPIs) particularly, are largely seen by the sector as not providing generalizable indicators of safety effectiveness. Similarly, safety culture is often cited as an essential factor in improving safety performance, yet there is no known reliable way of measuring safety culture. This paper proposes that the accurate measurement of safety effectiveness and safety culture is a requirement for assessing safe behaviours, safety knowledge, effective communication and safety performance. Currently there are no standard national or international safety effectiveness indicators (SEIs) that are accepted by the construction industry. The challenge is that quantitative survey instruments developed for measuring safety culture and/ or safety climate are inherently flawed methodologically and do not produce reliable and representative data concerning attitudes to safety. Measures that combine quantitative and qualitative components are needed to provide a clear utility for safety effectiveness indicators.
Resumo:
Value Management (VM) has been proven to provide a structured framework, together with supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It is identified at International level as a natural career progression for the construction service provider and as an opportunity in developing leading-edge skills. The services offered by contractors and consultants in the construction sector have been expanding. In an increasingly competitive and global marketplace, firms are seeking ways to differentiate their services to ever more knowledgeable and demanding clients. The traditional demarcations have given way, and the old definition of what contractors, designers, engineers and quantity surveyors can, and cannot do in terms of their market offering has changed. Project management, design and cost and safety consultancy services, are being delivered by a diverse range of suppliers. Value management services have been developing in various sectors in industry; from manufacturing to the military and now construction. Given the growing evidence that VM has been successful in delivering value-for-money to the client, VM would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector. The recently issued VM Circular 3/2009 by the Economic Planning Unit Malaysia (EPU) possibly marks a new beginning in public sector client acceptance on the strength of VM in construction. This paper therefore attempts to study the prospects of marketing the benefits of VM by construction service providers, and how it may provide an edge in an increasingly competitive Malaysian construction industry.
Resumo:
Life-cycle management (LCM) has been employed in the management of construction projects for many years in order to reduce whole life cost, time, risk and improve the service to owners. However, owing to lack of an effective information sharing platform, the current LCM of construction projects is not effectively used in the construction industry. Based upon the analysis of the information flow of LCM, a virutal prototyping (VP)-based communication and collaboration information platform is proposed. Following this, the platform is customized using DASSAULT sofware. The whole process of implementing the VP-based LCM are also discussed and, from a simple case study, it is demonstrated that the VP-based communication and collaboration information platform is an effective tool to support the LCM of construction projects.
Resumo:
Construction industry observers tout the use of financial incentives as promoters of motivation and commitment on projects. Yet, little empirical evidence exists concerning their effectiveness. What are the drivers of motivation on construction projects? The reasons that construction project participants are motivated to pursue voluntary incentive goals are examined through four Australian case studies. The results demonstrate the critical role played by project relationships and equitable contract conditions in promoting the effectiveness of financial incentives. In the context of a construction project, this study finds financial incentives to be less important to motivation and performance than relationship enhancement initiatives. This finding is unexpected and has implications for the design of project procurement strategies. These results suggest if project clients ignore the importance of relationship quality between participants, the impact of any financial incentive will be compromised.
Resumo:
The dominant economic paradigm currently guiding industry policy making in Australia and much of the rest of the world is the neoclassical approach. Although neoclassical theories acknowledge that growth is driven by innovation, such innovation is exogenous to their standard models and hence often not explored. Instead the focus is on the allocation of scarce resources, where innovation is perceived as an external shock to the system. Indeed, analysis of innovation is largely undertaken by other disciplines, such as evolutionary economics and institutional economics. As more has become known about innovation processes, linear models, based on research and development or market demand, have been replaced by more complex interactive models which emphasise the existence of feedback loops between the actors and activities involved in the commercialisation of ideas (Manley 2003). Currently dominant among these approaches is the national or sectoral innovation system model (Breschi and Malerba 2000; Nelson 1993), which is based on the notion of increasingly open innovation systems (Chesbrough, Vanhaverbeke, and West 2008). This chapter reports on the ‘BRITE Survey’ funded by the Cooperative Research Centre for Construction Innovation which investigated the open sectoral innovation system operating in the Australian construction industry. The BRITE Survey was undertaken in 2004 and it is the largest construction innovation survey ever conducted in Australia. The results reported here give an indication of how construction innovation processes operate, as an example that should be of interest to international audiences interested in construction economics. The questionnaire was based on a broad range of indicators recommended in the OECD’s Community Innovation Survey guidelines (OECD/Eurostat 2005). Although the ABS has recently begun to undertake regular innovation surveys that include the construction industry (2006), they employ a very narrow definition of the industry and only collect very basic data compared to that provided by the BRITE Survey, which is presented in this chapter. The term ‘innovation’ is defined here as a new or significantly improved technology or organisational practice, based broadly on OECD definitions (OECD/Eurostat 2005). Innovation may be technological or organisational in nature and it may be new to the world, or just new to the industry or the business concerned. The definition thus includes the simple adoption of existing technological and organisational advancements. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment. It builds on a pilot innovation survey undertaken by PricewaterhouseCoopers (PWC) for the Australian Construction Industry Forum on behalf of the Australian Commonwealth Department of Industry Tourism and Resources, in 2001 (PWC 2002). The survey responds to an identified need within the Australian construction industry to have accurate and timely innovation data upon which to base effective management strategies and public policies (Focus Group 2004).
Resumo:
In general, the performance of construction projects, including their sustainability performance, does not meet optimal expectations. One aspect of this is the performance of the participants who are independent and make a significance impact on overall project outcomes. Of these participants, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely, time, cost and quality. As the level of satisfaction is a subjective issue, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in an attempt to determine the performance of construction project outcomes - for instance, client satisfaction, customer satisfaction, contractor satisfaction, occupant satisfaction and home buyer satisfaction. These not only identify the performance of the construction project but are also used to improve and maintain relationships. In addition, these assessments are necessary for the continuous improvement and enhanced cooperation of participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparative standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may possibly be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This chapter examines the methods commonly practised in measuring satisfaction levels today and the advantages of promoting these methods. The results provide a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods to use in identifying the performance of project outcomes.
Resumo:
Purpose – The construction industry in Australia is characterised by a long work-hours culture, with conditions that make it difficult for staff to balance their work and non-work lives. The objective of this paper is to measure the success of a work-place intervention designed to improve work-life balance (WLB) in an alliance project in the construction industry, and the role the project manager plays in this success. Design/methodology/approach – The paper focuses on an alliance case study. Interviews were conducted at two points in time, several months apart, after the interventions were implemented. Findings – Results showed that staff on the whole were more satisfied with their work experience after the interventions, and indicated the important role that managers' attitudes and behaviours played. Originality/value – Managerial support for work-life initiatives is a critical element in achieving WLB and satisfaction with working arrangements. The fact that the manager “talked the talk and walked the walk” was a major contributing success factor, which has not previously been demonstrated.
Resumo:
The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.
Resumo:
Expenditure on R&D in the China construction industry has been relatively low in comparison with many developed countries for a number of years – a situation considered to be a major barrier to the industry’s competitiveness in general and unsatisfactory industry development of the 31 regions involved. A major problem with this is the lack of a sufficiently sophisticated method of objectively evaluating R&D activity in what are quite complex circumstances considering the size and regional differences that exist in this part of the world. A regional construction R&D evaluation system (RCRES) is presented aimed at rectifying the situation. This is based on 12 indicators drawn from the Chinese Government’s R&D Inventory of Resources in consultation with a small group of experts in the field, and further factor analysed into three groups. From this, the required evaluation is obtained by a simple formula. Examination of the results provides a ranking list of the R&D performance of each of the 31 regions, indicating a general disproportion between coastal and inland regions and highlighting regions receiving special emphasis or currently lacking in development. The understanding on this is vital for the future of China’s construction industry.
Resumo:
It is recognized that, in general, the performance of construction projects does not meet optimal expectations. One aspect of this is the performance of each participant, which is interdependent and makes a significance impact on overall project outcomes. Of these, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely time, cost and quality. As the level of satisfaction is a subjective measurement, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in attempting to determine the performance of construction project outcomes – for instance client satisfaction, consultant satisfaction, contractor satisfaction, customer satisfaction and home buyer satisfaction. These not only identify the performance of the construction project, but are also used to improve and maintain relationships. In addition, these assessments are necessary for continuous improvement and enhanced cooperation between participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparison standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This paper examines the current methods commonly practiced in measuring satisfaction level and the advantages of promoting these methods. The results provided are a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods for use in identifying the performance of project outcomes.