891 resultados para Complex Project Management
Resumo:
Microsoft Project is one of the most-widely used software packages for project management. For the scheduling of resource-constrained projects, the package applies a priority-based procedure using a specific schedule-generation scheme. This procedure performs relatively poorly when compared against other software packages or state-of-the-art methods for resource-constrained project scheduling. In Microsoft Project 2010, it is possible to work with schedules that are infeasible with respect to the precedence or the resource constraints. We propose a novel schedule-generation scheme that makes use of this possibility. Under this scheme, the project tasks are scheduled sequentially while taking into account all temporal and resource constraints that a user can define within Microsoft Project. The scheme can be implemented as a priority-rule based heuristic procedure. Our computational results for two real-world construction projects indicate that this procedure outperforms the built-in procedure of Microsoft Project
Resumo:
For executing the activities of a project, one or several resources are required, which are in general scarce. Many resource-allocation methods assume that the usage of these resources by an activity is constant during execution; in practice, however, the project manager may vary resource usage by individual activities over time within prescribed bounds. This variation gives rise to the project scheduling problem which consists in allocating the scarce resources to the project activities over time such that the project duration is minimized, the total number of resource units allocated equals the prescribed work content of each activity, and precedence and various work-content-related constraints are met.
Resumo:
Experiences relating to the InternationalMasters in Rural Development from the Technical University of Madrid (Universidad Politécnica de Madrid, UPM), the first Spanish programme to receive a mention as a Registered Education Programme by InternationalProject Management Association (IPMA) are considered. Backed by an educational strategy based on Project-Based Learning dating back twenty years, this programme has managed to adapt to the competence evaluation requirements proposed by the European Space for Higher Education (ESHE). In order to do this the training is linked to the professional qualification using competences as a reference leading to the qualification in project management as established by the IPMA.
Resumo:
La crisis afecta a todos los sectores, es un terremoto en cadena que se inicio en el sector inmobiliario y se ha ido introduciendo en el resto. Todo esto ha dado lugar a una caída brusca de la demanda de los servicios relacionados con la construcción, con un posicionamiento en “espera” de los Promotores e Inversores, que aún tienen liquidez para invertir, buscando oportunidades que lógicamente se tienen que producir en un entorno escasamente fiable como el actual. Aquellos Inversores que vean oportunidades, se aseguraran de que los productos que van a realizar, tengan una demanda suficiente, sus costes estén en consonancia con el mercado, pero sin que aquello perjudique al resultado final, es decir manteniendo la calidad propuesta al inicio del proceso con los costes previstos, dando lugar a un control exhaustivo del producto a realizar, lo cual obligará a una gran profesionalidad por parte de los agentes implicados. Para todo esto habrá que contar con Empresas especializadas, que aporten garantías en este proceso y aseguren tanto al promotor como al Inversor en todo momento donde y en que se invierten sus recursos. La Dirección Integrada de Proyecto (“Project Management “) aplicada al proceso constructivo es una Técnica Metodológica que ayuda a organizar, controlar y gestionar los recursos de los promotores dentro del proceso edificatorio. Cuando los recursos están limitados (que normalmente es la mayoría de las situaciones) gestionarlos de una manera eficiente se convierte en algo muy importante. Bien, pues nos encontramos con que en esta situación actual, los recursos no solo están limitados, si no que son limitados, por lo que un control y un exhaustivo seguimiento de los mismos se convierte no solo en importante si no en fundamental.
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
Personalized health (p-health) systems can contribute significantly to the sustainability of healthcare systems, though their feasibility is yet to be proven. One of the problems related to their development is the lack of well-established development tools for this domain. As the p-health paradigm is focused on patient self-management, big challenges arise around the design and implementation of patient systems. This paper presents a reference platform created for the development of these applications, and shows the advantages of its adoption in a complex project dealing with cardio-vascular diseases.
Resumo:
In this work, the power management techniques implemented in a high-performance node for Wireless Sensor Networks (WSN) based on a RAM-based FPGA are presented. This new node custom architecture is intended for high-end WSN applications that include complex sensor management like video cameras, high compute demanding tasks such as image encoding or robust encryption, and/or higher data bandwidth needs. In the case of these complex processing tasks, yet maintaining low power design requirements, it can be shown that the combination of different techniques such as extensive HW algorithm mapping, smart management of power islands to selectively switch on and off components, smart and low-energy partial reconfiguration, an adequate set of save energy modes and wake up options, all combined, may yield energy results that may compete and improve energy usage of typical low power microcontrollers used in many WSN node architectures. Actually, results show that higher complexity tasks are in favor of HW based platforms, while the flexibility achieved by dynamic and partial reconfiguration techniques could be comparable to SW based solutions.
Resumo:
En los últimos años hemos sido testigos de la creciente demanda de software para resolver problemas cada vez más complejos y de mayor valor agregado. Bajo estas circunstancias, nos podemos hacer la siguiente pregunta: ¿Está preparada la industria de software para entregar el software que se necesita en los próximos años, de acuerdo con las demandas del cliente? Hoy en día, muchos expertos creen que el éxito de esta industria dependerá de su capacidad para gestionar los proyectos, las personas y los recursos. En este sentido, la gestión de proyectos es un factor clave para el éxito de los proyectos software en todo el mundo. Además, considerando que las Pequeñas y Medianas Empresas de software (PYMEs) representan el 99,87% de las empresas españolas, es vital para este tipo de empresas la implementación de los procesos involucrados con la gestión de proyectos. Es cierto que existen muchos modelos que mejoran la eficacia de la gestión de proyectos, pero la mayoría de ellos se centra únicamente en dos procesos: la planificación del proyecto y la monitorización y control del proyecto, ninguno de los cuales a menudo es asequible para las PYMEs. Estos modelos se basan en el consenso de un grupo de trabajo designado para establecer cómo debe ser gestionado el proceso software. Los modelos son bastante útiles ya que proporcionan lineamientos generales sobre dónde empezar a mejorar la gestión de los proyectos, y en qué orden, a personas que no saben cómo hacerlo. Sin embargo, como se ha dicho anteriormente, la mayoría de estos modelos solamente funcionan en escenarios dentro de las grandes empresas. Por lo tanto, es necesario adaptar los modelos y herramientas para el contexto de PYMEs. Esta tesis doctoral presenta una solución complementaria basada en la aplicación de un metamodelo. Este metamodelo es creado para mejorar la calidad de los procesos de la gestión de proyectos a través de la incorporación de prácticas eficaces identificadas a través del análisis y estudio de los modelos y normas existentes relacionadas con la gestión de proyectos. viii ProMEP – Metamodelo para la gestión de proyectos Por lo tanto, el metamodelo PROMEP (Gestión de Proyectos basada en Prácticas Efectivas) permitirá establecer un proceso estándar de gestión de proyectos que puede adaptarse a los proyectos de cada empresa a través de dos pasos: En primer lugar, para obtener una fotografía instantánea (o base) de los procesos de gestión de proyectos de las PYMEs se creó un cuestionario de dos fases para identificar tanto las prácticas realizadas y como las no realizadas. El cuestionario propuesto se basa en el Modelo de Madurez y Capacidad Integrado para el Desarrollo v1.2 (CMMI-DEV v1.2). Como resultado adicional, se espera que la aplicación de este cuestionario ayude a las PYMEs a identificar aquellas prácticas que se llevan a cabo, pero no son documentadas, aquellas que necesitan más atención, y aquellas que no se realizan debido a la mala gestión o al desconocimiento. En segundo lugar, para apoyar fácilmente y eficazmente las tareas de gestión de proyectos software del metamodelo PROMEP, se diseñó una biblioteca de activos de proceso (PAL) para apoyar la definición de los procesos de gestión de proyectos y realizar una gestión cuantitativa de cada proyecto de las PYMEs. Ambos pasos se han implementado como una herramienta computacional que apoya nuestro enfoque de metamodelo. En concreto, la presente investigación propone la construcción del metamodelo PROMEP para aquellas PYMEs que desarrollan productos software de tal forma que les permita planificar, monitorizar y controlar sus proyectos software, identificar los riesgos y tomar las medidas correctivas necesarias, establecer y mantener un conjunto de activos de proceso, definir un mecanismo cuantitativo para predecir el rendimiento de los procesos, y obtener información de mejora. Por lo tanto, nuestro estudio sugiere un metamodelo alternativo para lograr mayores niveles de rendimiento en los entornos de PYMEs. Así, el objetivo principal de esta tesis es ayudar a reducir los excesos de trabajo y el tiempo de entrega, y aumentar así la calidad del software producido en este tipo de organizaciones. Abstract In recent years we have been witnessing the increasing demand for software to solve more and more complex tasks and greater added value. Under these circumstances, we can ourselves the following question: Is the software industry prepared to deliver the software that is needed in the coming years, according to client demands? Nowadays, many experts believe that the industry’ success will depend on its capacity to manage the projects, people and resources. In this sense, project management is a key factor for software project success around the world. Moreover, taking into account that small and medium-sized software enterprises (SMSe) are the 99.87% of the Spanish enterprises, it is vital for this type of enterprises to implement the processes involved in project management. It is true that there are many models that improve the project management effectiveness, but most of them are focused only on two processes: project planning and project monitoring and control, neither of which is affordable for SMSe. Such models are based on the consensus of a designated working group on how software process should be managed. They are very useful in that they provide general guidelines on where to start improving the project management, and in which order, to people who do not know how to do it. However, as we said, the majority of these models have only worked in scenarios within large companies. So, it is necessary to adapt these models and tools to the context of SMSe. A complementary solution based on the implementation of a metamodel is presented in this thesis. This metamodel is created to improve the quality of project management processes through the incorporation of effective practices identified through the analysis and study of relevant models and standards related to project management. Thus, the PROMEP (PROject Management based on Effective Practices) metamodel will allow establishing a project management standard process to be tailored to each enterprise’s project through two steps: Firstly, to obtain a baseline snapshot of project management processes in SMSe a two-phase questionnaire was created to identify both performed and nonperformed practices. The x ProMEP – Metamodelo para la gestión de proyectos proposed questionnaire is based on Capability Maturity Model Integration for Development v1.2. As additional result, it is expected that the application of the questionnaire to the processes will help SMSe to identify those practices which are performed but not documented, which practices need more attention, and which are not implemented due to bad management or unawareness. Secondly, to easily an effectively support the software project management tasks in the PROMEP metamodel, a Process Asset Library (PAL) is designed to support the definition of project management processes and to achieve quantitative project management in SMSe. Both steps have been implemented as a computational tool that supports our metamodel approach. Concretely, the present research proposes the accomplishment of the PROMEP metamodel for those SMSe which develop software products and enable them to plan, supervise and control their software projects, identify risks and take corrective actions, establish and maintain a set of process assets, define quantitative models that predict the process performance, and provide improvement information. So, our study suggests an alternative metamodel to achieve higher performance levels in the SMSe environments. The main objective of this thesis is help to reduce software overruns and delivery time, and increase software quality in these types of organizations.