948 resultados para CRC for Construction Innovation
Resumo:
This project is an extension of a previous CRC project (220-059-B) which developed a program for life prediction of gutters in Queensland schools. A number of sources of information on service life of metallic building components were formed into databases linked to a Case-Based Reasoning Engine which extracted relevant cases from each source.
Resumo:
This project is an extension of a previous CRC project (220-059-B) which developed a program for life prediction of gutters in Queensland schools. A number of sources of information on service life of metallic building components were formed into databases linked to a Case-Based Reasoning Engine which extracted relevant cases from each source. In the initial software, no attempt was made to choose between the results offered or construct a case for retention in the casebase. In this phase of the project, alternative data mining techniques will be explored and evaluated. A process for selecting a unique service life prediction for each query will also be investigated. This report summarises the initial evaluation of several data mining techniques.
Resumo:
In the previous phase of this project, 2002-059-B Case-Based Reasoning in Construction and Infrastructure Projects, demonstration software was developed using a case-base reasoning engine to access a number of sources of information on lifetime of metallic building components. One source of information was data from the Queensland Department of Public Housing relating to maintenance operations over a number of years. Maintenance information is seen as being a particularly useful source of data about service life of building components as it relates to actual performance of materials in the working environment. If a building is constructed in 1984 and the maintenance records indicate that the guttering was replaced in 2006, then the service life of the gutters was 22 years in that environment. This phase of the project aims to look more deeply at the Department of Housing data, as an example of maintenance records, and formulate methods for using this data to inform the knowledge of service lifetimes.
Resumo:
This project is an extension of a previous CRC project (220-059-B) which developed a program for life prediction of gutters in Queensland schools. A number of sources of information on service life of metallic building components were formed into databases linked to a Case-Based Reasoning Engine which extracted relevant cases from each source.
Resumo:
Maintenance of bridge structures is a major issue for the Queensland Department of Main Roads. In the previous phase of this CRC project an initial approach was made towards the development of a program for lifetime prediction of metallic bridge components. This involved the analysis of five representative bridge structures with respect to salt deposition (a major contributor to metallic corrosion) to determine common elements to be used as “cases” - those defined for buildings are not applicable. The five bridges analysed included the Gladstone Port Access Road Overpass, Stewart Road Overpass, South Johnstone River Bridge, Johnson Creek Bridge and the Ward River Bridge.
Resumo:
A survey of a number of schools in a number of different climates was carried out to determine the condition of building components of interest in the project. Schools in Melbourne, the Victorian Surf Coast, Brisbane, Townsville and the Sunshine Coast were inspected. A rating system was devised to categorise the components and the results collated in tables. Analysis of the data (where sufficient examples permitted) resulted in formulae to predict the service of the components and a database was derived.
Resumo:
This report documents work carried out in order to develop and prove a model for predicting the lifetime of painted metal components, with a particular emphasis on Colorbond® due to its prominent use throughout Australia. This work continues on from previous developments reported in 2002-059-B No. 12 [1]. Extensions of work included the following research: (1) Experimental proving of the leaching of chromate inhibitors from Colorbond® materials. (2) Updated models for the accumulation of salts and the time of wetness for gutters, based upon field observations. (3) Electrochemical Impedance Spectroscopy investigations aimed at correlating the corrosion rates of weathered Colorbond® with those predicted by modeling.
Resumo:
The project has further developed two programs for the industry partners related to service life prediction and salt deposition. The program for Queensland Department of Main Roads which predicts salt deposition on different bridge structures at any point in Queensland has been further refined by looking at more variables. It was found that the height of the bridge significantly affects the salt deposition levels only when very close to the coast. However the effect of natural cleaning of salt by rainfall was incorporated into the program. The user interface allows selection of a location in Queensland, followed by a bridge component. The program then predicts the annual salt deposition rate and rates the likely severity of the environment. The service life prediction program for the Queensland Department of Public Works has been expanded to include 10 common building components, in a variety of environments. Data mining procedures have been used to develop the program and increase the usefulness of the application. A Query Based Learning System (QBLS) has been developed which is based on a data-centric model with extensions to provide support for user interaction. The program is based on number of sources of information about the service life of building components. These include the Delphi survey, the CSIRO Holistic model and a school survey. During the project, the Holistic model was modified for each building component and databases generated for the locations of all Queensland schools. Experiments were carried out to verify and provide parameters for the modelling. These included instrumentation of a downpipe, measurements on pH and chloride levels in leaf litter, EIS measurements and chromate leaching from Colorbond materials and dose tests to measure corrosion rates of new materials. A further database was also generated for inclusion in the program through a large school survey. Over 30 schools in a range of environments from tropical coastal to temperate inland were visited and the condition of the building components rated on a scale of 0-5. The data was analysed and used to calculate an average service life for each component/material combination in the environments, where sufficient examples were available.
Resumo:
The Your Building Project to build a website as the business and technical guide to sustainable commercial buildings has now been completed. The site is available at www.yourbuilding.org. The project was delivered to meet the requirements of the funding agreement between the Commonwealth of Australia represented by the Department of the Environment and Heritage (now Department of the Environment and Water Resources) and the Cooperative Research Centre for Construction Innovation (Construction Innovation).
Resumo:
This feasibility study was established to investigate the application of the concept of ‘best value’ in construction procurement in Australia. In the case of ‘best value’ in the business enterprise, ‘best value’ is that which returns greatest value to the business enterprise’s shareholders. However, in the case of the public sector, ‘best value’ is more complex. For that reason, this research project focuses mainly on public sector construction project procurement.
Resumo:
This is the first interim report on the Cost of Tendering component of the Best Value project. This report provides some insight from ‘cost of tendering’ literature and discussions with CRC partners. With the completion of this scoping project, sufficient understanding will be developed to determine the need for more detailed research. This scoping project does not intend to provide guidance for the way to change the tendering process, although a need will be demonstrated for control and reduction of cost of tendering.
Resumo:
This first interim report on ‘best value’ reviewed the academic literature relating to ‘best value’ and illustrated the varying interpretations that the concept of ‘best value’ has attracted. It also examined current state of the literature on best value in construction project procurement. ‘Best value’ was explored from the perspective of both the business enterprise and public sector. It was concluded that ‘best value’ in the public sector is considerably more complex. This second interim report explores how ‘best value’ has been implemented in the UK. Focus is directed towards the UK, particularly Scotland’s approach to examine the complexity of implementation of ‘best value’ in the public sector context. Scotland has been recognised as a leader in the field of ‘best value’ in the public sector (Curry, 1999; Wisniewski and Stewart, 2001, 2004; Jaconelli and Sheffield, 2000)
Resumo:
This is the final report of research project 2002-057-C: Enabling Team Collaboration with Pervasive and Mobile Computing. The research project was carried out by the Australian Cooperative Research Centre for Construction Innovation and has two streams that consider the use of pervasive computing technologies in two different contexts. The first context was the on-site deployment of mobile computing devices, where as the second context was the use and development of intelligent rooms based on sensed environments and new human-computer interfaces (HCI) for collaboration in the design office. The two streams present a model of team collaboration that relies on continues communication to people and information to reduce information leakage. This report consists of five sections: (1) Introduction; (2) Research Project Background; (3) Project Implementation; (4) Case Studies and Outcomes; and (5) Conclusion and Recommendation. Introduction in Section 1 presents a brief description of the research project including general research objectives and structure. Section 2 introduces the background of the research and detailed information regarding project participants, objectives and significance, and also research methodology. Review of all research activities such as literature review and case studies are summarised in Project Implementation in Section 3. Following this, in Section 4 the report then focuses on analysing the case studies and presents their outcomes. Conclusion and recommendation of the research project are summarised in Section 5. Other information to support the content of the report such as research project schedule is provided in Appendices. The purpose of the final project report is to provide industry partners with detailed information on the project activities and methodology such as the implementation of pervasive computing technologies in the real contexts. The report summarises the outcomes of the case studies and provides necessary recommendation to industry partners of using new technologies to support better project collaboration.