998 resultados para CAT project
Resumo:
In this paper, we develop a conceptual model to explore the perceived complementary congruence between complex project leaders and the demands of the complex project environment to understand how leaders’ affective and behavioural performance at work might be impacted by this fit. We propose that complex project leaders high in emotional intelligence and cognitive flexibility should report a higher level of fit between themselves and the complex project environment. This abilities-demands measure of fit should then relate to affective and behavioural performance outcomes, such that leaders who perceive a higher level of fit should establish and maintain more effective, higher quality project stakeholder relationships than leaders who perceive a lower level of fit.
Resumo:
Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.
Resumo:
Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.
Resumo:
In this paper, an ‘ecological’ lens is applied to an independent living project aiming to provide ‘homes for life’ for adult children with disabilities. The qualities of the project as ecological praxis are highlighted along with the implications for an open-ended enquiry into ecologies for and of the interior. In terms of the ecological concern for intimate modes of being, interior design is shown to be well placed through its association with environments in which people spend most of their life and through powerful concepts such as ‘interiority’ and ‘home’ which link to fundamental existential notions of ‘self ’ and ‘identity’. However, despite the interior being a significant generative force, this has not happened to the exclusion of other disciplines. Ignoring territorial urges to claim areas and concepts as one’s own, the paper describes how the project has actively encouraged design disciplines to trespass in each other’s territories. Ecologies for and of the interior, while recognising the need for discipline emphasis, also demand an integrated and collective approach through what is in effect transdisciplinary practice.
Resumo:
The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked to determine which projects should be funded now and which can be postponed until a later year. Currently, each district uses locally developed methods to prioritize projects. These ranking methods have relied on less formal qualitative assessments based on engineers’ subjective judgment. It is important for TxDOT to have a 4-Year Pavement Management Plan that uses a transparent, rational project ranking process. The objective of this study is to develop a conceptual framework that describes the development of the 4-Year Pavement Management Plan. It can be largely divided into three Steps; 1) Network-Level project screening process, 2) Project-Level project ranking process, and 3) Economic Analysis. A rational pavement management procedure and a project ranking method accepted by districts and the TxDOT administration will maximize efficiency in budget allocations and will potentially help improve pavement condition. As a part of the implementation of the 4-Year Pavement Management Plan, the Network-Level Project Screening (NLPS) tool including the candidate project identification algorithm and the preliminary project ranking matrix was developed. The NLPS has been used by the Austin District Pavement Engineer (DPE) to evaluate PMIS (Pavement Management Information System) data and to prepare a preliminary list of candidate projects for further evaluation.
Resumo:
In an attempt to enhance the efficiency, productivity and competitiveness of today’s Architectural, Engineering, and Contractor (AEC) industry, this paper summarises the current status of an ongoing PhD research investigation in developing a sustainable AEC industry specific best-practice ‘Innovation-driven Change Framework’—more specifically a summation of the ‘fourth interrelated dynamic’ (culture). Leveraging off the outcomes of a two year industry and government supported Cooperative Research Centre for Construction Innovation (CRCCI) research project, as well as referring to recent internationally renowned case studies and related literature investigations, this research investigation includes further identifying, processing, analysing and categorizing various culture change methods, models, frameworks and processes utilized within the AEC and other industry sectors, and incorporating these findings in developing an AEC industry-specific ‘Innovation-driven Change Framework’
Resumo:
Under pressure from both the ever increasing level of market competition and the global financial crisis, clients in consumer electronics (CE) industry are keen to understand how to choose the most appropriate procurement method and hence to improve their competitiveness. Four rounds of Delphi questionnaire survey were conducted with 12 experts in order to identify the most appropriate procurement method in the Hong Kong CE industry. Five key selection criteria in the CE industry are highlighted, including product quality, capability, price competition, flexibility and speed. This study also revealed that product quality was found to be the most important criteria for the “First type used commercially” and “Major functional improvements” projects. As for “Minor functional improvements” projects, price competition was the most crucial factor to be considered during the PP selection. These research findings provide owners with useful insights to select the procurement strategies.
Resumo:
Recent years have seen a rapid increase in SMEs working collaboratively in inter-organizational projects. But what drives the emergence of such projects, and what types of industries breed them the most? To address these questions, this paper extends the long running literature on the firm and industry antecedents of new venturing and alliance formation to the domain of project-based organization by SMEs. Based on survey data collected among 1,725 small and medium sized organizations and longitudinal industry data, we find an overall pattern that indicates that IOPV participation is primarily determined by a focal SME’s scope of innovative activities, and the munificence, dynamism and complexity of its environment. Unexpectedly, these variables have different effects on whether SMEs are likely to engage in IOPVs, compared to with how many there are in their portfolio at a time. Implications for theory development are discussed.
Resumo:
Discovering factors that help or impede business model change is an important quest, both for researchers and practitioners. In this study we present preliminary findings based on the CAUSEE survey of young and nascent firms in Australia. In particular, we seek to determine an association between business model adaptation and external orientation among young and nascent firms within the random sample and amongst an oversample of high potential firms. The concept of external orientation is made operational by asking respondents whether, and to what extent, they rely on certain sources of advice and information. We find that high potential firms are more likely to have made at least some change to their business model, that greater use of external sources of advice is generally significantly associated with business model adaptation, but also that there appear to be different patterns of behaviour between the random sample and the over sample.
Resumo:
This study assessed the validity of a scale measuring psychologists' attitudes towards complementary and alternative therapies and compared the attitudes of psychologists with a previous sample of psychology students. The scale, derived from existing measures for medical professionals and previously tested on a sample of psychology students, was completed by practising psychologists (N = 122). The data were factor analysed, and three correlated subscales were identified, assessing the perceived importance of knowledge about available therapies, attitudes towards integration with psychological practice, and concerns about associated risks of use. This structure was similar, but not identical, to that found in a previous sample of psychology students; however, psychologists expressed more concern for risks associated with integration and were less likely to hold a positive attitude towards integration. This scale will be useful in gauging changes in psychologists' attitudes towards integrative practice over time.
Resumo:
Background: Access to cardiac services is essential for appropriate implementation of evidence-based therapies to improve outcomes. The Cardiac Accessibility and Remoteness Index for Australia (Cardiac ARIA) aimed to derive an objective, geographic measure reflecting access to cardiac services. Methods: An expert panel defined an evidence-based clinical pathway. Using Geographic Information Systems (GIS), a numeric/alpha index was developed at two points along the continuum of care. The acute category (numeric) measured the time from the emergency call to arrival at an appropriate medical facility via road ambulance. The aftercare category (alpha) measured access to four basic services (family doctor, pharmacy, cardiac rehabilitation, and pathology services) when a patient returned to their community. Results: The numeric index ranged from 1 (access to principle referral center with cardiac catheterization service ≤ 1 hour) to 8 (no ambulance service, > 3 hours to medical facility, air transport required). The alphabetic index ranged from A (all 4 services available within 1 hour drive-time) to E (no services available within 1 hour). 13.9 million (71%) Australians resided within Cardiac ARIA 1A locations (hospital with cardiac catheterization laboratory and all aftercare within 1 hour). Those outside Cardiac 1A were over-represented by people aged over 65 years (32%) and Indigenous people (60%). Conclusion: The Cardiac ARIA index demonstrated substantial inequity in access to cardiac services in Australia. This methodology can be used to inform cardiology health service planning and the methodology could be applied to other common disease states within other regions of the world.
Resumo:
This final report outlines the research conducted by the Centre for Accident Research and Road Safety – Queensland (CARRS-Q) for the research project (title above). This report provides an outline of the project methodology, literature review, three stages of research results (including the focus group discussions, review of organisational records, documentation and initiatives, and analysis of previous CARRS-Q occupational road safety self-report surveys), and recommendations for intervention strategy and initiatives development and implementation.
Resumo:
Purpose – The purpose of this paper is to provide of a review of the theory and models underlying project management (PM) research degrees that encourage reflective learning. Design/methodology/approach – Review of the literature and reflection on the practice of being actively involved in conducting and supervising academic research and disseminating academic output. The paper argues the case for the potential usefulness of reflective academic research to PM practitioners. It also highlights theoretical drivers of and barriers to reflective academic research by PM practitioners. Findings – A reflective learning approach to research can drive practical results though it requires a great deal of commitment and support by both academic and industry partners. Practical implications – This paper suggests how PM practitioners can engage in academic research that has practical outcomes and how to be more effective at disseminating these research outcomes. Originality/value – Advanced academic degrees, in particular those completed by PM practitioners, can validate a valuable source of innovative ideas and approaches that should be more quickly absorbed into the PM profession’s sources of knowledge. The value of this paper is to critically review and facilitate a reduced adaptation time for implementation of useful reflective academic research to industry.
Resumo:
Purpose – The purpose of this paper is to present a cost-benefit interpretation of academic-practitioner research by describing and analysing several recent relevant examples of academic-practitioner research with a focus on doctoral theses carried out at universities and business schools in clusters of research centred in North America, Australia and Europe. Design/methodology/approach – Using case study examples, a value proposition framework for undertaking collaborative research for higher degree level study is developed and presented. Findings – Value proposition benefits from this level of collaborative research can be summarised as enhancing competencies at the individual and organisational level as well as providing participating universities with high-quality candidates/students and opportunities for industry engagement. The project management (PM) professional bodies can also extend PM knowledge but they need to be prepared to provide active support. Practical implications – A model for better defining the value proposition of collaborative research from a range of stakeholder perspectives is offered that can be adapted for researchers and industry research sponsors. Originality/value – Few papers offer a value proposition framework for explaining collaborative research benefits. This paper addresses that need.
Resumo:
The paper introduces the underlying principles and the general features of a meta-method (MAP method) developed as part of and used in various research, education and professional development programmes at ESC Lille. This method aims at providing effective and efficient structure and process for acting and learning in various complex, uncertain and ambiguous managerial situations (projects, programmes, portfolios). The paper is developed around three main parts. First, I suggest revisiting the dominant vision of the project management knowledge field, based on the assumptions they are not addressing adequately current business and management contexts and situations, and that competencies in management of entrepreneurial activities are the sources of creation of value for organisations. Then, grounded on the former developments, I introduce the underlying concepts supporting MAP method seen as a ‘convention generator’ and how this meta method inextricably links learning and practice in addressing managerial situations. Finally, I briefly describe an example of application, illustrating with a case study how the method integrates Project Management Governance, and give few examples of use in Management Education and Professional Development.