983 resultados para Accident risk forecasting.


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background UCP2 (uncoupling protein 2) plays an important role in cardiovascular diseases and recent studies have suggested that the A55V polymorphism can cause UCP2 dysfunction. The main aim was to investigate the association of A55V polymorphism with cardiovascular events in a group of 611 patients enrolled in the Medical, Angioplasty or Surgery Study II (MASS II), a randomized trial comparing treatments for patients with coronary artery disease and preserved left ventricular function. Methods The participants of the MASS II were genotyped for the A55V polymorphism using allele-specific PCR assay. Survival curves were calculated with the Kaplan–Meier method and evaluated with the log-rank statistic. The relationship between baseline variables and the composite end-point of cardiac death, acute myocardial infarction (AMI), refractory angina requiring revascularization and cerebrovascular accident were assessed using a Cox proportional hazards survival model. Results There were no significant differences for baseline variables according genotypes. After 2 years of follow-up, dysglycemic patients harboring the VV genotype had higher occurrence of AMI (p=0.026), Death+AMI (p=0.033), new revascularization intervention (p=0.009) and combined events (p=0.037) as compared with patients carrying other genotypes. This association was not evident in normoglycemic patients. Conclusions These findings support the hypothesis that A55V polymorphism is associated with UCP2 functional alterations that increase the risk of cardiovascular events in patients with previous coronary artery disease and dysglycemia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The hydrologic risk (and the hydro-geologic one, closely related to it) is, and has always been, a very relevant issue, due to the severe consequences that may be provoked by a flooding or by waters in general in terms of human and economic losses. Floods are natural phenomena, often catastrophic, and cannot be avoided, but their damages can be reduced if they are predicted sufficiently in advance. For this reason, the flood forecasting plays an essential role in the hydro-geological and hydrological risk prevention. Thanks to the development of sophisticated meteorological, hydrologic and hydraulic models, in recent decades the flood forecasting has made a significant progress, nonetheless, models are imperfect, which means that we are still left with a residual uncertainty on what will actually happen. In this thesis, this type of uncertainty is what will be discussed and analyzed. In operational problems, it is possible to affirm that the ultimate aim of forecasting systems is not to reproduce the river behavior, but this is only a means through which reducing the uncertainty associated to what will happen as a consequence of a precipitation event. In other words, the main objective is to assess whether or not preventive interventions should be adopted and which operational strategy may represent the best option. The main problem for a decision maker is to interpret model results and translate them into an effective intervention strategy. To make this possible, it is necessary to clearly define what is meant by uncertainty, since in the literature confusion is often made on this issue. Therefore, the first objective of this thesis is to clarify this concept, starting with a key question: should be the choice of the intervention strategy to adopt based on the evaluation of the model prediction based on its ability to represent the reality or on the evaluation of what actually will happen on the basis of the information given by the model forecast? Once the previous idea is made unambiguous, the other main concern of this work is to develope a tool that can provide an effective decision support, making possible doing objective and realistic risk evaluations. In particular, such tool should be able to provide an uncertainty assessment as accurate as possible. This means primarily three things: it must be able to correctly combine all the available deterministic forecasts, it must assess the probability distribution of the predicted quantity and it must quantify the flooding probability. Furthermore, given that the time to implement prevention strategies is often limited, the flooding probability will have to be linked to the time of occurrence. For this reason, it is necessary to quantify the flooding probability within a horizon time related to that required to implement the intervention strategy and it is also necessary to assess the probability of the flooding time.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background. A sizable group of patients with symptomatic aortic stenosis (AS) can undergo neither surgical aortic valve replacement (AVR) nor transcatheter aortic valve implantation (TAVI) because of clinical contraindications. The aim of this study was to assess the potential role of balloon aortic valvuloplasty (BAV) as a “bridge-to-decision” in selected patients with severe AS and potentially reversible contraindications to definitive treatment. Methods. We retrospectively enrolled 645 patients who underwent first BAV at our Institution between July 2007 and December 2012. Of these, the 202 patients (31.2%) who underwent BAV as bridge-to-decision (BTD) requiring clinical re-evaluation represented our study population. BTD patients were further subdivided in 5 groups: low left ventricular ejection fraction; mitral regurgitation grade ≥3; frailty; hemodynamic instability; comorbidity. The main objective of the study was to evaluate how BAV influenced the final treatment strategy in the whole BTD group and in its single specific subgroups. Results. Mean logistic EuroSCORE was 23.5±15.3%, mean age was 81±7 years. Mean transaortic gradient decreased from 47±17 mmHg to 33±14 mmHg. Of the 193 patients with BTD-BAV who received a second heart team evaluation, 72.5% were finally deemed eligible for definitive treatment (25.4%for AVR; 47.2% for TAVI): respectively, 96.7% of patients with left ventricular ejection fraction recovery; 70.5% of patients with mitral regurgitation reduction; 75.7% of patients who underwent BAV in clinical hemodynamic instability; 69.2% of frail patients and 68% of patients who presented relevant comorbidities. 27.5% of the study population was deemed ineligible for definitive treatment and treated with standard therapy/repeated BAV. In-hospital mortality was 4.5%, cerebrovascular accident occurred in 1% and overall vascular complications were 4% (0.5% major; 3.5% minor). Conclusions. Balloon aortic valvuloplasty should be considered as bridge-to-decision in high-risk patients with severe aortic stenosis who cannot be immediate candidates for definitive percutaneous or surgical treatment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We present the case of a 48-year old man who, eight years after an industrial accident, presents with chronic right-sided nondermatomal pain and hypaesthesia to heat and touch. During symmetric peripheral touch functional magnetic resonance imaging revealed hypometabolism in the left thalamus, somatosensory cortex, and anterior cingulate cortex. Pain-associated nondermatomal somatosensory deficits (NDSDs) localizing to one side of the body are a frequent clinical entity, which are often triggered by an accident. The tendency of NDSDs to extend to adjunct ipsilateral body parts and to become chronic points to maladaptive adjustment of pain-processing areas in the central nervous system. Psychological stress prior to or around the triggering event seems an important risk factor for NDSDs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: Mortality and morbidity are particularly high in the building industry. The annual rate of non-fatal occupational accidents in Switzerland is 1,133 per 100,000 inhabitants. METHODS: Retrospective analysis of the electronic database of a university emergency centre. Between 2001 and 2011, 782 occupational accidents to construction workers were recorded and analysed using specific demographic and medical keywords. RESULTS: Most patients were aged 30-39 (30.4%). 66.4% of the injured workers were foreigners. This is almost twice as high as the overall proportion of foreigners in Switzerland or in the Swiss labour market. 16% of the Swiss construction workers and 8% of the foreign construction workers suffered a severe injury with ISS >15. There was a trend for workers aged 60 and above to suffer an accident with a high ISS (p = 0.089). CONCLUSIONS: As in other European countries, most patients were in their thirties. Older construction workers suffered fewer injuries, although these tended to be more severe. The injuries were evenly distributed through the working days of the week. A special effort should be made that current health and safety measures are understood and applied by foreign and older construction workers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background Backyard trampolines are immensely popular among children, but are associated with an increase of trampoline-related injuries. The aim of this study was to evaluate radiographs of children with trampoline related injuries and to determine the risk factors. Methods Between 2003 and 2009, 286 children under the age of 16 with backyard trampoline injuries were included in the study. The number of injuries increased from 13 patients in 2003 to 86 in 2009. The median age of the 286 patients was 7 years (range: 1–15 years). Totally 140 (49%) patients were males, and 146 (51%) females. Medical records and all available diagnostic imaging were reviewed. A questionnaire was sent to the parents to evaluate the circumstances of each injury, the type of trampoline, the protection equipment and the experience of the children using the trampoline. The study was approved by the Institutional Ethics Committee of the University Hospital of Bern. Results The questionnaires and radiographs of the 104 patients were available for evaluation. A fracture was sustained in 51 of the 104 patients. More than 75% of all patients sustaining injuries and in 90% of patients with fractures were jumping on the trampoline with other children at the time of the accident. The most common fractures were supracondylar humeral fractures (29%) and forearm fractures (25%). Fractures of the proximal tibia occurred especially in younger children between 2–5 years of age. Conclusions Children younger than 5 years old are at risk for specific proximal tibia fractures (“Trampoline Fracture”). A child jumping simultaneously with other children has a higher risk of suffering from a fracture.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Chernobyl tragedy was the biggest accident since the beginning of the nuclear power industry. The aim of this study was to determine the role of immunological mechanisms in the development of autoimmune disorders (thyroiditis and cataract) and cancers among those workers who participated in clean-up operations in 1986. Blood samples from 165 clean-up workers aged 30-65 from Minsk and Kiev who underwent prophylactic medical examinations and from 80 healthy donors were investigated for the presence of autoimmune reactions and the appearance of onco-foetal antigens. The sera of clean-up workers were found to include the thyroid gland antigen, auto-antibodies to thyroid gland and eye antigens, and immune complexes which are normally absent or found in much lower quantities. The appearance of the clinically unmanifested thyroid gland antigen made it possible to generate a concept describing the mechanism for induction and long-term maintenance of auto-antibody production in an organism after irradiation. Lymphocytes from clean-up workers showed normally absent onco-foetal antigens (PSG and CEA). The data obtained indicate that clean-up workers represent a high risk group for autoimmune and cancer diseases. Immunological findings reveal the long-lasting effects of low doses of irradiation and may be used in prognosis and monitoring of human health.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Standard procedures for forecasting flood risk (Bulletin 17B) assume annual maximum flood (AMF) series are stationary, meaning the distribution of flood flows is not significantly affected by climatic trends/cycles, or anthropogenic activities within the watershed. Historical flood events are therefore considered representative of future flood occurrences, and the risk associated with a given flood magnitude is modeled as constant over time. However, in light of increasing evidence to the contrary, this assumption should be reconsidered, especially as the existence of nonstationarity in AMF series can have significant impacts on planning and management of water resources and relevant infrastructure. Research presented in this thesis quantifies the degree of nonstationarity evident in AMF series for unimpaired watersheds throughout the contiguous U.S., identifies meteorological, climatic, and anthropogenic causes of this nonstationarity, and proposes an extension of the Bulletin 17B methodology which yields forecasts of flood risk that reflect climatic influences on flood magnitude. To appropriately forecast flood risk, it is necessary to consider the driving causes of nonstationarity in AMF series. Herein, large-scale climate patterns—including El Niño-Southern Oscillation (ENSO), Pacific Decadal Oscillation (PDO), North Atlantic Oscillation (NAO), and Atlantic Multidecadal Oscillation (AMO)—are identified as influencing factors on flood magnitude at numerous stations across the U.S. Strong relationships between flood magnitude and associated precipitation series were also observed for the majority of sites analyzed in the Upper Midwest and Northeastern regions of the U.S. Although relationships between flood magnitude and associated temperature series are not apparent, results do indicate that temperature is highly correlated with the timing of flood peaks. Despite consideration of watersheds classified as unimpaired, analyses also suggest that identified change-points in AMF series are due to dam construction, and other types of regulation and diversion. Although not explored herein, trends in AMF series are also likely to be partially explained by changes in land use and land cover over time. Results obtained herein suggest that improved forecasts of flood risk may be obtained using a simple modification of the Bulletin 17B framework, wherein the mean and standard deviation of the log-transformed flows are modeled as functions of climate indices associated with oceanic-atmospheric patterns (e.g. AMO, ENSO, NAO, and PDO) with lead times between 3 and 9 months. Herein, one-year ahead forecasts of the mean and standard deviation, and subsequently flood risk, are obtained by applying site specific multivariate regression models, which reflect the phase and intensity of a given climate pattern, as well as possible impacts of coupling of the climate cycles. These forecasts of flood risk are compared with forecasts derived using the existing Bulletin 17B model; large differences in the one-year ahead forecasts are observed in some locations. The increased knowledge of the inherent structure of AMF series and an improved understanding of physical and/or climatic causes of nonstationarity gained from this research should serve as insight for the formulation of a physical-casual based statistical model, incorporating both climatic variations and human impacts, for flood risk over longer planning horizons (e.g., 10-, 50, 100-years) necessary for water resources design, planning, and management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Metals price risk management is a key issue related to financial risk in metal markets because of uncertainty of commodity price fluctuation, exchange rate, interest rate changes and huge price risk either to metals’ producers or consumers. Thus, it has been taken into account by all participants in metal markets including metals’ producers, consumers, merchants, banks, investment funds, speculators, traders and so on. Managing price risk provides stable income for both metals’ producers and consumers, so it increases the chance that a firm will invest in attractive projects. The purpose of this research is to evaluate risk management strategies in the copper market. The main tools and strategies of price risk management are hedging and other derivatives such as futures contracts, swaps and options contracts. Hedging is a transaction designed to reduce or eliminate price risk. Derivatives are financial instruments, whose returns are derived from other financial instruments and they are commonly used for managing financial risks. Although derivatives have been around in some form for centuries, their growth has accelerated rapidly during the last 20 years. Nowadays, they are widely used by financial institutions, corporations, professional investors, and individuals. This project is focused on the over-the-counter (OTC) market and its products such as exotic options, particularly Asian options. The first part of the project is a description of basic derivatives and risk management strategies. In addition, this part discusses basic concepts of spot and futures (forward) markets, benefits and costs of risk management and risks and rewards of positions in the derivative markets. The second part considers valuations of commodity derivatives. In this part, the options pricing model DerivaGem is applied to Asian call and put options on London Metal Exchange (LME) copper because it is important to understand how Asian options are valued and to compare theoretical values of the options with their market observed values. Predicting future trends of copper prices is important and would be essential to manage market price risk successfully. Therefore, the third part is a discussion about econometric commodity models. Based on this literature review, the fourth part of the project reports the construction and testing of an econometric model designed to forecast the monthly average price of copper on the LME. More specifically, this part aims at showing how LME copper prices can be explained by means of a simultaneous equation structural model (two-stage least squares regression) connecting supply and demand variables. A simultaneous econometric model for the copper industry is built: {█(Q_t^D=e^((-5.0485))∙P_((t-1))^((-0.1868) )∙〖GDP〗_t^((1.7151) )∙e^((0.0158)∙〖IP〗_t ) @Q_t^S=e^((-3.0785))∙P_((t-1))^((0.5960))∙T_t^((0.1408))∙P_(OIL(t))^((-0.1559))∙〖USDI〗_t^((1.2432))∙〖LIBOR〗_((t-6))^((-0.0561))@Q_t^D=Q_t^S )┤ P_((t-1))^CU=e^((-2.5165))∙〖GDP〗_t^((2.1910))∙e^((0.0202)∙〖IP〗_t )∙T_t^((-0.1799))∙P_(OIL(t))^((0.1991))∙〖USDI〗_t^((-1.5881))∙〖LIBOR〗_((t-6))^((0.0717) Where, Q_t^D and Q_t^Sare world demand for and supply of copper at time t respectively. P(t-1) is the lagged price of copper, which is the focus of the analysis in this part. GDPt is world gross domestic product at time t, which represents aggregate economic activity. In addition, industrial production should be considered here, so the global industrial production growth that is noted as IPt is included in the model. Tt is the time variable, which is a useful proxy for technological change. A proxy variable for the cost of energy in producing copper is the price of oil at time t, which is noted as POIL(t ) . USDIt is the U.S. dollar index variable at time t, which is an important variable for explaining the copper supply and copper prices. At last, LIBOR(t-6) is the 6-month lagged 1-year London Inter bank offering rate of interest. Although, the model can be applicable for different base metals' industries, the omitted exogenous variables such as the price of substitute or a combined variable related to the price of substitutes have not been considered in this study. Based on this econometric model and using a Monte-Carlo simulation analysis, the probabilities that the monthly average copper prices in 2006 and 2007 will be greater than specific strike price of an option are defined. The final part evaluates risk management strategies including options strategies, metal swaps and simple options in relation to the simulation results. The basic options strategies such as bull spreads, bear spreads and butterfly spreads, which are created by using both call and put options in 2006 and 2007 are evaluated. Consequently, each risk management strategy in 2006 and 2007 is analyzed based on the day of data and the price prediction model. As a result, applications stemming from this project include valuing Asian options, developing a copper price prediction model, forecasting and planning, and decision making for price risk management in the copper market.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The application of Markov processes is very useful to health-care problems. The objective of this study is to provide a structured methodology of forecasting cost based upon combining a stochastic model of utilization (Markov Chain) and deterministic cost function. The perspective of the cost in this study is the reimbursement for the services rendered. The data to be used is the OneCare database of claim records of their enrollees over a two-year period of January 1, 1996–December 31, 1997. The model combines a Markov Chain that describes the utilization pattern and its variability where the use of resources by risk groups (age, gender, and diagnosis) will be considered in the process and a cost function determined from a fixed schedule based on real costs or charges for those in the OneCare claims database. The cost function is a secondary application to the model. Goodness-of-fit will be used checked for the model against the traditional method of cost forecasting. ^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A commentary on Santos' article, "Explaining Scholarship Addressing Hispanic Children’s Issues."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The principal risks in the railway industry are mainly associated with collisions, derailments and level crossing accidents. An understanding of the nature of previous accidents on the railway network is required to identify potential causes and develop safety systems and deploy safety procedures. Risk assessment is a process for determining the risk magnitude to assist with decision-making. We propose a three-step methodology to predict the mean number of fatalities in railway accidents. The first is to predict the mean number of accidents by analyzing generalized linear models and selecting the one that best fits to the available historical data on the basis of goodness-offit statistics. The second is to compute the mean number of fatalities per accident and the third is to estimate the mean number of fatalities. The methodology is illustrated on the Spanish railway system. Statistical models accounting for annual and grouped data for the 1992-2009 time period have been analyzed. After identifying the models for broad and narrow gauges, we predicted mean number of accidents and the number of fatalities for the 2010-18 time period.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Como en todos los medios de transporte, la seguridad en los viajes en avión es de primordial importancia. Con los aumentos de tráfico aéreo previstos en Europa para la próxima década, es evidente que el riesgo de accidentes necesita ser evaluado y monitorizado cuidadosamente de forma continúa. La Tesis presente tiene como objetivo el desarrollo de un modelo de riesgo de colisión exhaustivo como método para evaluar el nivel de seguridad en ruta del espacio aéreo europeo, considerando todos los factores de influencia. La mayor limitación en el desarrollo de metodologías y herramientas de monitorización adecuadas para evaluar el nivel de seguridad en espacios de ruta europeos, donde los controladores aéreos monitorizan el tráfico aéreo mediante la vigilancia radar y proporcionan instrucciones tácticas a las aeronaves, reside en la estimación del riesgo operacional. Hoy en día, la estimación del riesgo operacional está basada normalmente en reportes de incidentes proporcionados por el proveedor de servicios de navegación aérea (ANSP). Esta Tesis propone un nuevo e innovador enfoque para evaluar el nivel de seguridad basado exclusivamente en el procesamiento y análisis trazas radar. La metodología propuesta ha sido diseñada para complementar la información recogida en las bases de datos de accidentes e incidentes, mediante la provisión de información robusta de los factores de tráfico aéreo y métricas de seguridad inferidas del análisis automático en profundidad de todos los eventos de proximidad. La metodología 3-D CRM se ha implementado en un prototipo desarrollado en MATLAB © para analizar automáticamente las trazas radar y planes de vuelo registrados por los Sistemas de Procesamiento de Datos Radar (RDP) e identificar y analizar todos los eventos de proximidad (conflictos, conflictos potenciales y colisiones potenciales) en un periodo de tiempo y volumen del espacio aéreo. Actualmente, el prototipo 3-D CRM está siendo adaptado e integrado en la herramienta de monitorización de prestaciones de Aena (PERSEO) para complementar las bases de accidentes e incidentes ATM y mejorar la monitorización y proporcionar evidencias de los niveles de seguridad. ABSTRACT As with all forms of transport, the safety of air travel is of paramount importance. With the projected increases in European air traffic in the next decade and beyond, it is clear that the risk of accidents needs to be assessed and carefully monitored on a continuing basis. The present thesis is aimed at the development of a comprehensive collision risk model as a method of assessing the European en-route risk, due to all causes and across all dimensions within the airspace. The major constraint in developing appropriate monitoring methodologies and tools to assess the level of safety in en-route airspaces where controllers monitor air traffic by means of radar surveillance and provide aircraft with tactical instructions lies in the estimation of the operational risk. The operational risk estimate normally relies on incident reports provided by the air navigation service providers (ANSPs). This thesis proposes a new and innovative approach to assessing aircraft safety level based exclusively upon the process and analysis of radar tracks. The proposed methodology has been designed to complement the information collected in the accident and incident databases, thereby providing robust information on air traffic factors and safety metrics inferred from the in depth assessment of proximate events. The 3-D CRM methodology is implemented in a prototype tool in MATLAB © in order to automatically analyze recorded aircraft tracks and flight plan data from the Radar Data Processing systems (RDP) and identify and analyze all proximate events (conflicts, potential conflicts and potential collisions) within a time span and a given volume of airspace. Currently, the 3D-CRM prototype is been adapted and integrated in AENA’S Performance Monitoring Tool (PERSEO) to complement the information provided by the ATM accident and incident databases and to enhance monitoring and providing evidence of levels of safety.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the current uncertain context that affects both the world economy and the energy sector, with the rapid increase in the prices of oil and gas and the very unstable political situation that affects some of the largest raw materials’ producers, there is a need for developing efficient and powerful quantitative tools that allow to model and forecast fossil fuel prices, CO2 emission allowances prices as well as electricity prices. This will improve decision making for all the agents involved in energy issues. Although there are papers focused on modelling fossil fuel prices, CO2 prices and electricity prices, the literature is scarce on attempts to consider all of them together. This paper focuses on both building a multivariate model for the aforementioned prices and comparing its results with those of univariate ones, in terms of prediction accuracy (univariate and multivariate models are compared for a large span of days, all in the first 4 months in 2011) as well as extracting common features in the volatilities of the prices of all these relevant magnitudes. The common features in volatility are extracted by means of a conditionally heteroskedastic dynamic factor model which allows to solve the curse of dimensionality problem that commonly arises when estimating multivariate GARCH models. Additionally, the common volatility factors obtained are useful for improving the forecasting intervals and have a nice economical interpretation. Besides, the results obtained and methodology proposed can be useful as a starting point for risk management or portfolio optimization under uncertainty in the current context of energy markets.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective: To analyse the time evolution of the rates of mortality due to motor vehicle traffic accidents (MVTA) injuries that occurred among the general population of Comunitat Valenciana between 1987 and 2011, as well as to identify trend changes by sex and age group. Methods: An observational study of annual mortality trends between 1987 and 2011. We studied all deaths due to MVTA injuries that occurred during this period of time among the non-institutionalised population residing in Comunitat Valenciana (a Spanish Mediterranean region that had a population of 5,117,190 inhabitants in 2011). The rates of mortality due to MVTA injuries were calculated for each sex and year studied. These rates were standardised by age for the total population and for specific age groups using the direct method (age-standardised rate – ASR). Joinpoint regression models were used in order to detect significant trend changes. Additionally, the annual percentage change (APC) of the ASRs was calculated for each trend segment, which is reflected in statistically significant joinpoints. Results: For all ages, ASRs decrease greatly in both men and women (70% decrease between 1990 and 2011). In 1990 and 2011, men have rates of 36.5 and 5.2 per 100,000 men/year, respectively. In the same years, women have rates of 8.0 and 0.9 per 100,000 women/year, respectively. This decrease reaches up to 90% in the age group 15–34 years in both men and women. ASR ratios for men and women increased over time for all ages: this ratio was 3.9 in 1987; 4.6 in 1990; and 5.8 in 2011. For both men and women, there is a first significant segment (p < 0.05) with an increasing trend between 1987 and 1989–1990. After 1990, there are 3 segments with a significant decreasing APC (1990–1993, 1993–2005 and 2005–2011, in the case of men; and 1989–1996, 1999–2007 and 2007–2011, in the case of women). Conclusion: The risk of death due to motor vehicle traffic accidents injuries has decreased significantly, especially in the case of women, for the last 25 years in Comunitat Valenciana, mainly as of 2006. This may be a consequence of the road-safety measures that have been implemented in Spain and in Comunitat Valenciana since 2004. The economic crisis that this country has undergone since 2008 may have also been a contributing factor to this decrease. Despite the decrease, ASR ratios for men and women increased over time and it is still a high-risk cause of death among young men. It is thus important that the measures that helped decrease the risk of death are maintained and improved over time.