998 resultados para short neck
Resumo:
In music genre classification, most approaches rely on statistical characteristics of low-level features computed on short audio frames. In these methods, it is implicitly considered that frames carry equally relevant information loads and that either individual frames, or distributions thereof, somehow capture the specificities of each genre. In this paper we study the representation space defined by short-term audio features with respect to class boundaries, and compare different processing techniques to partition this space. These partitions are evaluated in terms of accuracy on two genre classification tasks, with several types of classifiers. Experiments show that a randomized and unsupervised partition of the space, used in conjunction with a Markov Model classifier lead to accuracies comparable to the state of the art. We also show that unsupervised partitions of the space tend to create less hubs.
Resumo:
The introduction of new distributed energy resources, based on natural intermittent power sources, in power systems imposes the development of new adequate operation management and control methods. This paper proposes a short-term Energy Resource Management (ERM) methodology performed in two phases. The first one addresses the hour-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. Both phases consider the day-ahead resource scheduling solution. The ERM scheduling is formulated as an optimization problem that aims to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixed-integer non-linear programming approach and by a heuristic approach based on genetic algorithms. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units has been implemented in a PSCADbased simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.
Resumo:
The current regulatory framework for maintenance outage scheduling in distribution systems needs revision to face the challenges of future smart grids. In the smart grid context, generation units and the system operator perform new roles with different objectives, and an efficient coordination between them becomes necessary. In this paper, the distribution system operator (DSO) of a microgrid receives the proposals for shortterm (ST) planned outages from the generation and transmission side, and has to decide the final outage plans, which is mandatory for the members to follow. The framework is based on a coordination procedure between the DSO and other market players. This paper undertakes the challenge of optimization problem in a smart grid where the operator faces with uncertainty. The results show the effectiveness and applicability of the proposed regulatory framework in the modified IEEE 34- bus test system.
Resumo:
This paper proposes an energy resources management methodology based on three distinct time horizons: day-ahead scheduling, hour-ahead scheduling, and real-time scheduling. In each scheduling process it is necessary the update of generation and consumption operation and of the storage and electric vehicles storage status. Besides the new operation condition, it is important more accurate forecast values of wind generation and of consumption using results of in short-term and very short-term methods. A case study considering a distribution network with intensive use of distributed generation and electric vehicles is presented.
Resumo:
This paper proposes artificial neural networks in combination with wavelet transform for short-term wind power forecasting in Portugal. The increased integration of wind power into the electric grid, as nowadays occurs in Portugal, poses new challenges due to its intermittency and volatility. Hence, good forecasting tools play a key role in tackling these challenges. Results from a real-world case study are presented. A comparison is carried out, taking into account the results obtained with other approaches. Finally, conclusions are duly drawn. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
Distributed Energy Resources (DER) scheduling in smart grids presents a new challenge to system operators. The increase of new resources, such as storage systems and demand response programs, results in additional computational efforts for optimization problems. On the other hand, since natural resources, such as wind and sun, can only be precisely forecasted with small anticipation, short-term scheduling is especially relevant requiring a very good performance on large dimension problems. Traditional techniques such as Mixed-Integer Non-Linear Programming (MINLP) do not cope well with large scale problems. This type of problems can be appropriately addressed by metaheuristics approaches. This paper proposes a new methodology called Signaled Particle Swarm Optimization (SiPSO) to address the energy resources management problem in the scope of smart grids, with intensive use of DER. The proposed methodology’s performance is illustrated by a case study with 99 distributed generators, 208 loads, and 27 storage units. The results are compared with those obtained in other methodologies, namely MINLP, Genetic Algorithm, original Particle Swarm Optimization (PSO), Evolutionary PSO, and New PSO. SiPSO performance is superior to the other tested PSO variants, demonstrating its adequacy to solve large dimension problems which require a decision in a short period of time.
Resumo:
Distribution systems are the first volunteers experiencing the benefits of smart grids. The smart grid concept impacts the internal legislation and standards in grid-connected and isolated distribution systems. Demand side management, the main feature of smart grids, acquires clear meaning in low voltage distribution systems. In these networks, various coordination procedures are required between domestic, commercial and industrial consumers, producers and the system operator. Obviously, the technical basis for bidirectional communication is the prerequisite of developing such a coordination procedure. The main coordination is required when the operator tries to dispatch the producers according to their own preferences without neglecting its inherent responsibility. Maintenance decisions are first determined by generating companies, and then the operator has to check and probably modify them for final approval. In this paper the generation scheduling from the viewpoint of a distribution system operator (DSO) is formulated. The traditional task of the DSO is securing network reliability and quality. The effectiveness of the proposed method is assessed by applying it to a 6-bus and 9-bus distribution system.
Resumo:
The large increase of distributed energy resources, including distributed generation, storage systems and demand response, especially in distribution networks, makes the management of the available resources a more complex and crucial process. With wind based generation gaining relevance, in terms of the generation mix, the fact that wind forecasting accuracy rapidly drops with the increase of the forecast anticipation time requires to undertake short-term and very short-term re-scheduling so the final implemented solution enables the lowest possible operation costs. This paper proposes a methodology for energy resource scheduling in smart grids, considering day ahead, hour ahead and five minutes ahead scheduling. The short-term scheduling, undertaken five minutes ahead, takes advantage of the high accuracy of the very-short term wind forecasting providing the user with more efficient scheduling solutions. The proposed method uses a Genetic Algorithm based approach for optimization that is able to cope with the hard execution time constraint of short-term scheduling. Realistic power system simulation, based on PSCAD , is used to validate the obtained solutions. The paper includes a case study with a 33 bus distribution network with high penetration of distributed energy resources implemented in PSCAD .
Resumo:
Short-term risk management is highly dependent on long-term contractual decisions previously established; risk aversion factor of the agent and short-term price forecast accuracy. Trying to give answers to that problem, this paper provides a different approach for short-term risk management on electricity markets. Based on long-term contractual decisions and making use of a price range forecast method developed by the authors, the short-term risk management tool presented here has as main concern to find the optimal spot market strategies that a producer should have for a specific day in function of his risk aversion factor, with the objective to maximize the profits and simultaneously to practice the hedge against price market volatility. Due to the complexity of the optimization problem, the authors make use of Particle Swarm Optimization (PSO) to find the optimal solution. Results from realistic data, namely from OMEL electricity market, are presented and discussed in detail.
Resumo:
The large increase of Distributed Generation (DG) in Power Systems (PS) and specially in distribution networks makes the management of distribution generation resources an increasingly important issue. Beyond DG, other resources such as storage systems and demand response must be managed in order to obtain more efficient and “green” operation of PS. More players, such as aggregators or Virtual Power Players (VPP), that operate these kinds of resources will be appearing. This paper proposes a new methodology to solve the distribution network short term scheduling problem in the Smart Grid context. This methodology is based on a Genetic Algorithms (GA) approach for energy resource scheduling optimization and on PSCAD software to obtain realistic results for power system simulation. The paper includes a case study with 99 distributed generators, 208 loads and 27 storage units. The GA results for the determination of the economic dispatch considering the generation forecast, storage management and load curtailment in each period (one hour) are compared with the ones obtained with a Mixed Integer Non-Linear Programming (MINLP) approach.
Resumo:
OBJETIVO: Traduzir e validar para a língua portuguesa o questionário de qualidade de vida condição-específico denominado International Consultation on Incontinence Questionnaire - Short Form (ICIQ-SF) em pacientes com incontinência urinária. MÉTODOS: Duas traduções independentes do ICIQ-SF foram feitas por brasileiros, fluentes na língua inglesa. Após harmonização das mesmas, a tradução resultante foi retrotraduzida independentemente por dois nativos de países de língua inglesa. As diferenças foram harmonizadas e pré-testadas em um estudo piloto. A versão final do ICIQ-SF para o português, bem como a versão em português do King's Health Questionnaire (KHQ) foram aplicadas simultaneamente em 123 pacientes consecutivos com queixa de incontinência urinária (29 homens e 94 mulheres) que procuraram o laboratório de uroginecologia e o serviço de urodinâmica de um hospital universitário, localizado em Campinas. Foram testadas as propriedades psicométricas do questionário, como confiabilidade e validade de constructo. RESULTADOS: A idade mediana foi de 53 anos (intervalo de 16 a 86 anos). O período médio de reteste para o ICIQ-SF foi de 14,37 dias (intervalo de seis a 41 dias). Nenhuma alteração do formato original do ICIQ-SF foi observada no final do processo de tradução e adaptação cultural. A consistência interna foi alta, como demonstrado pelo coeficiente alfa de Cronbach (0,88). O resultado do teste-reteste foi considerado de moderado a forte, como indicado pelo índice Kappa ponderado, cujos valores variaram de 0,72 a 0,75, e o coeficiente de correlação de Pearson que foi de 0,89. A correlação entre o ICIQ-SF e o KHQ foi considerada de moderada a boa para a maioria dos itens, variando de 0,44 a 0,77. A avaliação das validades de constructo e concorrente foi também satisfatória e estatisticamente significante. CONCLUSÕES: A versão para o português do ICIQ-SF foi traduzida e validada com sucesso para aplicação em pacientes brasileiros de ambos os sexos, com queixa de incontinência urinária, apresentando satisfatória confiabilidade e validade de constructo.
Resumo:
Novel (E)-3-aryl-4-benzylidene-8-hydroxy-3,4-dihydro-1 H-xanthene-1,9(2H)-diones are prepared by the cyclization of (E,E)-3-cinnamoyl-5-hydroxy-2-styrylchromones efficiently catalyzed with boron tribromide. The (E,E)-3-cinnamoyl-5-hydroxy-2-styrylchromones are obtained from the Baker–Venkataraman rearrangement of (E,E)-2-acetyl-1,3-phenylene bis(3-phenylacrylate), which is greatly improved under microwave irradiation.
Resumo:
Six time-depth recorders attached with suction-cups were deployed in resident and transient adult short-finned pilot whales to evaluate their daytime diving characteristics in their preferred habitat area off Madeira Island. Here, data on the proportion of time spent at the surface and at different dive phases (descent, bottom and ascent), dive depths and dive rates are presented. With mean attachment durations of 2 h 31 min (SD=2 h), the whales spent a considerable amount of time at the surface (mean=76.3%, SD=18.6) and presented a low diving rate (mean=6.8 dives h‾¹, SD=6.1; considering dive as submergence deeper than 10 m). The maximum dive depth recorded in this study was 988 m, and dives deeper than 500 m, which were recorded from resident and transient whales, suggest foraging activity along their preferred habitat area. The analysis of dives deeper than 100 m shows that the percentage of time spent on descent, bottom or ascent varied between dives, with means of ~40, 30 and 30%, respectively.
Resumo:
Objectives - Identify radiographers’ postures during frequent mammography procedures related to the mammography equipment and patient characteristics. Methods - A postural task analysis was performed using images acquired during the simulation of mammography positioning procedures. Simulations included craniocaudal/(CC) and mediolateral-oblique/(MLO) positioning in three different settings: radiographers and patients with similar statures, radiographers smaller than the patients and radiographers taller than the patients. Measurements of postural angles were performed by two raters using adequate software and classified according to the European Standard EN1005-4:2005 + A1:2008. Results - The simulations revealed that the most awkward posture in mammography is during the positioning of MLO projection in short-stature patients. Postures identified as causing work-related musculoskeletal disorder (WRMSD) risk were neck extension, arms elevated and the back stooped, presenting angles of 87.2, 118.6 and 63.6, respectively. If radiographers were taller than patients, then the trunk and arm postures were not acceptable. Conclusions - Working in a mammography room leads to awkward postures that can have an impact on radiographers’ health, namely WRMSDs. The results in this study showed that there are non-acceptable postures associated with frequent working procedures in mammography. MLO is the most demanding procedure for radiographer postures and may be related to WRMSDs. Mammography devices should be redesigned considering adjustability for radiographers. Main Messages: • Mammography constraints for radiographers in mammography procedures have not been well studied. • Performing mammography leads to awkward postures that can impact radiographers’ health. • MLO, the most demanding procedure for radiographers, is possibly related to WRMSDs.
Resumo:
Intensity Modulated Radiotherapy (IMRT) is a technique introduced to shape more precisely the dose distributions to the tumour, providing a higher dose escalation in the volume to irradiate and simultaneously decreasing the dose in the organs at risk which consequently reduces the treatment toxicity. This technique is widely used in prostate and head and neck (H&N) tumours. Given the complexity and the use of high doses in this technique it’s necessary to ensure as a safe and secure administration of the treatment, through the use of quality control programmes for IMRT. The purpose of this study was to evaluate statistically the quality control measurements that are made for the IMRT plans in prostate and H&N patients, before the beginning of the treatment, analysing their variations, the percentage of rejected and repeated measurements, the average, standard deviations and the proportion relations.