926 resultados para railway crew scheduling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introduction The incidence of American cutaneous leishmaniasis (ACL) is increasing in Latin America, especially in Brazil, where 256,587 cases were confirmed in the last decade. Methods This study used a Bayesian model to examine the spatial and temporal distribution of ACL cases between 2000 and 2009 in 61 counties of State of Maranhão located along the three main road and railway corridors. Results During the study period, 13,818 cases of ACL were recorded. There was a significant decrease in the incidence of ACL in the ten study years. The recorded incidence rate ranged from 7.36 to 241.45 per 100,000 inhabitants. The relative risk increased in 77% of the counties, decreased in 18% and was maintained in only five counties. Conclusions Although there was a decreased incidence of the disease, ACL was present in all of the examined municipalities, thus maintaining the risk of contracting this illness.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This chapter aims at developing a taxonomic framework to classify the studies on the flexible job shop scheduling problem (FJSP). The FJSP is a generalization of the classical job shop scheduling problem (JSP), which is one of the oldest NP-hard problems. Although various solution methodologies have been developed to obtain good solutions in reasonable time for FSJPs with different objective functions and constraints, no study which systematically reviews the FJSP literature has been encountered. In the proposed taxonomy, the type of study, type of problem, objective, methodology, data characteristics, and benchmarking are the main categories. In order to verify the proposed taxonomy, a variety of papers from the literature are classified. Using this classification, several inferences are drawn and gaps in the FJSP literature are specified. With the proposed taxonomy, the aim is to develop a framework for a broad view of the FJSP literature and construct a basis for future studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Scheduling, job shop, uncertainty, mixed (disjunctive) graph, stability analysis

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report for the scientific sojourn at the University of California at Berkeley between September 2007 to February 2008. The globalization combined with the success of containerization has brought about tremendous increases in the transportation of containers across the world. This leads to an increasing size of container ships which causes higher demands on seaport container terminals and their equipment. In this situation, the success of container terminals resides in a fast transhipment process with reduced costs. For these reasons it is necessary to optimize the terminal’s processes. There are three main logistic processes in a seaport container terminal: loading and unloading of containerships, storage, and reception/deliver of containers from/to the hinterland. Moreover there is an additional process that ensures the interconnection between previous logistic activities: the internal transport subsystem. The aim of this paper is to optimize the internal transport cycle in a marine container terminal managed by straddle carriers, one of the most used container transfer technologies. Three sub-systems are analyzed in detail: the landside transportation, the storage of containers in the yard, and the quayside transportation. The conflicts and decisions that arise from these three subsystems are analytically investigated, and optimization algorithms are proposed. Moreover, simulation has been applied to TCB (Barcelona Container Terminal) to test these algorithms and compare different straddle carrier’s operation strategies, such as single cycle versus double cycle, and different sizes of the handling equipment fleet. The simulation model is explained in detail and the main decision-making algorithms from the model are presented and formulated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For the execution of the scientific applications, different methods have been proposed to dynamically provide execution environments for such applications that hide the complexity of underlying distributed and heterogeneous infrastructures. Recently virtualization has emerged as a promising technology to provide such environments. Virtualization is a technology that abstracts away the details of physical hardware and provides virtualized resources for high-level scientific applications. Virtualization offers a cost-effective and flexible way to use and manage computing resources. Such an abstraction is appealing in Grid computing and Cloud computing for better matching jobs (applications) to computational resources. This work applies the virtualization concept to the Condor dynamic resource management system by using Condor Virtual Universe to harvest the existing virtual computing resources to their maximum utility. It allows existing computing resources to be dynamically provisioned at run-time by users based on application requirements instead of statically at design-time thereby lay the basis for efficient use of the available resources, thus providing way for the efficient use of the available resources.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Algoritmo que optimiza y crea pairings para tripulaciones de líneas aéreas mediante la posterior programación en Java.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Railway finance report for the Iowa Department of Transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual report for Iowa Railway Finance Authority. Annual Report produced by Iowa Department of Transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Business processes designers take into account the resources that the processes would need, but, due to the variable cost of certain parameters (like energy) or other circumstances, this scheduling must be done when business process enactment. In this report we formalize the energy aware resource cost, including time and usage dependent rates. We also present a constraint programming approach and an auction-based approach to solve the mentioned problem including a comparison of them and a comparison of the proposed algorithms for solving them

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual report for Iowa Railway Finance Authority. Annual Report produced by Iowa Department of Transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Railway finance report for the Iowa Department of Transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual report for Iowa Railway Finance Authority. Annual Report produced by Iowa Department of Transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We present a polyhedral framework for establishing general structural properties on optimal solutions of stochastic scheduling problems, where multiple job classes vie for service resources: the existence of an optimal priority policy in a given family, characterized by a greedoid (whose feasible class subsets may receive higher priority), where optimal priorities are determined by class-ranking indices, under restricted linear performance objectives (partial indexability). This framework extends that of Bertsimas and Niño-Mora (1996), which explained the optimality of priority-index policies under all linear objectives (general indexability). We show that, if performance measures satisfy partial conservation laws (with respect to the greedoid), which extend previous generalized conservation laws, then the problem admits a strong LP relaxation over a so-called extended greedoid polytope, which has strong structural and algorithmic properties. We present an adaptive-greedy algorithm (which extends Klimov's) taking as input the linear objective coefficients, which (1) determines whether the optimal LP solution is achievable by a policy in the given family; and (2) if so, computes a set of class-ranking indices that characterize optimal priority policies in the family. In the special case of project scheduling, we show that, under additional conditions, the optimal indices can be computed separately for each project (index decomposition). We further apply the framework to the important restless bandit model (two-action Markov decision chains), obtaining new index policies, that extend Whittle's (1988), and simple sufficient conditions for their validity. These results highlight the power of polyhedral methods (the so-called achievable region approach) in dynamic and stochastic optimization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The standard one-machine scheduling problem consists in schedulinga set of jobs in one machine which can handle only one job at atime, minimizing the maximum lateness. Each job is available forprocessing at its release date, requires a known processing timeand after finishing the processing, it is delivery after a certaintime. There also can exists precedence constraints between pairsof jobs, requiring that the first jobs must be completed beforethe second job can start. An extension of this problem consistsin assigning a time interval between the processing of the jobsassociated with the precedence constrains, known by finish-starttime-lags. In presence of this constraints, the problem is NP-hardeven if preemption is allowed. In this work, we consider a specialcase of the one-machine preemption scheduling problem with time-lags, where the time-lags have a chain form, and propose apolynomial algorithm to solve it. The algorithm consist in apolynomial number of calls of the preemption version of the LongestTail Heuristic. One of the applicability of the method is to obtainlower bounds for NP-hard one-machine and job-shop schedulingproblems. We present some computational results of thisapplication, followed by some conclusions.