990 resultados para building usage
Resumo:
The overall goal of the project was to provide a tool for improved investment decision making for functional performance of investment property. The evaluation examines both ex post and ex ante building performance within operational and investment contexts and considers the resultant financial, environmental and social impacts.
Resumo:
The ability to assess a commercial building for its impact on the environment at the earliest stage of design is a goal which is achievable by integrating several approaches into a single procedure directly from the 3D CAD representation. Such an approach enables building design professionals to make informed decisions on the environmental impact of building and its alternatives during the design development stage instead of at the post-design stage where options become limited. The indicators of interest are those which relate to consumption of resources and energy, contributions to pollution of air, water and soil, and impacts on the health and wellbeing of people in the built environment as a result of constructing and operating buildings. 3D object-oriented CAD files contain a wealth of building information which can be interrogated for details required for analysis of the performance of a design. The quantities of all components in the building can be automatically obtained from the 3D CAD objects and their constituent materials identified to calculate a complete list of the amounts of all building products such as concrete, steel, timber, plastic etc. When this information is combined with a life cycle inventory database, key internationally recognised environmental indicators can be estimated. Such a fully integrated tool known as LCADesign has been created for automated ecoefficiency assessment of commercial buildings direct from 3D CAD. This paper outlines the key features of LCADesign and its application to environmental assessment of commercial buildings.
Resumo:
Buildings consume resources and energy, contribute to pollution of our air, water and soil, impact the health and well-being of populations and constitute an important part of the built environment in which we live. The ability to assess their design with a view to reducing that impact automatically from their 3D CAD representations enables building design professionals to make informed decisions on the environmental impact of building structures. Contemporary 3D object-oriented CAD files contain a wealth of building information. LCADesign has been designed as a fully integrated approach for automated eco-efficiency assessment of commercial buildings direct from 3D CAD. LCADesign accesses the 3D CAD detail through Industry Foundation Classes (IFCs) - the international standard file format for defining architectural and constructional CAD graphic data as 3D real-world objects - to permit construction professionals to interrogate these intelligent drawing objects for analysis of the performance of a design. The automated take-off provides quantities of all building components whose specific production processes, logistics and raw material inputs, where necessary, are identified to calculate a complete list of quantities for all products such as concrete, steel, timber, plastic etc and combines this information with the life cycle inventory database, to estimate key internationally recognised environmental indicators such as CML, EPS and Eco-indicator 99. This paper outlines the key modules of LCADesign and their role in delivering an automated eco-efficiency assessment for commercial buildings.
Resumo:
LCADesign software package is a real-time environmental impact calculator for commercial property that works directly from the building designer's model. It enables developers, building designers, architects, engineers, builders, manufacturers and government bodies to optimise the eco-impact of a building as the design model evolves instead of waiting months for expert analysis. By integrating with the Building Information Models (BIMs) generated by 3D computer-aided drafting, LCADesign builds eco-efficiency into the design stage and measures the environmental values and risks of materials in commercial buildings
Resumo:
In moving from lowest cost adversarial based traditional procurement towards value driven methodologies the challenges range from re-engineering the process, to metrics and team alignment. This paper describes research into methodologies which encourage alignment of project partners towards achieving mutually beneficial goals. The research identifies nine variables which influence the achievement of successful projects delivering value. Results from case studies illustrate that not all parties can achieve value for themselves which directs attention to the balance between deliverables and the interests of team members. Re- valuing construction demands refocusing towards the delivery of operational assets and their place in the value system whilst recognising the need to manage the delivery process and the team to align the value to the parties. The objective of the project was to develop tools and recommendations for reform of project delivery in the building and construction industry to transform business-as-usual performance into exceptional performance. Benefits flow not only to the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. This research was funded by the Australian Cooperative Research Centre for Construction Innovation.
Resumo:
In line with developments overseas Australian clients are turning to considerations of value in project procurement. Until the 1980s the industry operated in a largely traditional manner however the extremely adversarial behaviour exhibited during towards the end of the decade led to a number of significant events and initiatives including the publication of “No Dispute”, the Gyles Royal Commission into the Building Industry, the Construction Industry Development Agency (CIDA) and the work of the Australian Procurement and Construction Council (APCC). A number of research projects in progress in the CRC for Construction Innovation (CRC CI) are focussing on the assessment of value and methodologies to support the delivery of value in the procurement and management of engineering and construction projects. This paper charts the emergence of several key drivers in the process and illustrates how they can be integrated into a comprehensive Decision Support System that balances value to stakeholders with project imperatives and incorporates a lessons learned data base which enriches the decision making process to optimise delivery method design and selection.
Resumo:
AIMM stands for 'Agents for Improved Maintenance Management.' The AIMM system is a prototype tool that has developed the state of the art life cycle modelling of buildings through the linking of a 3D model with maintenance data to allow both the facility manager and the designer to gain access to building maintenance information and knowledge that is currently inaccessible. AIMM integrates data mining agents into the maintenance process to produce timely data for the facility manager on the effects of different maintenance regimes.
Resumo:
Our survey findings confirm that 11 factors influence information and communication technology (ICT) diffusion for experienced ICT users. We offer a model that consists of 4 groups of categories: management (M); individual (I); technology (T); and environment (E). Our conclusions reinforce the importance of a coherent ICT diffusion strategy and supportive environment. This requires substantial investment in training and collegial learning support mechanisms. This paper provides an overview of the work undertaken and an analysis of its implications for the construction industry and we provide useful insights that a wide range of construction industry professionals and contractors may find useful.
Resumo:
The construction industry is a key national economic component. It tends to be at the forefront of cyclic changes in the Australian economy. It has a significant impact, both directly and indirectly, on the efficiency and productivity of other industries. Moreover it affects everyone to a greater or lesser extent; through its products whether they are manifested in the physical infrastructure that supports the operation of the economy or through the built environment that directly impacts on the quality of life experienced by individuals. In financial terms the industry makes one of the largest contributions to the Australian economy, accounting for 4.7 per cent of GDP 1 which was worth over $30B in 20012. The construction industry is comprised of a myriad of small firms, across several important sectors including, o Residential building, o Commercial building, o Building services, o Engineering, o Infrastructure o Facilities Management o Property Development Each sector is typified by firms that have distinctive characteristics such as the number of employees, size and value of contracts, number of jobs, and so forth. It tends to be the case that firms operating in commercial building are larger than those involved in residential construction. The largest contractors are found in engineering and infrastructure, as well as in the commercial building sub-sectors. However all sectors are characterised by their reliance upon sub-contractors to carry out on-site operations. Professionals from the various design consultant groups operate across all of these sectors. This description masks one of the most significant underlying causes of inefficiency in the construction industry, namely its fragmentation. The Construction Industry chapter of the 2004 Australian Year Book3, published by the Australian Bureau of Statistics unmasks the industry’s fragmented structure, typified by the large number of operating businesses within it, the vast majority of which are small companies employing less than 5 people. It identifies over 190,000 firms, of which over 90 percent employ less than 5 people. At the other end of the spectrum, firms employing 20 or more people account for fractionally more than one percent of businesses in the industry.
Resumo:
The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.
Resumo:
Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.
Resumo:
There is a need to take a fresh look at the traditional application of the marketing concept to political marketing. As many businesses have learned, Integrated Marketing Communications (IMC) practices and principles will help them to build customer relationships and profitable brands. Political marketing must also change with the times and implement IMC practices toward building and nourishing brand relationships with voters and other important stakeholders. The nature of the contribution of this paper is the identification of a gap in the political marketing literature - the stagnation of political marketing at the 4P's marketing concept, and to play a role in the future development of political marketing. In recent developments, it is seen that there is a gradual movement away from this traditional marketing theory. There are a growing number of academics who have approached very closely to the IMC concept or aspects of it, but have not however embraced or have been reluctant to, the prospect of applying it to political marketing. IMC is a practical, logical and ultimately inevitable future for political marketing.
Resumo:
The need to “reduce red tape” and regulatory inconsistencies is a desirable outcome (OECD 1997) for developed countries. The costs normally associated with regulatory regimes are compliance costs and direct charges. Geiger and Hoffman (1998) have noted that the extent of regulation in an industry tends to be negatively associated with firm performance. Typically, approaches to estimation of the cost of regulations examine direct costs, such as fees and charges, together with indirect costs, such as compliance costs. However, in a fragmented system, such as Australia, costs can also be incurred due to procedural delays, either by government, or by industry having to adapt documentation for different spheres of government; lack of predictable outcomes, with variations occurring between spheres of government and sometimes within the same government agency; and lost business opportunities, with delays and red tape preventing realisation of business opportunities (OECD 1997). In this submission these costs are termed adaptation costs. The adaptation costs of complying with variations in regulations between the states has been estimated by the Building Product Innovation Council (2003) as being up to $600 million per annum for building product manufacturers alone. Productivity gains from increased harmonisation of the regulatory system have been estimated in the hundreds of millions of dollars (ABCB 2003). This argument is supported by international research which found that increasing the harmonisation of legislation in a federal system of government reduces what we have termed adaptation costs (OECD 2001). Research reports into the construction industry in Australia have likewise argued that improved consistency in the regulatory environment could lead to improvements in innovation (PriceWaterhouseCoopers 2002), and that research into this area should be given high priority (Hampson & Brandon 2004). The opinion of industry in Australia has consistently held that the current regulatory environment inhibits innovation (Manley 2004). As a first step in advancing improvements to the current situation, a summary of the current costs experienced by industry needs to be articulated. This executive summary seeks to outline these costs in the hope that the Productivity Commission would be able to identify the best tools to quantify the actual costs to industry.
Resumo:
The challenges of maintaining a building such as the Sydney Opera House are immense and are dependent upon a vast array of information. The value of information can be enhanced by its currency, accessibility and the ability to correlate data sets (integration of information sources). A building information model correlated to various information sources related to the facility is used as definition for a digital facility model. Such a digital facility model would give transparent and an integrated access to an array of datasets and obviously would support Facility Management processes. In order to construct such a digital facility model, two state-of-the-art Information and Communication technologies are considered: an internationally standardized building information model called the Industry Foundation Classes (IFC) and a variety of advanced communication and integration technologies often referred to as the Semantic Web such as the Resource Description Framework (RDF) and the Web Ontology Language (OWL). This paper reports on some technical aspects for developing a digital facility model focusing on Sydney Opera House. The proposed digital facility model enables IFC data to participate in an ontology driven, service-oriented software environment. A proof-of-concept prototype has been developed demonstrating the usability of IFC information to collaborate with Sydney Opera House’s specific data sources using semantic web ontologies.