776 resultados para Service Management
Resumo:
This paper discusses the problems inherent within traditional supply chain management's forecast and inventory management processes arising when tackling demand driven supply chain. A demand driven supply chain management architecture developed by Orchestr8 Ltd., U.K. is described to demonstrate its advantages over traditional supply chain management. Within this architecture, a metrics reporting system is designed by adopting business intelligence technology that supports users for decision making and planning supply activities over supply chain health.
Resumo:
Service Charge Management is an area of concern to property managers acting for both property occupiers and investors. This paper reviews the background to service charge management in the UK, and examines, by means of a survey, the current state of service charge practice in the surveying profession.
Resumo:
Facility management (FM), from a service oriented approach, addresses the functions and requirements of different services such as energy management, space planning and security service. Different service requires different information to meet the needs arising from the service. Object-based Building Information Modelling (BIM) is limited to support FM services; though this technology is able to generate 3D models that semantically represent facility’s information dynamically over the lifecycle of a building. This paper presents a semiotics-inspired framework to extend BIM from a service-oriented perspective. The extended BIM, which specifies FM services and required information, will be able to express building service information in the right format for the right purposes. The service oriented approach concerns pragmatic aspect of building’s information beyond semantic level. The pragmatics defines and provides context for utilisation of building’s information. Semiotics theory adopted in this paper is to address pragmatic issues of utilisation of BIM for FM services.
Resumo:
Grassland ecosystems have been severely reduced and grassland bird populations have experienced consistent declines. National Park Service (NPS) properties on the Great Plains provide breeding habitat for grassland songbirds, though little is known about the quality of this habitat. A short-term study on songbirds at three NPS properties complemented current monitoring, providing an among park comparison addressing grassland bird productivity and fidelity relative to NPS property size. During 2008-2009, I assessed avian species richness, and estimated bird density and grassland songbird nest success. Bird species richness was greatest at small and medium sites, while number of nesting obligate species was greatest at the large site. Species-specific densities varied among sites, with few grassland obligates occurring at all three sites. Nest success estimates for grassland obligates were highest at the small site and lower at the large site. Another method to quantify habitat quality is assessment of breeding site fidelity. Current extrinsic markers used in monitoring site fidelity are inadequate for small birds; stable isotope analyses provide an alternative. I compared two techniques for assigning stable isotope tissue origin and measured grassland songbird site fidelity. My method of assigning origin provided site-specific variances of expected stable isotope values, an improvement over the most commonly used method. Fidelity tended to be higher at the large site, which may indicate a more robust breeding community of grassland birds. The small size of two of my sites precluded large sample sizes and made strong inferences difficult. To quantify how scientists cope with weak inference, I conducted a literature review. Strong inference was rarely observed, and most authors of weak-inference papers provided specific management recommendations. I suggest that adaptive management is an ideal method to resolve uncertainty from weak inference. Managers should consider my results within the context of regional and global management and the extent to which their unit might aide songbird conservation.
Resumo:
When looking at developing countries, the prolonged intensive medical and nursing care required by many patients places extra demands on an already stretched healthcare budget. The purpose of this study was to verify the effectiveness of a systematic rehabilitative program for swallowing and oral-motor movements in intensive care unit patients with the diagnosis of tetanus. Forty-five patients who were clinically diagnosed with tetanus were included in the study. Participants were divided in two groups: Cl - consisted of 18 tetanus patients who were consecutively admitted to the infectious disease ICU from January 2002 to December 2005, prior to the existence of a systematic swallowing and oral-motor intervention: GII - consisted of 27 tetanus patients who were consecutively admitted to the infectious disease ICU from January 2006 to December 2009 and were submitted to a specific rehabilitative management of swallowing and of the oral-motor movements. Results indicate that the proposed rehabilitative program reduced by approximately 50% the time patients remained in the ICU. The significant improvement observed in patients with tetanus who were submitted to the rehabilitative program for swallowing and oral-motor movements occurred in conjunction with a reduction in the amount of time necessary to reintroduce oral feeding, to decannulate and to remove the feeding tubes. In conclusion, swallowing/muscle exercise, in patients with severe/very severe tetanus, seem to promote the remission of muscle tension and seem to maximize functional swallowing. (C) 2012 Elsevier B.V. All rights reserved.
Resumo:
Supply chain starts with a demand arisen and ends with material transport and delivery at its final destination. With this in mind, most of manufacturing, processors or distribution companies of consumer goods, spare parts and components for production, processing and finished goods, within national or international markets, may not have information and control over its supply chain performance. This article presents concept and logistics models evolution, purchase order and international supplier management, control tower and its logistics information systems. This also presents a real process implementation for a global high tech manufacturer company.
Resumo:
L’obiettivo dell’elaborato è mostrare come, partendo da una robusta base teorica nelle discipline del Project Management e del Business Process Reengineering, sia possibile ridefinire un sistema di gestione dei progetti (a livello singolo e di aggregato) e sviluppare, presso il personale coinvolto, le competenze necessarie a sostenere autonomamente ed a migliorare il sistema così creato. La reingegnerizzazione della progettazione nell’azienda in esame si è sviluppata nell’arco di un quadriennio: nel 2010 è stata concretizzata la prima release dei processi di gestione del progetto singolo e dell’aggregato, nel 2011 è maturata la seconda release, mentre nel biennio 2012-2013 si sono “congelati” i risultati ottenuti e si è sviluppata l’autonomia dei Project Manager interni e del Project Management Office. Dall’analisi è emersa l’importanza di un solido approccio metodologico negli interventi di innovazione organizzativa.