996 resultados para Queensland buildings


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses challenges to developers of a national Life Cycle Inventory (LCI) database on which to base assessment of building environmental impacts and a key to development of a fully integrated eco-design tool created for automated eco-efficiency assessment of commercial building design direct from 3D CAD. The scope of this database includes Australian and overseas processing burdens involved in acquiring, processing, transporting, fabricating, finishing and using metals, masonry, timber, glazing, ceramics, plastics, fittings, composites and coatings. Burdens are classified, calculated and reported for all flows of raw materials, fuels, energy and emissions to and from the air, soil and water associated with typical products and services in building construction, fitout and operation. The aggregated life cycle inventory data provides the capacity to generate environmental impact assessment reports based on accepted performance indicators. Practitioners can identify hot spots showing high environmental burdens of a proposed design and drill down to report on specific building components. They can compare assessments with case studies and operational estimates to assist in eco-efficient design of a building, fitout and operation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For a sustainable building industry, not only should the environmental and economic indicators be evaluated but also the societal indicators for building. Current indicators can be in conflict with each other, thus decision making is difficult to clearly quantify and assess sustainability. For the sustainable building, the objectives of decreasing both adverse environmental impact and cost are in conflict. In addition, even though both objectives may be satisfied, building management systems may present other problems such as convenience of occupants, flexibility of building, or technical maintenance, which are difficult to quantify as exact assessment data. These conflicting problems confronting building managers or planners render building management more difficult. This paper presents a methodology to evaluate a sustainable building considering socio-economic and environmental characteristics of buildings, and is intended to assist the decision making for building planners or practitioners. The suggested methodology employs three main concepts: linguistic variables, fuzzy numbers, and an analytic hierarchy process. The linguistic variables are used to represent the degree of appropriateness of qualitative indicators, which are vague or uncertain. These linguistic variables are then translated into fuzzy numbers to reflect their uncertainties and aggregated into the final fuzzy decision value using a hierarchical structure. Through a case study, the suggested methodology is applied to the evaluation of a building. The result demonstrates that the suggested approach can be a useful tool for evaluating a building for sustainability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Understanding the differences between the temporal and physical aspects of the building life cycle is an essential ingredient in the development of Building Environmental Assessment (BEA) tools. This paper illustrates a theoretical Life Cycle Assessment (LCA) framework aligning temporal decision-making with that of material flows over building development phases. It was derived during development of a prototype commercial building design tool that was based on a 3-D CAD information and communications technology (ICT) platform and LCA software. The framework aligns stakeholder BEA needs and the decision-making process against characteristics of leading green building tools. The paper explores related integration of BEA tool development applications on such ICT platforms. Key framework modules are depicted and practical examples for BEA are provided for: • Definition of investment and service goals at project initiation; • Design integrated to avoid overlaps/confusion over the project life cycle; • Detailing the supply chain considering building life cycle impacts; • Delivery of quality metrics for occupancy post-construction/handover; • Deconstruction profiling at end of life to facilitate recovery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

LCADesign software package is a real-time environmental impact calculator for commercial property that works directly from the building designer's model. It enables developers, building designers, architects, engineers, builders, manufacturers and government bodies to optimise the eco-impact of a building as the design model evolves instead of waiting months for expert analysis. By integrating with the Building Information Models (BIMs) generated by 3D computer-aided drafting, LCADesign builds eco-efficiency into the design stage and measures the environmental values and risks of materials in commercial buildings

Relevância:

20.00% 20.00%

Publicador:

Resumo:

AIMM stands for 'Agents for Improved Maintenance Management.' The AIMM system is a prototype tool that has developed the state of the art life cycle modelling of buildings through the linking of a 3D model with maintenance data to allow both the facility manager and the designer to gain access to building maintenance information and knowledge that is currently inaccessible. AIMM integrates data mining agents into the maintenance process to produce timely data for the facility manager on the effects of different maintenance regimes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Differential axial shortening, distortion and deformation in high rise buildings is a serious concern. They are caused by three time dependent modes of volume change; “shrinkage”, “creep” and “elastic shortening” that takes place in every concrete element during and after construction. Vertical concrete components in a high rise building are sized and designed based on their strength demand to carry gravity and lateral loads. Therefore, columns and walls are sized, shaped and reinforced differently with varying concrete grades and volume to surface area ratios. These structural components may be subjected to the detrimental effects of differential axial shortening that escalates with increasing the height of buildings. This can have an adverse impact on other structural and non-structural elements. Limited procedures are available to quantify axial shortening, and the results obtained from them differ because each procedure is based on various assumptions and limited to few parameters. All these prompt to a need to develop an accurate numerical procedure to quantify the axial shortening of concrete buildings taking into account the important time varying functions of (i) construction sequence (ii) Young’s Modulus and (iii) creep and shrinkage models associated with reinforced concrete. General assumptions are refined to minimize variability of creep and shrinkage parameters to improve accuracy of the results. Finite element techniques are used in the procedure that employs time history analysis along with compression only elements to simulate staged construction behaviour. This paper presents such a procedure and illustrates it through an example. Keywords: Differential Axial Shortening, Concrete Buildings, Creep and Shrinkage, Construction Sequence, Finite Element Method.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since 1995 the buildingSMART International Alliance for Interoperability (buildingSMART)has developed a robust standard called the Industry Foundation Classes (IFC). IFC is an object oriented data model with related file format that has facilitated the efficient exchange of data in the development of building information models (BIM). The Cooperative Research Centre for Construction Innovation has contributed to the international effort in the development of the IFC standard and specifically the reinforced concrete part of the latest IFC 2x3 release. Industry Foundation Classes have been endorsed by the International Standards Organisation as a Publicly Available Specification (PAS) under the ISO label ISO/PAS 16739. For more details, go to http://www.tc184- sc4.org/About_TC184-SC4/About_SC4_Standards/ The current IFC model covers the building itself to a useful level of detail. The next stage of development for the IFC standard is where the building meets the ground (terrain) and with civil and external works like pavements, retaining walls, bridges, tunnels etc. With the current focus in Australia on infrastructure projects over the next 20 years a logical extension to this standard was in the area of site and civil works. This proposal recognises that there is an existing body of work on the specification of road representation data. In particular, LandXML is recognised as also is TransXML in the broader context of transportation and CityGML in the common interfacing of city maps, buildings and roads. Examination of interfaces between IFC and these specifications is therefore within the scope of this project. That such interfaces can be developed has already been demonstrated in principle within the IFC for Geographic Information Systems (GIS) project. National road standards that are already in use should be carefully analysed and contacts established in order to gain from this knowledge. The Object Catalogue for the Road Transport Sector (OKSTRA) should be noted as an example. It is also noted that buildingSMART Norway has submitted a proposal

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: To define characteristics of vehicle crashes occurring on rural private property in north Queensland with an exploration of associated risk factors. Design: Descriptive analysis of private property crash data collected by the Rural and Remote Road Safety Study. Setting: Rural and remote north Queensland. Participants: A total of 305 vehicle controllers aged 16 years or over hospitalised at Atherton, Cairns, Mount Isa or Townsville for at least 24 hours as a result of a vehicle crash. Main outcome measure: A structured questionnaire completed by participants covering crash details, lifestyle and demographic characteristics, driving history, medical history, alcohol and drug use and attitudes to road use. Results: Overall, 27.9% of interviewees crashed on private property, with the highest proportion of private road crashes occurring in the North West Statistical Division (45%). Risk factors shown to be associated with private property crashes included male sex, riding off-road motorcycle or all-terrain vehicle, first-time driving at that site, lack of licence for vehicle type, recreational use and not wearing a helmet or seatbelt. Conclusions: Considerable trauma results from vehicle crashes on rural private property. These crashes are not included in most crash data sets, which are limited to public road crashes. Legislation and regulations applicable to private property vehicle use are largely focused on workplace health and safety, yet work-related crashes represent a minority of private property crashes in north Queensland.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aims: The Rural and Remote Road Safety Study (RRRSS) addresses a recognised need for greater research on road trauma in rural and remote Australia, the costs of which are disproportionately high compared with urban areas. The 5-year multi-phase study with whole-of-government support concluded in June 2008. Drawing on RRRSS data, we analysed fatal motorcycle crashes which occurred over 39 months to provide a description of crash characteristics, contributing factors and people involved. The descriptive analysis and discussion may inform development of tailored motorcycle safety interventions. Methods: RRRSS criteria sought vehicle crashes resulting in death or hospitalisation for 24 hours minimum of at least 1 person aged 16 years or over, in the study area defined roughly as the Queensland area north from Bowen in the east and Boulia in the west (excluding Townsville and Cairns urban areas). Fatal motorcycle crashes were selected from the RRRSS dataset. Analysis considered medical data covering injury types and severity, evidence of alcohol, drugs and prior medical conditions, as well as crash descriptions supplied by police to Queensland Transport on contributing circumstances, vehicle types, environmental conditions and people involved. Crash data were plotted in a geographic information system (MapInfo) for spatial analysis. Results: There were 23 deaths from 22 motorcycle crashes on public roads meeting RRRSS criteria. Of these, half were single vehicle crashes and half involved 2 or more vehicles. In contrast to general patterns for driver/rider age distribution in crashes, riders below 25 years of age were represented proportionally within the population. Riders in their thirties comprised 41% of fatalities, with a further 36% accounted for by riders in their fifties. 18 crashes occurred in the Far North Statistical Division (SD), with 2 crashes in both the Northern and North West SDs. Behavioural factors comprised the vast majority of contributing circumstances cited by police, with adverse environmental conditions noted in only 4 cases. Conclusions: Fatal motorcycle crashes were more likely to involve another vehicle and less likely to involve a young rider than non-fatal crashes recorded by the RRRSS. Rider behaviour contributed to the majority of crashes and should be a major focus of research, education and policy development, while other road users’ behaviour and awareness also remains important. With 68% of crashes occurring on major and secondary roads within a 130km radius of Cairns, efforts should focus on this geographic area.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introduction: The demand for emergency health services (EHS), both in the prehospital (ambulance) and hospital (emergency departments) settings, is growing rapidly in Australia. Broader health system changes have reduced available health infrastructure, particularly hospital beds, resulting in reduced access to and congestion of the EHS as demonstrated by longer waiting times and ambulance “ramping”. Ambulance ramping occurring when patients have a prolonged wait on the emergency vehicle due to the unavailability of hospital beds. This presentation will outline the trends in EHS demand in Queensland compared with the rest of Australia and factors that appear to be contributing to the growth in demand. Methods: Secondary analysis was conducted using data from publicly available sources. Data from the Queensland Ambulance Service and Queensland Health Emergency Department Information System (EDIS) also were analyzed. Results: The demand for ambulance services and emergency departments has been increasing at 8% and 4% per year over the last decade, respectively; while accessible hospital beds have reduced by almost 10% contributing to the emergency department congestion and possibly contributing to the prehospital demand. While the increase in the proportion of the elderly population seems to explain a great deal of the demand for EHS, other factors also influence this growth including patient characteristics, institutional and societal factors, economic, EHS arrangements, and clinical factors. Conclusions: Overcrowding of facilities that provide EHS are causing considerable community concern. This overcrowding is caused by the growing demand and reduced access. The causes of this growing demand are complex, and require further detailed analysis in order to quantify and qualify these causes in order to provide a resilient foundation of evidence for future policy direction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background - This study examined demographic profile, continuation rates and reasons for removal among Implanon® users accessing two family planning clinics in Queensland, Australia. Study Design - A retrospective chart audit of 976 women who attended for implant insertion over a 3-year period between May 2001 and May 2004. Results - Continuation rates showed that at 6 months after insertion, 94% of women continued, 74% continued at 1 year and 50% continued at 2 years. Metropolitan women were more likely than rural women to discontinue use because of dissatisfaction with bleeding patterns. Cox regression analysis showed that those attending the regional clinic experienced significantly shorter time to removal. Conclusions - Implanon® continuation rates and reasons for removal differ between clinics in metropolitan and rural locations. A cooling-off period did not affect the likelihood of continuation with Implanon®. Preinsertion counselling should emphasize potential changes in bleeding patterns.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article was written in 1997. After a 2009 review the content was left mostly unchanged - apart from this re-written abstract, restructured headings and a table of contents. The article deals directly with professional registration of surveyors; but it also relates to government procurement of professional services. The issues include public service and professional ethics; setting of professional fees; quality assurance; official corruption; and professional recruitment, education and training. Debate on the Land Surveyors Act 1908 (Qld) and its amendments to 1916 occurred at a time when industrial unrest of the 1890s and common market principles of the new Commonwealth were fresh in peoples’ minds. Industrial issues led to a constitutional crisis in the Queensland’s then bicameral legislature and frustrated a first attempt to pass a Surveyors Bill in 1907. The Bill was re-introduced in 1908 after fresh elections and Kidston’s return as state premier. Co-ordinated immigration and land settlement polices of the colonies were discontinued when the Commonwealth gained power over immigration in 1901. Concerns shifted to protecting jobs from foreign competition. Debate on 1974 amendments to the Act reflected concerns about skill shortages and professional accreditation. However, in times of economic downturn, a so-called ‘chronic shortage of surveyors’ could rapidly degenerate into oversupply and unemployment. Theorists championed a naïve ‘capture theory’ where the professions captured governments to create legislative barriers to entry to the professions. Supposedly, this allowed rent-seeking and monopoly profits through lack of competition. However, historical evidence suggests that governments have been capable of capturing and exploiting surveyors. More enlightened institutional arrangements are needed if the community is to receive benefits commensurate with sizable co-investments of public and private resources in developing human capital.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has been increasing reliance on mechanical heating, ventilation and air-conditioning (HVAC) systems to achieve thermal comfort in office buildings. The use of universal standards for thermal comfort adopted in air-conditioned spaces often results in a large disparity between mean daily external summer temperatures and temperatures experienced indoors. The extensive overuse of air-conditioning in warm climates not only isolates us from the vagaries of the external environment, but is generally dependent on non-renewable energy. A pilot study conducted at the Queensland University of Technology (QUT) involved altering the thermostat set-points to two or three degrees above the normal summer setting in two air-conditioned buildings during the subtropical summer. This paper presents the findings of the research that led to the formulation of the test study. The findings of the test study are printed in the companion paper DES 72: Adjusting Building Thermastats for Environmental Gains – a Pilot Study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Actions Towards Sustainable Outcomes Environmental Issues/Principal Impacts The increasing urbanisation of cities brings with it several detrimental consequences, such as: • Significant energy use for heating and cooling many more buildings has led to urban heat islands and increased greenhouse gas emissions. • Increased amount of hard surfaces, which not only contributes to higher temperatures in cities, but also to increased stormwater runoff. • Degraded air quality and noise. • Health and general well-being of people is frequently compromised, by inadequate indoor air quality. • Reduced urban biodiversity. Basic Strategies In many design situations, boundaries and constraints limit the application of cutting EDGe actions. In these circumstances, designers should at least consider the following: • Living walls are an emerging technology, and many Australian examples function more as internal feature walls. However,as understanding of the benefits and construction of living walls develops this technology could be part of an exterior facade that enhances a building’s thermal performance. • Living walls should be designed to function with an irrigation system using non-potable water. Cutting EDGe Strategies • Living walls can be part of a design strategy that effectively improves the thermal performance of a building, thereby contributing to lower energy use and greenhouse gas emissions. • Including living walls in the initial stages of design would provide greater flexibility to the design, especially of the facade, structural supports, mechanical ventilation and watering systems, thus lowering costs. • Designing a building with an early understanding of living walls can greatly reduce maintenance costs. • Including plant species and planting media that would be able to remove air impurities could contribute to improved indoor air quality, workplace productivity and well-being. Synergies and References • Living walls are a key research topic at the Centre for Subtropical Design, Queensland University of Technology: http://www.subtropicaldesign.bee.qut.edu.au • BEDP Environment Design Guide: DES 53: Roof and Facade Gardens • BEDP Environment Design Guide: GEN 4: Positive Development – Designing for Net Positive Impacts (see green scaffolding and green space frame walls). • Green Roofs Australia: www.greenroofs.wordpress.com • Green Roofs for Healthy Cities USA: www.greenroofs.org