820 resultados para Projects in dispute


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In 2011 Queensland suffered both floods and cyclones, leaving residents without homes and their communities in ruins (2011). This paper presents how researchers from QUT, who are also members of the Oral History Association of Australia (OHAA) Queensland’s chapter, are using oral history, photographs, videography and digital storytelling to help heal and empower rural communities around the state and how evaluation has become a key element of our research. QUT researchers ran storytelling workshops in the capital city of Brisbane i early 2011, after the city suffered sever flooding. Cyclone Yasi then struck the town of Cardwell (in February 2011) destroying their historical museum and recording equipment. We delivered an 'emergency workshop', offering participants hands on use of the equipment, ethical and interviewing theory, so that the community could start to build a new collection. We included oral history workshops as well as sessions on how best to use a video camera, digital camera and creative writing sessions, so the community would also know how to make 'products' or exhibition pieces out of the interviews they were recording. We returned six months later to conduct follow-up workshops and the material produced by and with the community had been amazing. More funding has now been secured to replicate audio/visual/writing workshops in other remote rural Queensland communities including Townsville, Mackay and Cunnamulla and Toowoomba in 2012, highlighting the need for a multi media approach, to leverage the most out of OH interviews as a mechanism to restore and promote community resilience and pride.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

On 3 February 2011, Cyclone Yasi struck the coast of North Queensland, causing widespread damage. The cyclone destroyed the small coastal town of Cardwell, about 165 kilometres north of Townsville, Queensland. This chapter serves as a case study of a collaborative outreach project mobilised in response to this disaster in North Queensland. A public history research team, consisting of practitioners from the Queensland University of Technology’s Creative Industries Faculty, with the support of the Oral History Association of Australia, Queensland branch, partnered with the Cardwell and District Historical Society to support the society to collect community narratives in the wake of Cyclone Yasi.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cyclone Yasi struck the Cassowary Coast of Queensland in the early hours of Feb 3, 2011, destroying many homes sand property, including the destruction of the Cardwell and district historical society’s premises. With their own homes flattened, many were forced to live in mobile accommodation, with extended family, or leave altogether. The historical society members however were more devastated by their flattened foreshore museum and loss of their collection material. A call for assistance was made through the OHAA Qld branch, who along with QUT sponsored a trip to somehow plan how they could start to pick up the pieces to start again. This presentation highlights the need for communities to gather, preserve and present their own stories, in a way that is sustainable and meaningful to them, but that good advice and support along the way is important. Two 2 day workshops were held in March and then September, augmented by plenty of email correspondence and phone calls in between. Participants learnt that if they could conduct quality oral history interviews, they could later use these in many exhibitable ways including: documentary pieces; digital stories; photographic collections; creative short stories; audio segments –while also drawing closely together a suffering community. This story is not only about the people who were interviewed about the night Yasi struck, but the amazing women (all over 50) of the historical society who were willing to try and leap the digital divide that faces older Australians, especially those in rural Australia, so that their older local stories would not be lost and so that new stories could also be remembered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design-build (DB) delivery system is an effective means of delivering a green construction project and selecting an appropriate contractor is critical to project success. Moreover, the delivery of green buildings requires specific design, construction and operation and maintenance considerations not generally encountered in the procurement of conventional buildings. Specifying clear sustainability requirements to potential contractors is particularly important in achieving sustainable project goals. However, many client/owners either do not explicitly specify sustainability requirements or do so in a prescriptive manner during the project procurement process. This paper investigates the current state-of-the-art procurement process used in specifying the sustainability requirements of the public sector in the USA construction market by means of a robust content analysis of 40 design-build requests for proposals (RFPs). The results of the content analysis indicate that the sustainability requirement is one of the most important dimensions in the best-value evaluation of DB contractors. Client/owners predominantly specify the LEED certification levels (e.g. LEED Certified, Silver, Gold, and Platinum) for a particular facility, and include the sustainability requirements as selection criteria (with specific importance weightings) for contractor evolution. Additionally, larger size projects tend to allocate higher importance weightings to sustainability requirements.This study provides public DB client/owners with a number of practical implications for selecting appropriate design-builders for sustainable DB projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Human computer interaction and interaction design have recognised the need for participatory methods of co-design to contribute to designing human-centred interfaces, systems and services. Design thinking has recently developed as a set of strategies for human-centred co-design in product innovation, management and organisational transformation. Both developments place the designer in a new mediator role, requiring new skills than previously evident. This paper presents preliminary findings from a PhD case study of strategy and innovation consultancy Second Road to discuss these emerging roles of design lead, facilitator, teacher and director in action.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In participatory design projects, maintaining effective communication between facilitator and participant is essential. This paper describes the consideration given to the choice of communication modes to engage participation of rural Indonesian craftspeople over the course of a significant 3 year project that aims to grow their self-determination, design and business skill. We demonstrate the variety and subtlety of oral and written forms of communication used by the facilitator during the project. The culture, the communication skill and the influence of tacit knowledge affect the effectiveness of some modes of communication over the others, as well as the available infrastructure. Considerations are specific to the case of rural Indonesian craftspeople, but general lessons can be drawn.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As the adoption of project financing is gaining momentum, there is a concurrent need of innovation in project financing scheme in order to accelerate infrastructure assets provision in Indonesia. As the largest Muslim population in the world, sharia-compliant financing offers tremendous potential as a source for infrastructure financing for Indonesia. To realize this potential, there is a need of a framework to guide its adoption. Hence this paper discusses the potential implementation of Islamic finance to fund infrastructure projects in Indonesia. Through comparative analysis, this paper illustrates how Islamic principles can be incorporated into Indonesian infrastructure project financing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project Management (PM) as an academic field is relatively new in Australian universities. Moreover, the field is distributed across four main areas: business (management), built environment and construction, engineering and more recently ICT (information systems). At an institutional level, with notable exceptions, there is little engagement between researchers working in those individual areas. Consequently, an initiative was launched in 2009 to create a network of PM researchers to build a disciplinary base for PM in Australia. The initiative took the form of a bi-annual forum. The first forum established the constituency and spread of PM research in Australia (Sense et al., 2011). This special issue of IJPM arose out of the second forum, held in 2012, that explored the notion of an Australian perspective on PM. At the forum, researchers were invited to collaborate to explore issues, methodological approaches, and theoretical positions underpinning their research and to answer the question: is there a distinctly Australian research agenda which responds to the current challenges of large and complex projects in our region? From a research point of view, it was abundantly clear at the forum that many of the issues facing Australian researchers are shared around the world. However, what emerged from the forum as the Australian perspective was a set of themes and research issues that dominate the Australia research agenda.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian economy is currently supported by a resources boom and work opportunities in traditionally male dominated fields of construction and engineering and information technology are at a premium. Yet despite more than 25 years of anti discrimination and equal employment opportunity legislation these industries still employ few women in operational or management roles. This paper investigates the issue of the low representation of women in project management and their different work and career experiences through interviews with male and female project managers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Presently organisations engage in what is termed as Global Business Transformation Projects [GBTPs], for consolidating, innovating, transforming and restructuring their processes and business strategies while undergoing fundamental change. Culture plays an important role in global business transformation projects as these involve people of different cultural backgrounds and span across countries, industries and disciplinary boundaries. Nevertheless, there is scant empirical research on how culture is conceptualised beyond national and organisational cultures but also on how culture is to be taken into account and dealt with within global business transformation projects. This research is situated in a business context and discovers a theory that aids in describing and dealing with culture. It draws on the lived experiences of thirty-two senior management practitioners, reporting on more than sixty-one global business transformation projects in which they were actively involved. The research method used is a qualitative and interpretive one and applies a grounded theory approach, with rich data generated through interviews. In addition, vignettes were developed to illustrate the derived theoretical models. The findings from this study contribute to knowledge in multiple ways. First, it provides a holistic account of global business transformation projects that describe the construct of culture by the elements of culture types, cultural differences and cultural diversity. A typology of culture types has been developed which enlarges the view of culture beyond national and organisational culture including an industry culture, professional service firm culture and 'theme' culture. The amalgamation of the culture types instantiated in a global business transformation project compromises its project culture. Second, the empirically grounded process for managing culture in global business transformation projects integrates the stages of recognition, understanding and management as well as the enablement providing a roadmap for dealing with culture in global business transformation projects. Third, this study identified contextual variables to global business transformation projects, which provide the means of describing the environment global business transformation projects are situated, influence the construct of culture and inform the process for managing culture. Fourth, the contribution to the research method is the positioning of interview research as a strategy for data generation and the detailed documentation applying grounded theory to discover theory.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The market of building retrofits is increasingly more intensified as existing buildings are aging. The building retrofit projects involve existing buildings which impose constraints on stakeholders throughout the project process. They are also risky, complex, less predictable and difficult to be well planned with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors, but they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. This paper first discusses the requirements of waste management in building retrofit projects considering specific project characteristics and work natures, and highlights the importance of involving SMEs in waste planning and management through an appropriate way. By utilizing semi-structured interviews, this research develops a process model for SMEs to be applied in waste management. A collaboration scenario is also developed for collaborative waste planning and management by SMEs as subcontractors and large companies as main contractors. Findings from the paper will promote coordination of project delivery and waste management in building retrofit projects, and improve the involvement and performance of SMEs in dealing with waste problems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years there has been a noticeable move by various public institutions, such as public service broadcasters and community media organisations, to capture and disseminate the voices and viewpoints of ‘ordinary people’ through inviting them to share stories about their lives. One of the foremost objectives of many such projects is to provide under-represented individuals and groups with an opportunity to express and represent themselves; as such, the capture and broadcast of ‘authentic voices’ is a central value. This paper discusses the notion of ‘authentic voice’, and questions the framing role of public media organisations in storytelling projects that aim to provide individuals with space for self-expression and self-representation. It considers the ways in which tensions arise on multiple levels when individuals are asked to express and represent themselves within projects and spaces that are managed by institutions. This paper begins by discussing the challenges and opportunities that arise within storytelling projects that are facilitated by public institutions and community media arts organisations, and that aim to amplify the voices of “ordinary people” (Thumim, 2009). It examines ways in which ‘voice’ is facilitated, curated, broadcast and distributed within such projects, particularly questioning the ways in which project facilitation and the curation of stories for public broadcast can both help and hinder the amplification of ‘authentic voice’. Furthermore, we seek to discuss how ‘authentic voice’ is defined, and what is involved in the process of amplification. The paper moves on to discuss a case study in order to demonstrate some of the tensions that are evident within a storytelling project that is managed by a public institution – Australia’s national broadcaster – and the ways these tensions impact upon the capture and broadcast of an ‘authentic voice’ for project participants. The Australian Broadcasting Corporation’s (ABC) ‘Heywire’ project is a storytelling competition and website that aims to ‘give voice’ to 16-22 year olds who live in rural, regional and remote parts of Australia. Looking at tensions that exist on organisational, political and philosophical levels within the Heywire project reveals a number of conflicts of interest and objectives between the institution and project participants. This leads us to question whether institutionally-managed storytelling projects can effectively support individuals to have an ‘authentic voice’, and whether struggles of aims and objectives diminish the personal benefits that people may derive from expressing and representing themselves within such projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

It is well-known that the use of off-site manufacture (OSM) techniques can assist in timely completion of a construction project though the utilisation of such techniques may have other disadvantages. Currently, OSM uptake within the Australian construction industry is limited. To successfully incorporate OSM practices within a construction project, it is crucial to understand the impact of OSM adoption on the processes used during a construction project. This paper presents how a systematic process-oriented approach may be able to support OSM utilisation within a construction project. Process modelling, analysis and automation techniques which are well-known within the Business Process Management (BPM) discipline have been applied to develop a collection of construction process models that represent the end-to-end generic construction value chain. The construction value chain enables researchers to identify key activities, resources, data, and stakeholders involved in construction processes in each defined construction phase. The collection of construction process models is then used as a basis for identification of potential OSM intervention points in collaboration with domain experts from the Australian construction industry. This ensures that the resulting changes reflect the needs of various stakeholders within the construction industry and have relevance in practice. Based on the input from the domain experts, these process models are further refined and operational requirements are taken into account to develop a prototype process automation (workflow) system that can support and coordinate OSM-related process activities. The resulting workflow system also has the potential to integrate with other IT solutions used within the construction industry (e.g., BIM, Acconex). As such, the paper illustrates the role that process-oriented thinking can play in assisting OSM adoption within the industry.