951 resultados para Intersonic Crack Extension
Resumo:
In a just-in-time, assemble-to-order production environments the scheduling of material requirements and production tasks - even though difficult - is of paramount importance. Different enterprise resource planning solutions with master scheduling functionality have been created to ease this problem and work as expected unless there is a problem in the material flow. This case-based candidate’s thesis introduces a tool for Microsoft Dynamics AX multisite environment, that can be used by site managers and production coordinators to get an overview of the current open sales order base and prioritize production in the event of material shortouts to avoid part-deliveries.
Resumo:
List of Employees to be involved in the extension of the Port Dalhousie and Thorold Railway (1 page, handwritten). This is signed by S.D. Woodruff, Nov. 25, 1856.
Resumo:
Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.