862 resultados para Erie and Niagara Railway Company.
Resumo:
The patent incorporates the Ontario Grape Growing and Wine Manufacturing Company for the purpose "for the manufacture of wine within the province of Ontario" and is recorded as no. 85 on June 9, 1873.
Resumo:
Letter to George Rykert (president of the Port Dalhousie and Thorold Railway), engineer from William Danforth, civil engineer in which he states that the preliminary survey has been made between Port Dalhousie and Centreville at which point it may intersect with the Great Western Railway. The estimate is included (2 pages, handwritten), July 25, 1853.
Resumo:
Notice that the Port Dalhousie and Thorold Railway map and plans have been certified by commissioners. This is signed “secretary”, n.d.
Resumo:
Calculations regarding quantities needed for cutting and ditching (1 page, handwritten), March 19, 1884.
Resumo:
Estimated cost of the Port Dalhousie and Thorold Railway sent to George Rykert by S.D. Woodruff, Aug. 5, 1854.
Resumo:
Letter sent from the Port Dalhousie and Thorold Railway to the Town Council of St. Catharines which states that the estimate that was submitted does not embrace the damages done to the buildings along Line no. 1 from Port Dalhousie to Chisholm Corner. The estimates are included in the document, Aug. 17, 1854.
Resumo:
Memorandum of expenses for work done and materials provided by Messrs. Brown and McDonell, contractors for the Port Dalhousie and Thorold Railway to Sept. 1, 1854, signed by S.D. Woodruff, Sept. 2, 1854.
Resumo:
Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Sept. 30, 1854.
Resumo:
Memorandum of material furnished for superstructure on the line of the Port Dalhousie Thorold Railway by contract. This document includes: Bills of timber, memorandums of planking, fencing, ties, track laying, masonry and bolts and spikes. There are also diagrams of culverts. One of the pages is loose and the outer pages are somewhat discoloured (32 pages, handwritten and bound with ribbon, n.d.
Resumo:
Memorandum respecting differences between the approximate and the final estimate (3 ¼ pages, handwritten), n.d.
Resumo:
List of the number of loads dredged by Smiley’s Dredge since the 1st of October along the Welland Railway. This is addressed to S.D. Woodruff and signed by James Woodall of Lock No. 1. There are holes and stains in the document. Text is not affected, Jan. 12, 1859.
Resumo:
Diagrams of cross sections on the Welland Railway, Port Dalhousie (4 hand-drawn diagrams), March 1860.
Resumo:
Scrap of paper with numbers of railway journals volume numbers, n.d.
Resumo:
Pay roll voucher #12 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the office approved by F. Shanly, chief engineer, April, 1857.
Resumo:
Pay roll voucher #20 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Northern Division approved by F. Shanly, chief engineer and W.G. Thompson, assistant engineer (copy) June 1857.