970 resultados para Devolution, Institutions, Fiscal Decentralisation, Competitiveness, Economic Development, Northern Ireland


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Organisation for Economic Co-operation and Development investigated numeracy proficiency among adults of working age in 23 countries across the world. Finland had the highest mean numeracy proficiency for people in the 16 – 24 age group while Northern Ireland’s score was below the mean for all the countries. An international collaboration has been undertaken to investigate the prevalence of mathematics within the secondary education systems in Northern Ireland and Finland, to highlight particular issues associated with transition into university and consider whether aspects of the Finnish experience are applicable elsewhere. In both Northern Ireland and Finland, at age 16, about half of school students continue into upper secondary level following their compulsory education. The upper secondary curriculum in Northern Ireland involves a focus on three subjects while Finnish students study a very wide range of subjects with about two-thirds of the courses being compulsory. The number of compulsory courses in maths is proportionally large; this means that all upper secondary pupils in Finland (about 55% of the population) follow a curriculum which has a formal maths content of 8%, at the very minimum. In contrast, recent data have indicated that only about 13% of Northern Ireland school leavers studied mathematics in upper secondary school. The compulsory courses of the advanced maths syllabus in Finland are largely composed of pure maths with a small amount of statistics but no mechanics. They lack some topics (for example, in advanced calculus and numerical methods for integration) which are core in Northern Ireland. This is not surprising given the much broader curriculum within upper secondary education in Finland. In both countries, there is a wide variation in the mathematical skills of school leavers. However, given the prevalence of maths within upper secondary education in Finland, it is to be expected that young adults in that country demonstrate high numeracy proficiency.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background There is growing evidence linking early social and emotional wellbeing to later academic performance and various health outcomes including mental health. An economic evaluation was designed alongside the Roots of Empathy cluster-randomised trial evaluation, which is a school-based intervention for improving pupils’ social and emotional wellbeing. Exploration of the relevance of the Strengths and Diffi culties Questionnaire (SDQ) and Child Health Utility 9D (CHU9D) in school-based health economic evaluations is warranted. The SDQ is a behavioural screening questionnaire for 4–17-year-old children, consisting of a total diffi culties score, and also prosocial behaviour,
which aims to identify positive aspects of behaviour. The CHU9D is a generic preference-based health-related quality of life instrument for 7–17-year-old children.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Globally the amount of installed terrestrial wind power both onshore and offshore has grown rapidly over the last twenty years. Most large onshore and offshore wind turbines are designed to harvest winds within the atmospheric boundary layer, which can be vary variable due to terrain and weather effects. The height of the neutral atmospheric boundary layer is estimated at above 1300m. A relatively new concept is to harvest more consistent wind conditions above the atmospheric boundary layer using high altitude wind harvesting devices such as tethered kites, air foils and dirigible rotors. This paper presents a techno-economic feasibility study of high altitude wind power in Northern Ireland. First this research involved a state of the art review of the resource and the technologies proposed for high altitude wind power. Next the techno-economic analysis involving four steps is presented. In step one, the potential of high altitude wind power in Northern Ireland using online datasets (e.g. Earth System Research Laboratory) is estimated. In step two a map for easier visualisation of geographical limitations (e.g. airports, areas of scenic beauty, flight paths, military training areas, settlements etc.) that could impact on high altitude wind power is developed. In step three the actual feasible resource available is recalculated using the visualisation map to determine the ‘optimal’ high altitude wind power locations in Northern Ireland. In the last step four the list of equipment, resources and budget needed to build a demonstrator is provided in the form of a concise techno-economic appraisal using the findings of the previous three steps.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In comparison to the rest of the United Kingdom (UK) the Northern Irish Construction Industry was disproportionately affected by the recent economic recession. During this period, use of the New Engineering Contract (NEC) has proliferated in the public sector, however no study has been undertaken to examine the impact of the recession on this contract in Northern Ireland. The aim of this paper is to explore NEC contract implementation in Northern Ireland and the impact of the recession on its operation. A qualitative methodology is adopted using a literature review and semi structured interviews with six construction professionals. A qualitative analysis identifies themes and issues arising exploring connections and links between them using thematic coding. The initial findings are that the introduction of the NEC contract in Northern Ireland makes demands of contractors and consultants in terms of additional resources and training. Some consultants show a clear lack of understanding of the contract and its provisions. Whilst there is general agreement that the contract does help to stimulate good project management, the interviewees find the contract time consuming and complicated to administer, describing it as “unforgiving for the architect and unforgiving to the contractor.” Due to the impact of the recession, both contractors and consultants are still reporting a drop in income from pre-recession levels. Project resourcing levels have dropped significantly since the onset of the recession. Adversarial and opportunistic behaviour has increased. Many consultants and contractors are struggling to adequately administer the NEC contract at current income levels. The introduction of the NEC contract and the economic recession have exerted opposing forces on the implementation of the contract, hindering its execution. As the pressures exerted by the economic recession abate and a greater understanding of the contract develops, these opposing forces will ease leading to a more consistent implementation of the contract.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper provides a contemporary examination of policy making and participatory practice in the context of devolving governance in the UK. The paper takes Northern Ireland as its focus and is particularly timely considering the context of devolved governance, the ongoing transition from conflict to relative peace and the potential for rejuvenating democracy through participatory
governance. The paper concentrates on one particular policy process, namely the attempted designation of a national park in the Mournes Area of Outstanding Natural Beauty. A thematic analysis of qualitative data is drawn upon to analyse the structural factors that framed the policymaking process, in particular the role of power in determining how consultation processes were 2 initiated, designed and undertaken. Using Lukes’ model) as an analytical framework, power is shown to manifest at multiple levels within the policy-making process to influence policy outcomes. The paper reveals how the persistence of a top-down approach to policy development combined with a highly parochial political outlook undermined attempts to designate a Mourne National Park. The paper concludes that, given the immaturity of recently devolved government in
Northern Ireland, in this instance, the democratising intentions of devolved governance have not been met. This has implications for Northern Ireland’s recent reform of public administration which devolves certain planning powers to local authority level and the management of the internationally significant Mournes landscape.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In May 2006, the NEC contract was introduced as the preferred contract for Northern Ireland public sector works. This was subsequently followed by the 2007 economic crash and ensuing recession, which continues to affect the Northern Ireland Construction Industry, to a greater extent than the remainder of the United Kingdom (UK). However, use of the NEC contract has increased during this period, particularly in the public sector. There has been debate in the literature regarding the impact of the NEC contract on adversarial behaviour, but little consideration of the impact of external economic factors on the use of the NEC contract. Using a sequential mixed method approach, the study aims to fill this gap in knowledge, through examination of the impact the economic downturn has had on the operation of the NEC contract in Northern Ireland. Qualitative and quantitative findings show that the demands placed by the NEC contract, and the effects of the economic recession, have exerted opposing forces contract implementation, thus hindering its execution. The findings can lead to a deeper understanding, in the context of both industry and academia, of situations where a lack of resources may negatively impact the operation of the NEC contract.