957 resultados para Dam
Resumo:
Spine title: Site 45-DO-273, Chief Joseph Dam Project.
Resumo:
Item 337
Resumo:
Includes bibliographical references.
Resumo:
"[Dams Branch] report no. DD-4."
Resumo:
Mode of access: Internet.
Resumo:
This report summarizes the data, observations, methods, assumptions, and decisions for the design of the Relief Well Rehabilitation Project in the Right Abutment Drainage Tunnel at Chief Joseph Dam. Chief Joseph Dam (CJD) is a dam on the Columbia River and is owned and operated by the U.S. Army Corps of Engineers (USACE). It is the second only to Grand Coulee dam as the largest producer of hydropower in the United States. The right abutment drainage tunnel contains wooden stave relief wells. Water flows from these wells which reduces the hydrostatic pressure in the right abutment of the dam. The 22 wells in the floor of the tunnel are 60 years old and are in need of rehabilitation. The objective of this project is to control the groundwater gradient, prevent the movement of sediment, stop total screen collapse, and prevent initiation of backwards erosion and piping in the abutment. The rehabilitation solution is to install new stainless steel screens into the existing wells, backfill the annular space between the old wooden screen and the new stainless steel screens with a 3/8-inch pea gravel filter pack, and install a new top cap to hold the new screen in place. This report documents the data, observations, and methods used to complete the final design. During tunnel inspections USACE geologists observed dislodged end plugs and evidence of sediment movement out of the formation. The relief wells have historically high flows between 6,000 gallons per minute (gpm) to 9,000 gpm. New screens are designed based on as-built data and historic tunnel flow. The new screens are 8-in diameter, 100 slot (0.10-inch) screens. We found that screen diameter and slot size would provide adequate transmitting capacity for most of the relief wells. The filter pack gradation is based on descriptions from foundation construction reports. I found that 3/8-inch pea gravel is appropriate for the abutment material. During design, I also considered an option to install the screens into the relief wells without filter pack. I eliminated this option because it did not meet our rehabilitation objective to prevent total failure of the wooden screens.
Resumo:
Thixotropy is the characteristic of a fluid to form a gelled structure over time when it is not subjected to shearing, and to liquefy when agitated. Thixotropic fluids are commonly used in the construction industry (e.g., liquid concrete and drilling fluids), and related applications include some forms of mud flows and debris flows. This paper describes a basic study of dam break wave with thixotropic fluid. Theoretical considerations were developed based upon a kinematic wave approximation of the Saint-Venant equations down a prismatic sloping channel. A very simple thixotropic model, which predicts the basic theological trends of such fluids, was used. It describes the instantaneous state of fluid structure by a single parameter. The analytical solution of the basic flow motion and theology equations predicts three basic flow regimes depending upon the fluid properties and flow conditions, including the initial degree of jamming of the fluid (related to its time of restructuration at rest). These findings were successfully compared with systematic bentonite suspension experiments. The present work is the first theoretical analysis combining the basic principles of unsteady flow motion with a thixotropic fluid model and systematic laboratory experiments.
Resumo:
Peer reviewed