984 resultados para Construction Civil
Resumo:
Ponencia sobre elementos constructivos elaborados con materiales reciclados
Resumo:
The relevance of renewable energy has grown significantly in our global society. Important efforts are oriented to sustain it. Renewable energy depends on different technical, financial environmental and social complex processes. From the point of view of industrial construction sector this research evaluates some of the current trends in energy generation and use in Venezuela as well as environmental consequences and risks that derive from these. Additionally, authors highlight the importance of infrastructure as key issue to sustain renewable energy generation and use. The study present references of some energy renewable projects in process in Venezuela and the main problems that constrain their performance. Conclusions evidence the complex nature of industrial construction and suggest the need to improve industrial construction competitivenes as a strategy oriented to enhance renewable energy offer in the country. Additionally it is proposed to all stakeholders to work toghether to correct the conditions that currently limit industrial construction development. This is part of ongoing research.
Resumo:
Se describen las variaciones de temperaturas y de tensiones durante la construcción de presas de hormigón compactado. The curing of concrete is an exothermic process. The heat of hydration generated induces temperature increases in the concrete, which will disappear in the long term by heat conduction in the concrete mass and thermal exchanges with the environment. The problem is of particularly interest for large concrete masses, as is the case of dams, because the time involved in the heat diffusion process grows with the square of the dimensions and a hotter dam interior implies the possibility of cracking the exposed surfaces of the dam. The Cuira dam, currently being built in Venezuela using roller compacted concrete, is a 134 m high, arch-gravity dam. In support of the design, different strategies were analysed, including various combinations of cooling of the water and the aggregate in order to achieve acceptable results. The calculations were conducted with Abaqus, taking into account all the necessary mechanical and thermal characteristics, as well as the relevant non-linearities. The analyses led to the conclusion that no cooling was required, even taking into account the stress state imposed by an early and rapid filling of the reservoir.
Resumo:
The engineer must have sufficient theoretical knowledge to be applied to solve specific problems, with the necessary capacity to simplify these approaches, and taking into account factors such as speed, simplicity, quality and economy. In Geology, its ultimate goal is the exploration of the history of the geological events through observation, deduction, reasoning and, in exceptional cases by the direct underground exploration or experimentation. Experimentation is very limited in Geology. Reproduction laboratory of certain phenomena or geological processes is difficult because both time and space become a large scale. For this reason, some Earth Sciences are in a nearly descriptive stage whereas others closest to the experimental, Geophysics and Geochemistry, have assimilated progress experienced by the physics and chemistry. Thus, Anglo-Saxon countries clearly separate Engineering Geology from Geological Engineering, i.e. Applied Geology to the Geological Engineering concepts. Although there is a big professional overlap, the first one corresponds to scientific approach, while the last one corresponds to a technological one. Applied Geology to Engineering could be defined as the Science and Applied Geology to the design, construction and performance of engineering infrastructures in and field geology discipline. There has been much discussion on the primacy of theory over practice. Today prevails the exaggeration of practice, but you get good workers and routine and mediocre teachers. This idea forgets too that teaching problem is a problem of right balance. The approach of the action lines on the European Higher Education Area (EHEA) framework provides for such balance. Applied Geology subject represents the first real contact with the physical environment with the practice profession and works. Besides, the situation of the topic in the first trace of Study Plans for many students implies the link to other subjects and topics of the career (tunnels, dams, groundwater, roads, etc). This work analyses in depth the justification of such practical trips. It shows the criteria and methods of planning and the result which manifests itself in pupils. Once practical trips experience developed, the objective work tries to know about results and changes on student’s motivation in learning perspective. This is done regardless of the outcome of their knowledge achievements assessed properly and they are not subject to such work. For this objective, it has been designed a survey about their motivation before and after trip. Survey was made by the Unidad Docente de Geología Aplicada of the Departamento de Ingeniería y Morfología del Terreno (Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos, Universidad Politécnica de Madrid). It was completely anonymous. Its objective was to collect the opinion of the student as a key agent of learning and teaching of the subject. All the work takes place under new teaching/learning criteria approach at the European framework in Higher Education. The results are exceptionally good with 90% of student’s participation and with very high scores in a number of questions as the itineraries, teachers and visited places (range of 4.5 to 4.2 in a 5 points scale). The majority of students are very satisfied (average of 4.5 in a 5 points scale).
Resumo:
The recognition of the relevance of energy, especially of the renewable energies generated by the sun, water, wind, tides, modern biomass or thermal is growing significantly in the global society based on the possibility it has to improve societies′ quality of life, to support poverty reduction and sustainable development. Renewable energy, and mainly the energy generated by large hydropower generation projects that supply most of the renewable energy consumed by developing countries, requires many technical, legal, financial and social complex processes sustained by innovations and valuable knowledge. Besides these efforts, renewable energy requires a solid infrastructure to generate and distribute the energy resources needed to solve the basic needs of society. This demands a proper construction performance to deliver the energy projects planned according to specifications and respecting environmental and social concerns, which implies the observance of sustainable construction guidelines. But construction projects are complex and demanding and frequently face time and cost overruns that may cause negative impacts on the initial planning and thus on society. The renewable energy issue and the large renewable energy power generation and distribution projects are particularly significant for developing countries and for Latin America in particular, as this region concentrates an important hydropower potential and installed capacity. Using as references the performance of Venezuelan large hydropower generation projects and the Guri dam construction, this research evaluates the tight relationship existing between sustainable construction and knowledge management and their impact to achieve sustainability goals. The knowledge management processes are proposed as a basic strategy to allow learning from successes and failures obtained in previous projects and transform the enhancement opportunites into actions to improve the performance of the renewable energy power generation and distribution projects.
Resumo:
Rehabilitation of two bridges in construction in the motorway M-410 in Madrid (Spain)
Resumo:
La comparación de las diferentes ofertas presentadas en la licitación de un proyecto,con el sistema de contratación tradicional de medición abierta y precio unitario cerrado, requiere herramientas de análisis que sean capaces de discriminar propuestas que teniendo un importe global parecido pueden presentar un impacto económico muy diferente durante la ejecución. Una de las situaciones que no se detecta fácilmente con los métodos tradicionales es el comportamiento del coste real frente a las variaciones de las cantidades realmente ejecutadas en obra respecto de las estimadas en el proyecto. Este texto propone abordar esta situación mediante un sistema de análisis cuantitativo del riesgo como el método de Montecarlo. Este procedimiento, como es sabido, consiste en permitir que los datos de entrada que definen el problema varíen unas funciones de probabilidad definidas, generar un gran número de casos de prueba y tratar los resultados estadísticamente para obtener los valores finales más probables,con los parámetros necesarios para medir la fiabilidad de la estimación. Se presenta un modelo para la comparación de ofertas, desarrollado de manera que puede aplicarse en casos reales aplicando a los datos conocidos unas condiciones de variación que sean fáciles de establecer por los profesionales que realizan estas tareas. ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. One situation not easily detected by traditional methods is the reaction of the actual cost to the changes in the exact quantity of works finally executed respect of the work estimated in the project. This paper intends to address this situation through the Monte Carlo method, a system of quantitative risk analysis. This procedure, as is known, is allows the input data defining the problem to vary some within well defined probability functions, generating a large number of test cases, the results being statistically treated to obtain the most probable final values, with the rest of the parameters needed to measure the reliability of the estimate. We present a model for the comparison of bids, designed in a way that it can be applied in real cases, based on data and assumptions that are easy to understand and set up by professionals who wish to perform these tasks.
Resumo:
This theoretical study analyzes the relation between the measures necessesary for the energy retrofitting of a residential building constructed in Madrid, their cost and the improvement of the energy rating of the dwellings. The aim of this work is to establish an evaluation methodology that allows developers and architects to obtain conclusions and orientates therm in the decisioin-making process. It will allow finding the most suitable cost-effective solutions in each case. This paper describes the methodology and the findings obtained. Energy retrofitting and the improvement of the energy behaviour of the building depend on the selection of the retrofitting solutions and also on the investment. In this case study to achieve the best energy rates it is necessary to improve the thermal performance of the envelope as well as the energy systems. Energy retrofitting means an increase in property value but it can't only be considered in economic terms. It is necessary to take into account unquantifiable aspects as increased comfort, improved sound insulation, livability, health, or the elimination of energy poverty situations.
Resumo:
Diseño conceptual de puentes de alta velocidad ferroviarios. Railroad bridges, in general, and those for high speed railways, in particular, demand very special conditions. The traffic loads are much higher than for road bridges. Loads due to braking and acceleration determine, due to their magnitude, the structural layout. Because of the speed of the vehicles there are specific dynamic effects which need to be considered. In order to ensure passenger comfort, compatible with speeds of up to 350 km/h, it is necessary to meet very demanding conditions with respect to stiffness, displacements and dynamic behavior. In this paper these conditions are briefly described and different typological possibilities to satisfy them are presented as well as the main construction methods applicable to this kind of bridges.
Resumo:
The yawing moment acting on the box-girder deck of reinforced concrete bridges constructed using the balanced cantilever method during the erection stage has been experimentally analyzed by testing different types of bridge cross-sections. Experimental results show that the yawing moment coefficient decreases as the bridge decks become streamlined, and that the yawing moment coefficient reaches a maximum when the bridge deck length is nearly twice the deck width.
Resumo:
Within the last century the interest in wind-induced loads over civil engineering structures has become more and more important, the reason being that the development of new construction techniques and materials has allowed engineers and architects to design new structures far from the traditional concepts, and in many cases wind actions over these singular structures are not included in the existing codes of practice. In this paper the windinduced static loads over bridges constructed by the double cantilever method during erection stages are considered. The aerodynamic load over a double cantilever bridge under a yawing-angled wind produces a yawing (torsional) moment on the bridge deck, which can lead to undesirable rotation of the deck about the supporting pier. The effects of the wind yaw angle and the length of the deck are analysed. The wind action caused by the presence of sliding concrete forms at the ends of the deck is also studied.
Resumo:
Building-integrated Photovoltaics (BIPV) is one of the most promising technologies enabling buildings to generate on-site part of their electricity needs while performing architectural functionalities. A clear example of BIPV products consists of semi-transparent photovoltaic modules (STPV), designed to replace the conventional glazing solutions in building façades. Accordingly, the active building envelope is required to perform multiple requirements such as provide solar shading to avoid overheating, supply solar gains and thermal insulation to reduce heat loads and improve daylight utilization. To date, various studies into STPV systems have focused on their energy performance based on existing simulation programs, or on the modelling, normally validated by limited experimental data, of the STPV modules thermal behaviour. Taking into account that very limited experimental research has been conducted on the energy performance of STPV elements and that the characterization in real operation conditions is necessary to promote an energetically efficient integration of this technology in the building envelope, an outdoor testing facility has been designed, developed and built at the Solar Energy Institute of the Technical University of Madrid. In this work, the methodology used in the definition of the testing facility, its capability and limitations are presented and discussed.
Resumo:
The main objective of this research is to study the feasibility of recycling fibres from construction and demolition waste (C&DW) as an alternative material to chopped glass fibres which are used today as reinforcing elements in the prefabricated plaster. To do this, sets of samples are made with rockwool and different percentages of combinations between water / plaster. These series are repeated by changing the additive E glass fibre length of 25mm to make a comparative analysis with respect to the series infused with rockwool.
Resumo:
The use of mineral wool is becoming more widespread due to increased acoustic and thermal demands of Spanish Technical Building Code. This increase affects both in rehabilitation and new construction projects. Therefore, waste generation of this type of insulating material is having more importance. The main objective of this research is to study the possibility of recycling fiber obtained from mineral wool of the C&DW as an alternative material to chopped glass fibers that are currently used as reinforcing elements in the prefabricated plaster. To achieve this objective, series are made of plaster E-35 additived with rock wool residue and glass wool residue at different rates of addition. These series are repeated by changing the additive by E fiberglass (length of 25mm) to make a comparative analysis with respect to the series additived with mineral wool waste. All the series are subjected to the test to determine Shore C surface hardness and mechanical testing to determine the compressive and flexural strength. From the results it can be concluded that: with rock wool residue, increases Shore C hardness up to 15% with respect to the glass fiber and 9% with respect to the glass wool, with a percentage of addition 2%. With rock wool residue, weight is decreased by 5% with respect to the glass fiber and 4% with respect to the glass wool waste, with an addition percentage of 4%. For an addition rate of 4%, results in the flexural strength test with fiberglass are 85% higher than those obtained with glass wool residue. However, for a percentage of 1% addition, the results obtained with glass wool residue are 35% higher than those obtained with fiberglass. For an addition rate of 3% results in the compressive strength test with fiberglass are 54% lower than those obtained with rock wool waste and 70% lower than those obtained with glass wool waste. Comparing the two mineral wools, it can be concluded that up to 3% of the addition, the glass wool series results obtained are 10% higher than those additived with rock wool. However, higher percentages of addition show that the results obtained with rock wool are 35% higher than those obtained with glass wool. The general conclusion is that the series additived with mineral wool from C&DW show better results in tests than the ones used nowadays as plaster reinforcement.
Resumo:
The difficulty of dealing with construction and demolition waste (CDW) on construction sites is not new and continues to be a significant environmental problem. Currently the CDW collection system in Spain is done in a decentralized manner by each sub-contracted company, being necessary to implement effective waste management measures ensuring a correct management and minimization. During the last years several measures have been launched in order to improve and encourage the reuse and recycling of CDW. A widespread solution for CDW recovery is using them as a landscaping aggregate or for road bases and sub-bases. However, measures encouraging onsite prevention still need to be enhanced. This paper studies the major work stage generating CDW and analyses the categories of CDW produced during its execution. For this, several real building sites have been analysed in order to quantify the estimation of CDW generated. Results of this study show that a significant contributor to the CDW generation on building construction sites in Spain are the masonry works. Finally, a Best Practices Manual (BPM) is proposed containing several strategies on masonry works aimed not only at CDW prevention, but also at improving their management and minimization. The use of this BPM together with the Study and Plan of CDW management --required by law--, promotes the environmental management of the company, favouring the cohesion of the construction process organization at all stages giving rise to establishing responsibilities in the field of waste and providing a greater control over the process. Keywords: construction and demolition waste, management, masonry works, good practice measures, prevention.