915 resultados para Building Information Model


Relevância:

80.00% 80.00%

Publicador:

Resumo:

The construction industry is characterised by fragmentation and suffers from lack of collaboration, often adopting adversarial working practices to achieve deliverables. For the UK Government and construction industry, BIM is a game changer aiming to rectify this fragmentation and promote collaboration. However it has become clear that there is an essential need to have better controls and definitions of both data deliverables and data classification. Traditional methods and techniques for collating and inputting data have shown to be time consuming and provide little to improve or add value to the overall task of improving deliverables. Hence arose the need in the industry to develop a Digital Plan of Work (DPoW) toolkit that would aid the decision making process, providing the required control over the project workflows and data deliverables, and enabling better collaboration through transparency of need and delivery. The specification for the existing Digital Plan of Work (DPoW) was to be, an industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle, with the addition of a structured and standardised information classification system. However surveys and interviews conducted within this research indicate that the current DPoW resembles a digitised version of the pre-existing plans of work and does not push towards the data enriched decision-making abilities that advancements in technology now offer. A Digital Framework is not simply the digitisation of current or historic standard methods and procedures, it is a new intelligent driven digital system that uses new tools, processes, procedures and work flows to eradicate waste and increase efficiency. In addition to reporting on conducted surveys above, this research paper will present a theoretical investigation into usage of Intelligent Decision Support Systems within a digital plan of work framework. Furthermore this paper will present findings on the suitability to utilise advancements in intelligent decision-making system frameworks and Artificial Intelligence for a UK BIM Framework. This should form the foundations of decision-making for projects implemented at BIM level 2. The gap identified in this paper is that the current digital toolkit does not incorporate the intelligent characteristics available in other industries through advancements in technology and collation of vast amounts of data that a digital plan of work framework could have access to and begin to develop, learn and adapt for decision-making through the live interaction of project stakeholders.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

PAS1192-2 (2013) outlines the “fundamental principles of Level 2 information modeling”, one of these principles is the use of what is commonly referred to as a Common Data Environment (CDE). A CDE could be described as an internet-enabled cloudhosting platform, accessible to all construction team members to access shared project information. For the construction sector to achieve increased productivity goals, the next generation of industry professionals will need to be educated in a way that provides them with an appreciation of Building Information Modelling (BIM) working methods, at all levels, including an understanding of how data in a CDE should be structured, managed, shared and published. This presents a challenge for educational institutions in terms of providing a CDE that addresses the requirements set out in PAS1192-2, and mirrors organisational and professional working practices without causing confusion due to over complexity. This paper presents the findings of a two-year study undertaken at Ulster University comparing the use of a leading industry CDE platform with one derived from the in-house Virtual Learning Environment (VLE), for the delivery of a student BIM project. The research methodology employed was a qualitative case study analysis, focusing on observations from the academics involved and feedback from students. The results of the study show advantages for both CDE platforms depending on the learning outcomes required.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The representation of the thermal behaviour of the building is achieved through a relatively simple dynamic model that takes into account the effects due to the thermal mass of the building components. The model of a intra-floor apartment has been built in the Matlab-Simulink environment and considers the heat transmission through the external envelope, wall and windows, the internal thermal masses, (i.e. furniture, internal wall and floor slabs) and the sun gain due to opaque and see-through surfaces of the external envelope. The simulations results for the entire year have been compared and the model validated, with the one obtained with the dynamic building simulation software Energyplus.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

We report first principles density functional calculations for 5,6-dihydroxyindole-2-carboxylic acid (DHICA) and several oxidised forms. DHICA and 5,6-dihydroxyindole (DHI) are believed to be the basic building blocks of the eumelanins. Our results show that carboxylation has a significant effect on the physical properties of the molecules. In particular, the relative stabilities and the highest occupied molecular orbital-lowest unoccupied molecular orbital gaps (calculated with the DeltaSCF method) of the various redox forms are strongly affected. We predict that, in contrast to DHI, the density of unpaired electrons, and hence the ESR signal, in DHICA is negligibly small. (C) 2004 Elsevier B.V. All rights reserved.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Streaming video application requires high security as well as high computational performance. In video encryption, traditional selective algorithms have been used to partially encrypt the relatively important data in order to satisfy the streaming performance requirement. Most video selective encryption algorithms are inherited from still image encryption algorithms, the encryption on motion vector data is not considered. The assumption is that motion vector data are not as important as pixel image data. Unfortunately, in some cases, motion vector itself may be sufficient enough to leak out useful video information. Normally motion vector data consume over half of the whole video stream bandwidth, neglecting their security may be unwise. In this paper, we target this security problem and illustrate attacks at two different levels that can restore useful video information using motion vectors only. Further, an information analysis is made and a motion vector information model is built. Based on this model, we describe a new motion vector encryption algorithm called MVEA. We show the experimental results of MVEA. The security strength and performance of the algorithm are also evaluated.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper reports on the development of elements of an e-supply chain management system for managing maintenance, repair and overhaul (MRO) relationships in the aerospace industry. A standard systems development methodology has been followed to produce a process model (i.e. the AMSCR model); an information model (i.e. business rules) and a computerised information management capability (i.e. automated optimisation). The proof of concept for this web-based MRO supply chain system has been established through the collaboration with a sample of the different types of supply chain members. The proven benefit is a reduction in the stock-holding costs for the whole supply chain whilst also minimising non-flying time of the aircraft that the supply chain supports. This type of system is now vital in an industry that has continuously decreasing profit margins, which in turn means pressure to reduce servicing times and increase the interval between maintenance actions.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose - To develop a systems strategy for supply chain management in aerospace maintenance, repair and overhaul (MRO). Design/methodology/approach - A standard systems development methodology has been followed to produce a process model (i.e. the AMSCR model); an information model (i.e. business rules) and a computerised information management capability (i.e. automated optimisation). Findings - The proof of concept for this web-based MRO supply chain system has been established through collaboration with a sample of the different types of supply chain members. The proven benefits comprise new potential to minimise the stock holding costs of the whole supply chain whilst also minimising non-flying time of the aircraft that the supply chain supports. Research limitations/implications - The scale of change needed to successfully model and automate the supply chain is vast. This research is a limited-scale experiment intended to show the power of process analysis and automation, coupled with strategic use of management science techniques, to derive tangible business benefit. Practical implications - This type of system is now vital in an industry that has continuously decreasing profit margins; which in turn means pressure to reduce servicing times and increase the mean time between them. Originality/value - Original work has been conducted at several levels: process, information and automation. The proof-of-concept system has been applied to an aircraft MRO supply chain. This is an area of research that has been neglected, and as a result is not well served by current systems solutions. © Emerald Group Publishing Limited.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis examines the effect of rights issue announcements on stock prices by companies listed on the Kuala Lumpur Stock Exchange (KLSE) between 1987 to 1996. The emphasis is to report whether the KLSE is semi strongly efficient with respect to the announcement of rights issues and to check whether the implications of corporate finance theories on the effect of an event can be supported in the context of an emerging market. Once the effect is established, potential determinants of abnormal returns identified by previous empirical work and corporate financial theory are analysed. By examining 70 companies making clean rights issue announcements, this thesis will hopefully shed light on some important issues in long term corporate financing. Event study analysis is used to check on the efficiency of the Malaysian stock market; while cross-sectional regression analysis is executed to identify possible explanators of the rights issue announcements' effect. To ensure the results presented are not contaminated, econometric and statistical issues raised in both analyses have been taken into account. Given the small amount of empirical research conducted in this part of the world, the results of this study will hopefully be of use to investors, security analysts, corporate financial managements, regulators and policy makers as well as those who are interested in capital market based research of an emerging market. It is found that the Malaysian stock market is not semi strongly efficient since there exists a persistent non-zero abnormal return. This finding is not consistent with the hypothesis that security returns adjust rapidly to reflect new information. It may be possible that the result is influenced by the sample, consisting mainly of below average size companies which tend to be thinly traded. Nevertheless, these issues have been addressed. Another important issue which has emerged from the study is that there is some evidence to suggest that insider trading activity existed in this market. In addition to these findings, when the rights issue announcements' effect is compared to the implications of corporate finance theories in predicting the sign of abnormal returns, the signalling model, asymmetric information model, perfect substitution hypothesis and Scholes' information hypothesis cannot be supported.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Data quality is a difficult notion to define precisely, and different communities have different views and understandings of the subject. This causes confusion, a lack of harmonization of data across communities and omission of vital quality information. For some existing data infrastructures, data quality standards cannot address the problem adequately and cannot full all user needs or cover all concepts of data quality. In this paper we discuss some philosophical issues on data quality. We identify actual user needs on data quality, review existing standards and specification on data quality, and propose an integrated model for data quality in the eld of Earth observation. We also propose a practical mechanism for applying the integrated quality information model to large number of datasets through metadata inheritance. While our data quality management approach is in the domain of Earth observation, we believe the ideas and methodologies for data quality management can be applied to wider domains and disciplines to facilitate quality-enabled scientific research.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Construction customers are persistently seeking to achieve sustainability and maximize value as sustainability has become a major consideration in the construction industry. In particular, it is essential to refurbish a whole house to achieve the sustainability agenda of 80% CO2 reduction by 2050 as the housing sector accounts for 28% of the total UK CO2 emission. However, whole house refurbishment seems to be challenging due to the highly fragmented nature of construction practice, which makes the integration of diverse information throughout the project lifecycle difficult. Consequently, Building Information Modeling (BIM) is becoming increasingly difficult to ignore in order to manage construction projects in a collaborative manner, although the current uptake of the housing sector is low at 25%. This research aims to investigate homeowners’ decision making factors for housing refurbishment projects and to provide a valuable dataset as an essential input to BIM for such projects. One-hundred and twelve homeowners and 39 construction professionals involved in UK housing refurbishment were surveyed. It was revealed that homeowners value initial cost more while construction professionals value thermal performance. The results supported that homeowners and professionals both considered the first priority to be roof refurbishment. This research revealed that BIM requires a proper BIM dataset and objects for housing refurbishment.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The written text, and approaches to reading it, serves well as an analogy for the classroom space as a "text" that teachers are able to compose; and students are able to read, interpret meaning(s) of, and make responses to and about (Rosenblatt, 1988). Researchers point to ways in which the classroom can be conceptualized as a text to be evoked, experienced, and read (Freire & Macedo, 1987; Powell, 2009; Rosenblatt, 1988; Spears-Bunton & Powell, 2009).^ The present study analyzed secondary data including: 10 transcripts of teacher talks and six self-reports retrieved from the program evaluation archives of DOR Foundation. The data described six teachers' classroom experiences subsequent to professional development centered on Goma character education curriculum that was used during a summer youth program located in South Georgia. Goma, an acronym that stands for Goal, Objective, Method, and Attitude, is a character education paradigm derived from The Inclusive Community Building Ellison Model, the theoretical framework used for this study. The Model identifies conflict resolution as one of its five foci (Hunt, Howard, & Rice, 1998). Hunt (2006) conceived Goma as part of a 7-Step unitary process, also named the 7-Step pathway, to demonstrate how conflict resolution is accomplished within a variety of contexts.^ Analysis of the data involved: (a) a priori coding of teacher talks transcripts using the components of the Goma 7-Step pathway as coding categories, (b) emergent coding of teacher talks transcripts for the types of experiences teachers evidenced, and (c) emergent coding of teachers' self-reports for categories of teachers' instructional activities. Results of the study showed positive influence of Goma curriculum on participating teachers and their instructional practices. Teachers were shown to have had cognitive, instructional, emotional, and social experiences that were most evident when they reported changes in their attitudes toward their students, themselves, and their instructional practices. The present study provided implications for classroom teachers wherein all aspects of teachers' instructional practices can be guided by principles of positive character; and can be used to help compose the kinds of "texts" that may likely contribute to a classroom character culture.^

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The integration between architectural design and structur al systems consi sts, in academic education, one of the main challenges to the architectural design education . Recent studies point to the relevance of the use of computational tools in academic settings as an important strategy for such integration. Although in recent yea rs teaching experience using BIM (BuildingInformationModeling) may be incorporated by the a rchitecture schools , notes the need for further didactic and pedagogical practices that promote the architectural design and structur al integration teaching. This pa per analyzes experiences developed within the UFRN and UFPB, seeking to identify tools, processes and products used, pointing limitations and potentials in subjects taught in these institutions. The research begins with a literature review on teaching BIM and related aspects to the integration of architectural design and stru c tur e . It has been used as data collection techniques in studio the direct observation, the use of questionnaires and interviews with students and teachers, and mixed method, qualitativ e and quantitative analysis . In UFRN, the scope of the Integrated Workshop as a compulsory subject in the curriculum, favors the integration of disciplines studied here as it allows teachers from different disciplines at the same project studio . Regarding the use of BIM form initial users, BIM modelers, able to extract quantitative and automatically speed up production, gaining in quality in the products, however learn the tool and design in parallel cause some difficulties. UFPB, lack of required courses o n BIM, generates lack of knowledge and confidence in using the tool and processes, by most students. Thus we see the need for greater efforts by school to adopt BIM skills and training. There is a greater need for both BIM concept, in order to promote BIM process and consequent better use of tools, and obsolete avoiding impairment of technology, merely a tool. It is considered the inclusion of specific subjects with more advanced BIM skills, through partnerships with engineering degrees and the promotion of trans disciplinary integration favoring the exchange of different cultures from the academic environment.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Lo scopo di questo studio è la comprensione della dinamica dello strato limite urbano per città dell’Emilia Romagna tramite simulazioni numeriche. In particolare, l’attenzione è posta sull’ effetto isola di calore, ovvero sulla differenza di temperatura dell’aria in prossimità del suolo fra zone rurali e urbane dovuta all’urbanizzazione. Le simulazioni sono state effettuate con il modello alla mesoscala "Weather Research and Forecasting" (WRF), accoppiato con le parametrizzazioni urbane "Building Effect Parametrization" (BEP) e "Building Energy Model" (BEM), che agiscono a vari livelli verticali urbani. Il periodo di studio riguarda sei giorni caldi e senza copertura nuvolosa durante un periodo di heat wave dell’anno 2015. La copertura urbana è stata definita con il "World Urban Databes and Access Portal Tools" (WUDAPT), un metodo che permette di classificare le aree urbane in dieci "urban climate zones" (UCZ), attraverso l’uso combinato di immagini satellitari e "training areas" manualmente definite con il software Google Earth. Sono state svolte diverse simulazioni a domini innestati, con risoluzione per il dominio più piccolo di 500 m, centrato sulla città di Bologna. Le differenze fra le simulazioni riguardano la presenza o l’assenza delle strutture urbane, il metodo di innesto e tipo di vegetazione rurale. Inoltre, è stato valutato l’effetto dovuto alla presenza di pannelli fotovoltaici sopra i tetti di ogni edificio e le variazioni che i pannelli esercitano sullo strato limite urbano. Per verificare la bontà del modello, i dati provenienti dalle simulazioni sono stati confrontati con misure provenienti da 41 stazioni all’interno dell’area di studio. Le variabili confrontate sono: temperatura, umidità relativa, velocità e direzione del vento. Le simulazioni sono in accordo con i dati osservativi e riescono a riprodurre l’effetto isola di calore: la differenza di temperatura fra città e zone rurali circostanti è nulla durante il giorno; al contrario, durante la notte l’isola di calore è presente, e in media raggiunge il massimo valore di 4°C alle 1:00. La presenza dei pannelli fotovoltaici abbassa la temperatura a 2 metri dell’aria al massimo di 0.8°C durante la notte, e l’altezza dello strato limite urbano dell’ordine 200mrispetto al caso senza pannelli. I risultati mostrano come l’uso di pannelli fotovoltaici all’interno del contesto urbano ha molteplici benefici: infatti, i pannelli fotovoltaici riescono a ridurre la temperatura durante un periodo di heat wave, e allo stesso tempo possono parzialmente sopperire all’alto consumo energetico, con una conseguente riduzione del consumo di combustibili fossili.