820 resultados para BPM lifecycle
Resumo:
Technologies and languages for integrated processes are a relatively recent innovation. Over that period many divergent waves of innovation have transformed process integration. Like sockets and distributed objects, early workflow systems ordered programming interfaces that connected the process modelling layer to any middleware. BPM systems emerged later, connecting the modelling world to middleware through components. While BPM systems increased ease of use (modelling convenience), long-standing and complex interactions involving many process instances remained di±cult to model. Enterprise Service Buses (ESBs), followed, connecting process models to heterogeneous forms of middleware. ESBs, however, generally forced modellers to choose a particular underlying middleware and to stick to it, despite their ability to connect with many forms of middleware. Furthermore ESBs encourage process integrations to be modelled on their own, logically separate from the process model. This can lead to the inability to reason about long standing conversations at the process layer. Technologies and languages for process integration generally lack formality. This has led to arbitrariness in the underlying language building blocks. Conceptual holes exist in a range of technologies and languages for process integration and this can lead to customer dissatisfaction and failure to bring integration projects to reach their potential. Standards for process integration share similar fundamental flaws to languages and technologies. Standards are also in direct competition with other standards causing a lack of clarity. Thus the area of greatest risk in a BPM project remains process integration, despite major advancements in the technology base. This research examines some fundamental aspects of communication middleware and how these fundamental building blocks of integration can be brought to the process modelling layer in a technology agnostic manner. This way process modelling can be conceptually complete without becoming stuck in a particular middleware technology. Coloured Petri nets are used to define a formal semantics for the fundamental aspects of communication middleware. They provide the means to define and model the dynamic aspects of various integration middleware. Process integration patterns are used as a tool to codify common problems to be solved. Object Role Modelling is a formal modelling technique that was used to define the syntax of a proposed process integration language. This thesis provides several contributions to the field of process integration. It proposes a framework defining the key notions of integration middleware. This framework provides a conceptual foundation upon which a process integration language could be built. The thesis defines an architecture that allows various forms of middleware to be aggregated and reasoned about at the process layer. This thesis provides a comprehensive set of process integration patterns. These constitute a benchmark for the kinds of problems a process integration language must support. The thesis proposes a process integration modelling language and a partial implementation that is able to enact the language. A process integration pilot project in a German hospital is brie°y described at the end of the thesis. The pilot is based on ideas in this thesis.
Resumo:
The development of highway infrastructure typically requires major capital input over a long period. This often causes serious financial constraints for investors. The push for sustainability has added new dimensions to the complexity in the evaluation of highway projects, particularly on the cost front. This makes the determination of long-term viability even more a precarious exercise. Life-cycle costing analysis (LCCA) is generally recognised as a valuable tool for the assessment of financial decisions on construction works. However to date, existing LCCA models are deficient in dealing with sustainability factors, particularly for infrastructure projects due to their inherent focus on the economic issues alone. This research probed into the major challenges of implementing sustainability in highway infrastructure development in terms of financial concerns and obligations. Using results of research through literature review, questionnaire survey of industry stakeholders and semi-structured interview of senior practitioners involved in highway infrastructure development, the research identified the relative importance of cost components relating to sustainability measures and on such basis, developed ways of improving existing LCCA models to incorporate sustainability commitments into long-term financial management. On such a platform, a decision support model incorporated Fuzzy Analytical Hierarchy Process and LCCA for the evaluation of the specific cost components most concerned by infrastructure stakeholders. Two real highway infrastructure projects in Australia were then used for testing, application and validation, before the decision support model was finalised. Improved industry understanding and tools such as the developed model will lead to positive sustainability deliverables while ensuring financial viability over the lifecycle of highway infrastructure projects.
Resumo:
Process modeling is an important design practice in organizational improvement projects. In this paper, we examine the design of business process diagrams in contexts where novice analysts only have basic design tools such as paper and pencils available, and little to no understanding of formalized modeling approaches. Based on a quasi-experimental study with 89 BPM students, we identify five distinct process design archetypes ranging from textual to hybrid and graphical representation forms. We examine the quality of the designs and identify which representation formats enable an analyst to articulate business rules, states, events, activities, temporal and geospatial information in a process model. We found that the quality of the process designs decreases with the increased use of graphics and that hybrid designs featuring appropriate text labels and abstract graphical forms appear well-suited to describe business processes. We further examine how process design preferences predict formalized process modeling ability. Our research has implications for practical process design work in industry as well as for academic curricula on process design.
Resumo:
What I want to do in this Column, is to paint a picture of the current BPM education portfolios that are offered globally by universities active in the BPM space. To do so, I will draw on work I was involved in that reviewed the BPM teaching capacities of five universities in the United States, Europe, Africa and Australia. My ambition is to complement the listings in the BPTrends Academic Program with a more comprehensive and in-depth discussion of a selected set of universities. Let us explore how BPM capability development is implemented and offered in different universities around the globe.
Resumo:
Preservation and enhancement of transportation infrastructure is critical to continuous economic development in Australia. Of particular importance are the road assets infrastructure, due to their high costs of setting up and their social and economic impact on the national economy. Continuous availability of road assets, however, is contingent upon their effective design, condition monitoring, maintenance, and renovation and upgrading. However, in order to achieve this data exchange, integration, and interoperability is required across municipal boundaries. On the other hand, there are no agreed reference frameworks that consistently describe road infrastructure assets. As a consequence, specifications and technical solutions being chosen to manage road assets do not provide adequate detail and quality of information to support asset lifecycle management processes and decisions taken are based on perception not reality. This paper presents a road asset information model, which works as reference framework to, link other kinds of information with asset information; integrate different data suppliers; and provide a foundation for service driven integrated information framework for community infrastructure and asset management.
Resumo:
With the large diffusion of Business Process Managemen (BPM) automation suites, the possibility of managing process-related risks arises. This paper introduces an innovative framework for process-related risk management and describes a working implementation realized by extending the YAWL system. The framework covers three aspects of risk management: risk monitoring, risk prevention, and risk mitigation. Risk monitoring functionality is provided using a sensor-based architecture, where sensors are defined at design time and used at run-time for monitoring purposes. Risk prevention functionality is provided in the form of suggestions about what should be executed, by who, and how, through the use of decision trees. Finally, risk mitigation functionality is provided as a sequence of remedial actions (e.g. reallocating, skipping, rolling back of a work item) that should be executed to restore the process to a normal situation.
Resumo:
Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.
Resumo:
The next generation of SOA needs to scale for flexible service consumption, beyond organizational boundaries and current B2B applications, into communities, eco-systems, and business networks. In the wider and, ultimately, global settings, new capabilities are needed so that business partners can efficiently and reliably enable, adapt, and expose services where they can be discovered, ordered, consumed, metered, and paid for, through new applications and opportunities, driven by third parties in the global "village". This trend is already underway, in different ways, through various early adopter market segments. For the small medium enterprises segment, Google, Intuit-Microsoft, and others have launched appstores, through which an open-ended array of hosted applications are sourced from the development community and procured as maketplace commondities. In the corporate sector, the marketplace model and business network hubs are being put in place on top of connectivity and network orchestration investments for capitalizing services as tradable assets, seen in banking/finance (e.g. American Express Intelligent Marketplace), logistics (e.g., the E2open hub), and the public sector (e.g., UK DirectGov whole-of-government citizen services delivery).
Resumo:
The emergence of semantic technologies to deal with the underlying meaning of things, instead of a purely syntactical representation, has led to new developments in various fields, including business process modeling. Inspired by artificial intelligence research, technologies for semantic Web services have been proposed and extended to process modeling. However, the applicablility of semantic Web services for semantic business processes is limited because business processes encompass wider requirements of business than Web services. In particular, processes are concerned with the composition of tasks, that is, in which order activities are carried out, regardless of their implementation details; resources assigned to carry out tasks, such as machinery, people, and goods; data exchange; and security and compliance concerns.
Resumo:
All processes are modeled, all process metrics defined, all process support systems are set up; yet still, processes are not running smoothly and departmental silos are more present than ever. Both practitioners and academics tell the same story. A successful business process management (BPM) implementation goes beyond using the right methods and putting the right systems in place. In fact, an important success factor for BPM is establishing the right organizational culture, that is, a culture that supports the achievement and maintenance of efficient and effective business processes.
Resumo:
Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.
Resumo:
In the field of process mining, the use of event logs for the purpose of root cause analysis is increasingly studied. In such an analysis, the availability of attributes/features that may explain the root cause of some phenomena is crucial. Currently, the process of obtaining these attributes from raw event logs is performed more or less on a case-by-case basis: there is still a lack of generalized systematic approach that captures this process. This paper proposes a systematic approach to enrich and transform event logs in order to obtain the required attributes for root cause analysis using classical data mining techniques, the classification techniques. This approach is formalized and its applicability has been validated using both self-generated and publicly-available logs.
Resumo:
Many corporations and individuals realize that environmental sustainability is an urgent problem to address. In this chapter, we contribute to the emerging academic discussion by proposing two innovative approaches for engaging in the development of environmentally sustainable business processes. Specifically, we describe an extended process modeling approach for capturing and documenting the dioxide emissions produced during the execution of a business process. For illustration, we apply this approach to the case of a government Shared Service provider. Second, we then introduce an analysis method for measuring the carbon dioxide emissions produced during the execution of a business process. To illustrate this approach, we apply it in the real-life case of a European airport and show how this information can be leveraged in the re-design of "green" business processes.
Resumo:
Companies face the challenges of expanding their markets, improving products, services and processes, and exploiting intellectual capital in a dynamic network. Therefore, more companies are turning to an Enterprise System (ES). Knowledge management (KM) has also received considerable attention and is continuously gaining the interest of industry, enterprises, and academia. For ES, KM can provide support across the entire lifecycle, from selection and implementation to use. In addition, it is also recognised that an ontology is an appropriate methodology to accomplish a common consensus of communication, as well as to support a diversity of KM activities, such as knowledge repository, retrieval, sharing, and dissemination. This paper examines the role of ontology-based KM for ES (OKES) and investigates the possible integration of ontology-based KM and ES. The authors develop a taxonomy as a framework for understanding OKES research. In order to achieve the objective of this study, a systematic review of existing research was conducted. Based on a theoretical framework of the ES lifecycle, KM, KM for ES, ontology, and ontology-based KM, guided by the framework of study, a taxonomy for OKES is established.
Resumo:
Public road authorities have a key responsibility in driving initiatives for reducing greenhouse gas (GHG) emissions in the road construction project lifecycle. A coherent and efficient chain of procurement processes and methods is needed to convert green policies into tangible actions that capture the potential for GHG reduction. Yet, many infrastructure clients lack developed methodologies regarding green procurement practices. Designing more efficient solutions for green procurement requires an evaluation of the current initiatives and stages of development. A mapping of the current GHG reduction initiatives in Australian public road procurement is presented in this paper. The study includes the five largest Australian state road authorities, which cover 94% of the total 817,089 km of Australian main roads (not local) and account for 96% of the total A$13 billion annual major road construction and maintenance expenditure. The state road authorities’ green procurement processes and tools are evaluated based on interviews and a review of documents. Altogether 12 people, comprising 1-3 people of each organisation, participated in the interviews and provided documents. An evaluation matrix was developed for mapping the findings across the lifecycle of road construction project delivery. The results show how Australian state road authorities drive decisions with an impact on GHG emissions on the strategic planning phase, project development phase, and project implementation phase. The road authorities demonstrate varying levels of advancement in their green procurement methodologies. Six major gaps in the current green procurement processes are identified and, respectively, six recommendations for future research and development are suggested. The greatest gaps remain in the project development phase, which has a critical role in fixing the project (GHG reduction) goals, identifying risks and opportunities, and selecting the contractor to deliver the project. Specifically, the role of mass-haul optimisation as a part of GHG minimisation was reviewed, and mass-haul management was found to be an underutilised element with GHG reduction potential.