1000 resultados para 660199 Energy transformation not elsewhere classified
Resumo:
Undertaking a Cochrane systematic review can be an incredibly rewarding experience. It is however a challenging and time-consuming task. The Cochrane Handbook for Systematic Reviews of Interventions1 provides an essential resource to help reviewers navigate the often complex methodological issues of systematic review research. Additional guidelines have been developed for those undertaking reviews of public health topics,2 and Cochrane Centres throughout the world offer invaluable training opportunities. This emphasis on training and methodological rigour has helped Cochrane reviews become one of the most respected sources of synthesized research available. Even with the assistance available, however, many authors with good intentions register titles and prepare protocols but fail to publish the completed review. Data extracted from Cochrane’s Information Management System (Archie) in June 2010 showed that there were 1,301 titles registered more than two years ago that have not been published as a full review.3 Of these registered titles, 697 have had protocols published (25 are no longer active) while 604 have not even progressed to this stage (154 are no longer active). There are also 146 protocols that have been published for more than two years without being converted into completed reviews. These registered titles and protocols that have not yet progressed to a completed review represent a significant amount of time and energy invested by review authors, Cochrane editorial staff and, in some cases, external referees...
The creative citizen : understanding the value of design education programs in the knowledge economy
Resumo:
The knowledge economy relies on the diffusion and use of knowledge as well as its creation (Houghton and Sheenan, 2000). The future success of economic activity will depend on the capacity of organisations to transform by increasing their flexibility. In particular, this transformation is dependant on a decentralised, networked and multi-skilled workforce. To help organisations transition, new strategies and structures for education are required. Education systems need to concentrate less on specialist skills and more on the development of people with broad-based problem solving skills that are adaptable, with social and inter-personal communication skills necessary for networking and communication. This paper presents the findings of a ‘Knowledge Economy Market Development Mapping Study’ conducted to identify the value of design education programs from primary through to tertiary level in Queensland, Australia. The relationship of these programs to the development of the capacities mentioned above is explored. The study includes the collection of qualitative and quantitative data consisting of a literature review, focus groups and survey. Recommendations for the future development of design education programs in Queensland, Australia are proposed, and future research opportunities are presented and discussed.
Resumo:
In May 2011, the Centre for Crime and Justice Studies published Lessons for the Coalition: an end of term report on New Labour and Criminal Justice (Silvestri, 2011). In that collection I described Labour's performance on environmental issues as ‘too little too late’. The UK experienced a period of Blair/Brown environmental governance that demonstrated ‘symbolic success but real failure’. Amongst New Labour's environmental achievements were the establishment of the Climate Change Act 2008, the creation of the Department of Energy and Climate Change and the establishment of numerous green quangos to oversee and implement a range of environmental policies. However, these steps forward were seemingly threatened by the early days of a Cameron-led coalition where austerity measure, trade and the abolition of green quangos were on the cards. In sum, I concluded ‘future UK government report cards on the environment do not look good’ (Walters, 2011). After two and half years of a Conservative/Liberal Democratic coalition, and much rhetoric about it being ‘the greenest government ever’, the interim report card for the Cameron government on environmental matters is grim reading indeed. The demise of green quangos, record carbon emissions, renewable energies policies stultified, environmental criminality and victimisation all but ignored, and billions of pounds lost to environmental corporate fraudsters are just some of the headlines of Tory inspired governance with much environmental rhetoric and no environmental results.
Resumo:
Despite increasingly stringent energy performance regulations for new homes, southeast Queensland has a high and growing penetration of, and reliance on, air conditioners to provide thermal comfort to housing inhabitants. This reliance impacts on electricity infrastructure investment which is the key driving force behind rising electricity prices. This paper reports initial findings of a research project that seeks to better understand three key issues: (i) how families manage their thermal comfort in summer and how well their homes limit overheating; (ii) the extent to which the homes have been constructed according to the building approval documentation; and (iii) the impact that these issues have on urban design, especially in relation to electricity infrastructure in urban developments.
Resumo:
Advanced substation applications, such as synchrophasors and IEC 61850-9-2 sampled value process buses, depend upon highly accurate synchronizing signals for correct operation. The IEEE 1588 Precision Timing Protocol (PTP) is the recommended means of providing precise timing for future substations. This paper presents a quantitative assessment of PTP reliability using Fault Tree Analysis. Two network topologies are proposed that use grandmaster clocks with dual network connections and take advantage of the Best Master Clock Algorithm (BMCA) from IEEE 1588. The cross-connected grandmaster topology doubles reliability, and the addition of a shared third grandmaster gives a nine-fold improvement over duplicated grandmasters. The performance of BMCA mediated handover of the grandmaster role during contingencies in the timing system was evaluated experimentally. The 1 µs performance requirement of sampled values and synchrophasors are met, even during network or GPS antenna outages. Slave clocks are shown to synchronize to the backup grandmaster in response to degraded performance or loss of the main grandmaster. Slave disturbances are less than 350 ns provided the grandmaster reference clocks are not offset from one another. A clear understanding of PTP reliability and the factors that affect availability will encourage the adoption of PTP for substation time synchronization.
Resumo:
The IEEE Subcommittee on the Application of Probability Methods (APM) published the IEEE Reliability Test System (RTS) [1] in 1979. This system provides a consistent and generally acceptable set of data that can be used both in generation capacity and in composite system reliability evaluation [2,3]. The test system provides a basis for the comparison of results obtained by different people using different methods. Prior to its publication, there was no general agreement on either the system or the data that should be used to demonstrate or test various techniques developed to conduct reliability studies. Development of reliability assessment techniques and programs are very dependent on the intent behind the development as the experience of one power utility with their system may be quite different from that of another utility. The development and the utilization of a reliability program are, therefore, greatly influenced by the experience of a utlity and the intent of the system manager, planner and designer conducting the reliability studies. The IEEE-RTS has proved to be extremely valuable in highlighting and comparing the capabilities (or incapabilities) of programs used in reliability studies, the differences in the perception of various power utilities and the differences in the solution techniques. The IEEE-RTS contains a reasonably large power network which can be difficult to use for initial studies in an educational environment.
Resumo:
The IEEE Reliability Test System (RTS) developed by the Application of Probability Method Subcommittee has been used to compare and test a wide range of generating capacity and composite system evaluation techniques and subsequent digital computer programs. A basic reliability test system is presented which has evolved from the reliability education and research programs conducted by the Power System Research Group at the University of Saskatchewan. The basic system data necessary for adequacy evaluation at the generation and composite generation and transmission system levels are presented together with the fundamental data required to conduct reliability-cost/reliability-worth evaluation
Resumo:
A set of basic reliability indices at the generation and composite generation and transmission levels for a small reliability test system are presented. The test system and the results presented have evolved from reliability research and teaching programs. The indices presented are for fundamental reliability applications which should be covered in a power system reliability teaching program. The RBTS test system and the basic indices provide a valuable reference for faculty and students engaged in reliability teaching and research
Resumo:
Knowledge of cable parameters has been well established but a better knowledge of the environment in which the cables are buried lags behind. Research in Queensland University of Technology has been aimed at obtaining and analysing actual daily field values of thermal resistivity and diffusivity of the soil around power cables. On-line monitoring systems have been developed and installed with a data logger system and buried spheres that use an improved technique to measure thermal resistivity and diffusivity over a short period. Results based on long term continuous field data are given. A probabilistic approach is developed to establish the correlation between the measured field thermal resistivity values and rainfall data from weather bureau records. This data from field studies can reduce the risk in cable rating decisions and provide a basis for reliable prediction of “hot spot” of an existing cable circuit
Resumo:
In this paper a combined subtransmission and distribution reliability analysis of SEQEB’s outer suburban network is presented. The reliability analysis was carried out with a commercial software package which evaluates both energy and customer indices. Various reinforcement options were investigated to ascertain the impact they have on the reliability of supply seen by the customers. The customer and energy indices produced by the combined subtransmission and distribution reliability studies contributed to optimise capital expenditure to the most effective areas of the network.
Resumo:
Capacity probability models of generating units are commonly used in many power system reliability studies, at hierarchical level one (HLI). Analytical modelling of a generating system with many units or generating units with many derated states in a system, can result in an extensive number of states in the capacity model. Limitations on available memory and computational time of present computer facilities can pose difficulties for assessment of such systems in many studies. A cluster procedure using the nearest centroid sorting method was used for IEEE-RTS load model. The application proved to be very effective in producing a highly similar model with substantially fewer states. This paper presents an extended application of the clustering method to include capacity probability representation. A series of sensitivity studies are illustrated using IEEE-RTS generating system and load models. The loss of load and energy expectations (LOLE, LOEE), are used as indicators to evaluate the application
Resumo:
The majority of distribution utilities do not have accurate information on the constituents of their loads. This information is very useful in managing and planning the network, adequately and economically. Customer loads are normally categorized in three main sectors: 1) residential; 2) industrial; and 3) commercial. In this paper, penalized least-squares regression and Euclidean distance methods are developed for this application to identify and quantify the makeup of a feeder load with unknown sectors/subsectors. This process is done on a monthly basis to account for seasonal and other load changes. The error between the actual and estimated load profiles are used as a benchmark of accuracy. This approach has shown to be accurate in identifying customer types in unknown load profiles, and is used in cross-validation of the results and initial assumptions.
Resumo:
This paper present an efficient method using system state sampling technique in Monte Carlo simulation for reliability evaluation of multi-area power systems, at Hierarchical Level One (HLI). System state sampling is one of the common methods used in Monte Carlo simulation. The cpu time and memory requirement can be a problem, using this method. Combination of analytical and Monte Carlo method known as Hybrid method, as presented in this paper, can enhance the efficiency of the solution. Incorporation of load model in this study can be utilised either by sampling or enumeration. Both cases are examined in this paper, by application of the methods on Roy Billinton Test System(RBTS).
Resumo:
The reliable operation of the electrical system at Callide Power Station is of extreme importance to the normal everyday running of the Station. This study applied the principles of reliability to do an analysis on the electrical system at Callide Power Station. It was found that the level of expected outage cost increased exponentially with a declining level of maintenance. Concluding that even in a harsh economic electricity market where CS Energy tries and push their plants to the limit, maintenance must not be neglected. A number of system configurations were found to increase the reliability of the system and reduce the expected outage costs. A number of other advantages were identified as a result of using reliability principles to do this study on the Callide electrical system configuration.