829 resultados para 120201 Building Construction Management and Project Planning
Resumo:
Since its popularization in the 1980s, competitiveness has received close attention from practitioners and researchers across a wide range of industries. In the construction sector, many works on competitiveness have also been published. So far, however, there seems to be no comprehensive review to summarize and critique existing research on competitiveness in construction. This research, therefore, reviews the extant literature from four aspects: concept of competitiveness, competitiveness research at the construction industry level, competitiveness research at the firm level, and competitiveness research at the project level. The review presents the state-of-the-art development of competitiveness research in construction, identifies the research gaps, and proposes new directions for further studies. Further research is recommended to validate previous studies in construction practices, identify the mechanisms that encourage mutual enhancement of competitiveness at different levels, and how to achieve its sustainability by embracing new management and/or economics techniques.
Resumo:
The constructivist model of 'soft' value management (VM) is contrasted with the VM discourse appropriated by cost consultants who operate from within UK quantity surveying (QS) practices. The enactment of VM by cost consultants is shaped by the institutional context within which they operate and is not necessarily representative of VM practice per se. Opportunities to perform VM during the formative stages of design are further constrained by the positivistic rhetoric that such practitioners use to conceptualize and promote their services. The complex interplay between VM theory and practice is highlighted and analysed from a non-deterministic perspective. Codified models of 'best practice' are seen to be socially constructed and legitimized through human interaction in the context of interorganizational networks. Published methodologies are seen to inform practice in only a loose and indirect manner, with extensive scope for localized improvization. New insights into the relationship between VM theory and practice are derived from the dramaturgical metaphor. The social reality of VM is seen to be constituted through scripts and performances, both of which are continuously contested across organizational arenas. It is concluded that VM defies universal definition and is conceptualized and enacted differently across different localized contexts.
Resumo:
As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.
Resumo:
Research is described that sought to understand how senior managers within regional contracting firms conceptualize and enact competitiveness. Existing formal discourses of construction competitiveness include the discourse of 'best practice' and the various theories of competitiveness as routinely mobilized within the academic literature. Such discourses consistently underplay the influence of contextual factors in shaping how competitiveness is enacted. An alternative discourse of competitiveness is outlined based on the concepts of localized learning and embeddedness. Two case studies of regional construction firms provide new insights into the emergent discourses of construction competitiveness. The empirical findings resonate strongly with the concepts of localized learning and embeddedness. The case studies illustrate the importance of de-centralized structures which enable multiple business units to become embedded within localized markets. A significant degree of autonomy is essential to facilitate localized entrepreneurial behaviour. In essence, sustained competitiveness was found to depend upon the extent to which de-centralized business units enact ongoing processes of localized learning. Once local business units have become embedded within localized markets the essential challenge is how to encourage continued entrepreneurial behaviour while maintaining a degree of centralized control and coordination. Of key importance is the recognition that the capabilities that make companies competitive transcend organizational boundaries such that they become situated within complex networks of relational ties.
Resumo:
This paper describes the development and validation of a novel web-based interface for the gathering of feedback from building occupants about their environmental discomfort including signs of Sick Building Syndrome (SBS). The gathering of such feedback may enable better targeting of environmental discomfort down to the individual as well as the early detection and subsequently resolution by building services of more complex issues such as SBS. The occupant's discomfort is interpreted and converted to air-conditioning system set points using Fuzzy Logic. Experimental results from a multi-zone air-conditioning test rig have been included in this paper.
Resumo:
Formal and analytical models that contractors can use to assess and price project risk at the tender stage have proliferated in recent years. However, they are rarely used in practice. Introducing more models would, therefore, not necessarily help. A better understanding is needed of how contractors arrive at a bid price in practice, and how, and in what circumstances, risk apportionment actually influences pricing levels. More than 60 proposed risk models for contractors that are published in journals were examined and classified. Then exploratory interviews with five UK contractors and documentary analyses on how contractors price work generally and risk specifically were carried out to help in comparing the propositions from the literature to what contractors actually do. No comprehensive literature on the real bidding processes used in practice was found, and there is no evidence that pricing is systematic. Hence, systematic risk and pricing models for contractors may have no justifiable basis. Contractors process their bids through certain tendering gateways. They acknowledge the risk that they should price. However, the final settlement depends on a set of complex, micro-economic factors. Hence, risk accountability may be smaller than its true cost to the contractor. Risk apportionment occurs at three stages of the whole bid-pricing process. However, analytical approaches tend not to incorporate this, although they could.
Resumo:
This paper presents a study on applying an integrated Global Position System (GPS) and Geographacial Information System (GIS) technology to the reduction of construction waste. During the study, a prototype study is developed from automatic data capture system such as the barcoding system for construction material and equipment (M&E) management onsite, whilst the integrated GPS and GIS technology is combined to the M&E system based on the Wide Area Network (WAN). Then, a case study is conducted to demonstrate the deployment of the system. Experimental results indicate that the proposed system can minimize the amount of onsite material wastage.
Resumo:
Information provision to address the changing requirements can be best supported by content management. The Current information technology enables information to be stored and provided from various distributed sources. To identify and retrieve relevant information requires effective mechanisms for information discovery and assembly. This paper presents a method, which enables the design of such mechanisms, with a set of techniques for articulating and profiling users' requirements, formulating information provision specifications, realising management of information content in repositories, and facilitating response to the user's requirements dynamically during the process of knowledge construction. These functions are represented in an ontology which integrates the capability of the mechanisms. The ontological modelling in this paper has adopted semiotics principles with embedded norms to ensure coherent course of actions represented in these mechanisms. (C) 2008 Elsevier B.V. All rights reserved.
Resumo:
A large and complex IT project may involve multiple organizations and be constrained within a temporal period. An organization is a system comprising of people, activities, processes, information, resources and goals. Understanding and modelling such a project and its interrelationship with relevant organizations are essential for organizational project planning. This paper introduces the problem articulation method (PAM) as a semiotic method for organizational infrastructure modelling. PAM offers a suite of techniques, which enables the articulation of the business, technical and organizational requirements, delivering an infrastructural framework to support the organization. It works by eliciting and formalizing (e. g. processes, activities, relationships, responsibilities, communications, resources, agents, dependencies and constraints) and mapping these abstractions to represent the manifestation of the "actual" organization. Many analysts forgo organizational modelling methods and use localized ad hoc and point solutions, but this is not amenable for organizational infrastructures modelling. A case study of the infrared atmospheric sounding interferometer (IASI) will be used to demonstrate the applicability of PAM, and to examine its relevancy and significance in dealing with the innovation and changes in the organizations.
Resumo:
People's interaction with the indoor environment plays a significant role in energy consumption in buildings. Mismatching and delaying occupants' feedback on the indoor environment to the building energy management system is the major barrier to the efficient energy management of buildings. There is an increasing trend towards the application of digital technology to support control systems in order to achieve energy efficiency in buildings. This article introduces a holistic, integrated, building energy management model called `smart sensor, optimum decision and intelligent control' (SMODIC). The model takes into account occupants' responses to the indoor environments in the control system. The model of optimal decision-making based on multiple criteria of indoor environments has been integrated into the whole system. The SMODIC model combines information technology and people centric concepts to achieve energy savings in buildings.
Resumo:
There is under-representation of senior female managers within small construction firms in the United Kingdom. The position is denying the sector a valuable pool of labour to address acute knowledge and skill shortages. Grounded theory on the career progression of senior female managers in these firms is developed from biographical interviews. First, a turning point model which distinguishes the interplay between human agency and work/home structure is given. Second, four career development phases are identified. The career journeys are characterized by ad hoc decisions and opportunities which were not influenced by external policies aimed at improving the representation of women in construction. Third, the 'hidden', but potentially significant, contribution of women-owned small construction firms is noted. The key challenge for policy and practice is to balance these external approaches with recognition of the 'inside out' reality of the 'lived experiences' of female managers. To progress this agenda there is a need for: appropriate longitudinal statistical data to quantify the scale of senior female managers and owners of small construction firms over time; and, social construction and gendered organizational analysis research to develop a general discourse on gender difference with these firms.