997 resultados para substitution cost
Resumo:
For the last decade, one question has haunted me: what helps people to cope with large-scale organisational change in their workplace? This study explores the construct of personal change resilience, and its potential for identifying solutions to the problems of change fatigue and change resistance. The thesis has emerged from the fields of change management, leadership, training, mentoring, evaluation, management and trust within the context of higher education in Australia at the beginning of the twenty-first century. In this thesis I present a theoretical model of the factors to consider in increasing peoples’ personal change resilience as they navigate large-scale organisational change at work, thereby closing a gap in the literature on the construct of change resilience. The model presented is based on both the literature in the realms of business and education, and on the findings of the research. In this thesis, an autoethnographic case study of two Australian university projects is presented as one narrative, resulting in a methodological step forward in the use of multiple research participants’ stories in the development of a single narrative. The findings describe the experiences of workers in higher education and emphasise the importance of considerate management in the achievement of positive experiences of organisational change. This research makes a significant contribution to new knowledge in three ways. First, it closes a gap in the literature in the realm of change management around personal change resilience as a solution to the problem of change fatigue by presenting models of both change failure and personal change resilience. Second, it is methodologically innovative in the use of personae to tell the stories of multiple participants in one coherent tale presented as a work of ethnographic fiction seen through an autoethnographic lens. By doing so, it develops a methodology for giving a voice to those to whom change is done in the workplace. Third, it provides a perspective on organisational change management from the view of the actual workers affected by change, thereby adding to the literature that currently exists, which is based on the views of those with responsibility for leading or managing change rather than those it affects. This thesis is intended as a practical starting point for conversations by actual change managers in higher education, and it is written in such a way as to help them see how theory can be applied in real life, and how empowering and enabling the actual working staff members, and engaging with them in a considerate way before, during and even after the change process, can help to make them resilient enough to cope with the change, rather than leaving them burned out or disengaged and no longer a well-functioning member of the institution. This thesis shows how considerately managed large-scale organisational change can result in positive outcomes for both the organisation and the individuals who work in it.
Resumo:
This paper presents a pose estimation approach that is resilient to typical sensor failure and suitable for low cost agricultural robots. Guiding large agricultural machinery with highly accurate GPS/INS systems has become standard practice, however these systems are inappropriate for smaller, lower-cost robots. Our positioning system estimates pose by fusing data from a low-cost global positioning sensor, low-cost inertial sensors and a new technique for vision-based row tracking. The results first demonstrate that our positioning system will accurately guide a robot to perform a coverage task across a 6 hectare field. The results then demonstrate that our vision-based row tracking algorithm improves the performance of the positioning system despite long periods of precision correction signal dropout and intermittent dropouts of the entire GPS sensor.
Resumo:
A guide to utilising multi-media for teaching and learning.
Resumo:
The introduction of safety technologies into complex socio-technical systems requires an integrated and holistic approach to HF and engineering, considering the effects of failures not only within system boundaries, but also at the interfaces with other systems and humans. Level crossing warning devices are examples of such systems where technically safe states within the system boundary can influence road user performance, giving rise to other hazards that degrade safety of the system. Chris will discuss the challenges that have been encountered to date in developing a safety argument in support of low-cost level crossing warning devices. The design and failure modes of level crossing warning devices are known to have a significant influence on road user performance; however, quantifying this effect is one of the ongoing challenges in determining appropriate reliability and availability targets for low-cost level crossing warning devices.
Resumo:
We thank Dr. Burd et al. for taking an interest in our paper [1]. The retrospective cohort study was performed and published for two reasons. Firstly, we wished to compare and contrast the use of Acticoat™ and Silvazine™, and secondly we wished to demonstrate how one's practice can be dramatically altered by a change in dressing used. We found that Acticoat™ was safe and easy to use, caused less trauma to patients, required less frequent dressing changes and enabled treatment to be conducted on an outpatient, rather than an inpatient basis. During the period of Acticoat™ treatment we also saw a dramatic reduction in grafting requirements and also in the need for long-term scar management. Burd et al. correctly state that silver-based dressings are now more widely available, however many burn centres in the world continue to use silver sulphadiazine with daily baths. We therefore feel that a comparison is very relevant and useful. Prospective, randomised clinical trials of a range of silver-based dressings would indeed be useful, and hopefully Dr. Burd and colleagues will take up their own suggestion and perform these studies...
Resumo:
This work presents a demand side response model (DSR) which assists small electricity consumers, through an aggregator, exposed to the market price to proactively mitigate price and peak impact on the electrical system. The proposed model allows consumers to manage air-conditioning when as a function of possible price spikes. The main contribution of this research is to demonstrate how consumers can minimise the total expected cost by optimising air-conditioning to account for occurrences of a price spike in the electricity market. This model investigates how pre-cooling method can be used to minimise energy costs when there is a substantial risk of an electricity price spike. The model was tested with Queensland electricity market data from the Australian Energy Market Operator and Brisbane temperature data from the Bureau of Statistics during hot days on weekdays in the period 2011 to 2012.
Resumo:
Temporary Traffic Control Plans (TCP’s), which provide construction phasing to maintain traffic during construction operations, are integral component of highway construction project design. Using the initial design, designers develop estimated quantities for the required TCP devices that become the basis for bids submitted by highway contractors. However, actual as-built quantities are often significantly different from the engineer’s original estimate. The total cost of TCP phasing on highway construction projects amounts to 6–10% of the total construction cost. Variations between engineer estimated quantities and final quantities contribute to reduced cost control, increased chances of cost related litigations, and bid rankings and selection. Statistical analyses of over 2000 highway construction projects were performed to determine the sources of variation, which later were used as the basis of development for an automated-hybrid prediction model that uses multiple regressions and heuristic rules to provide accurate TCP quantities and costs. The predictive accuracy of the model developed was demonstrated through several case studies.
Resumo:
The objective of this research was to develop a model to estimate future freeway pavement construction costs in Henan Province, China. A comprehensive set of factors contributing to the cost of freeway pavement construction were included in the model formulation. These factors comprehensively reflect the characteristics of region and topography and altitude variation, the cost of labour, material, and equipment, and time-related variables such as index numbers of labour prices, material prices and equipment prices. An Artificial Neural Network model using the Back-Propagation learning algorithm was developed to estimate the cost of freeway pavement construction. A total of 88 valid freeway cases were obtained from freeway construction projects let by the Henan Transportation Department during the period 1994−2007. Data from a random selection of 81 freeway cases were used to train the Neural Network model and the remaining data were used to test the performance of the Neural Network model. The tested model was used to predict freeway pavement construction costs in 2010 based on predictions of input values. In addition, this paper provides a suggested correction for the prediction of the value for the future freeway pavement construction costs. Since the change in future freeway pavement construction cost is affected by many factors, the predictions obtained by the proposed method, and therefore the model, will need to be tested once actual data are obtained.
Resumo:
Due to rapidly diminishing international supplies of fossil fuels, such as petroleum and diesel, the cost of fuel is constantly increasing, leading to higher costs of living, as a result of the significant reliance of many industries on motor vehicles. Many technologies have been developed to replace part or all of a fossil fuel with bio-fuels. One of the dual fuel technologies is fumigation of ethanol in diesel engines, which injects ethanol into the intake air stream of the engine. The advantage of this is that it avoids any costly modification of the engine high pressure diesel injection system, while reducing the volume of diesel required and potentially increasing the power output and efficiency. This paper investigates the performance of a diesel engine, converted to implement ethanol fumigation. The project will use both existing experimental data, along with generating computer modeled results using the program AVL Boost. The data from both experiments and the numerical simulation indicate desirable results for the peak pressure and the indicated mean effective pressure (IMEP). Increase in ethanol substitution resulted in elevated combustion pressure and an increase in the IMEP, while the variation of ethanol injection location resulted in negligible change. These increases in cylinder pressure led to a higher work output and total efficiency in the engine as the ethanol substitution was increased. In comparing the numerical and experimental results, the simulation showed a slight elevation, due to the inaccuracies in the heat release models. Future work is required to improve the combustion model and investigate the effect of the variation of the location of ethanol injection.
Resumo:
Highway construction works have significant bearings on all aspects of sustainability. With the increasing level of public awareness and government regulatory measures, the construction industry is experiencing a cultural shift to recognise, embrace and pursue sustainability. Stakeholders are now keen to identify sustainable alternatives and the financial implications of including them on a lifecycle basis. They need tools that can aid the evaluation of investment options. To date, however, there have not been many financial assessments on the sustainability aspects of highway projects. This is because the existing life-cycle costing analysis (LCCA) models tend to focus on economic issues alone and are not able to deal with sustainability factors. This paper provides insights into the current practice of life-cycle cost analysis, and the identification and quantification of sustainability-related cost components in highway projects through literature review, questionnaire surveys and semi-structured interviews. The results can serve as a platform for highway project stakeholders to develop practical tools to evaluate highway investment decisions and reach an optimum balance between financial viability and sustainability deliverables.
Resumo:
Background Lumbar Epidural Steroids Injections (ESI’s) have previously been shown to provide some degree of pain relief in sciatica. Number Needed To Treat (NNT) to achieve 50% pain relief has been estimated at 7 from the results of randomised controlled trials. Pain relief is temporary. They remain one of the most commonly provided procedures in the UK. It is unknown whether this pain relief represents good value for money. Methods 228 patients were randomised into a multi-centre Double Blind Randomised Controlled Trial. Subjects received up to 3 ESI’s or intra-spinous saline depending on response and fall off with the first injection. All other treatments were permitted. All received a review of analgesia, education and physical therapy. Quality of life was assessed using the SF36 at 6 points and compared using independent sample t-tests. Follow up was up to 1 yr. Missing data was imputed using last observation carried forward (LOCF). QALY’s (Quality of Life Years) were derived from preference based heath values (summary health utility score). SF-6D health state classification was derived from SF-36 raw score data. Standard gambles (SG) were calculated using Model 10. SG scores were calculated on trial results. LOCF was not used for this. Instead average SG were derived for a subset of patients with observations for all visits up to week 12. Incremental QALY’s were derived as the difference in the area between the SG curve for the active group and placebo group. Results SF36 domains showed a significant improvement in pain at week 3 but this was not sustained (mean 54 Active vs 61 Placebo P<0.05). Other domains did not show any significant gains compared with placebo. For derivation of SG the number in the sample in each period differed. In week 12, average SG scores for active and placebo converged. In other words, the health gain for the active group as measured by SG was achieved by the placebo group by week 12. The incremental QALY gained for a patient under the trial protocol compared with the standard care package was 0.0059350. This is equivalent to an additional 2.2 days of full health. The cost per QALY gained to the provider from a patient management strategy administering one epidural as suggested by results was £25 745.68. This result was derived assuming that the gain in QALY data calculated for patients under the trial protocol would approximate that under a patient management strategy based on the trial results (one ESI). This is above the threshold suggested by some as a cost effective treatment. Conclusions The transient benefit in pain relief afforded by ESI’s does not appear to be cost-effective. Further work is needed to develop more cost-effective conservative treatments for sciatica.
Resumo:
A recent decision of the Queensland Civil and Administrative Tribunal dealt with the liability of a purchaser to pay a termination penalty where a contract for the purchase of a residential property was terminated during the ‘cooling-off’ period. The decision is Lucy Cole Prestige Properties Broadbeach Pty Ltd ATF Gaindri FT Trust t/as Lucy Cole Prestige Properties Broadbeach Pty Ltd v Kastrissios [2013] QCAT 653.
Resumo:
This chapter focuses on demonstrating the role of Design-Led Innovation (DLI) as an enabler for the success of Small to Medium Enterprises (SMEs) within high growth environments. This chapter is targeted toward businesses that may have been exposed to the concept of design previously at a product level and now seek to better understand its value through implementation at a strategic level offering. The decision to engage in the DLI process is made by firms who want to remain competitive as they struggle to compete in high cost environments, such as the state of the Australian economy at present. The results presented in this chapter outline the challenges in the adoption of the DLI process and the implications it can have. An understanding of the value of DLI in practice—as an enabler of business transformation in Australia—is of benefit to government and the broader design community.
Resumo:
The accuracy of early cost estimates is critical to the success of construction projects. The selected tender price (clients' building cost) is usually seen in previous research as a holistic dependent variable when examining early stage estimates. Unlike other components of construction cost, the amount of contingencies is decided by clients/consultants with consideration of early project information. Cost drivers of contingencies estimates are associated with uncertainty and complexity, and include project size, schedule, ground condition, construction site access, market condition and so on. A path analysis of 133 UK school building contracts was conducted to identify impacts of nine major cost drivers on the determination of contingencies by different clients/cost estimators. This research finds that gross floor area (GFA), schedule and requirement of air conditioning have statistically significant impacts on the contingency determination. The mediating role of schedule between gross floor area and contingencies (GFA→Schedule→Contingencies) was confirmed with the Soble test. The total effects of the three variables on contingencies estimates were obtained with the consideration of this indirect effect. The squared multiple correlation (SMC) of contingencies (=0.624) indicates the identified three variables can explain 62.4% variance of contingencies, and it is comparatively satisfactory considering the heterogeneity among different estimators, unknown estimating techniques and different projects
Resumo:
A statistical approach is used in the design of a battery-supercapacitor energy storage system for a wind farm. The design exploits the technical merits of the two energy storage mediums, in terms of the differences in their specific power and energy densities, and their ability to accommodate different rates of change in the charging/discharging powers. By treating the input wind power as random and using a proposed coordinated power flows control strategy for the battery and the supercapacitor, the approach evaluates the energy storage capacities, the corresponding expected life cycle cost/year of the storage mediums, and the expected cost/year of unmet power dispatch. A computational procedure is then developed for the design of a least-cost/year hybrid energy storage system to realize wind power dispatch at a specified confidence level.