865 resultados para private placements
Resumo:
A critique of the EC Communication on PPPs, challenging the scale of state aid offered to PPPs, the role of PPPs in the economic recovery strategy for the EU, and drawing attention to the damage done to public authorities by 'innovative' financing mechanisms.
Resumo:
The historic pattern of public sector pay movements in the UK has been counter-cyclical with private sector pay growth. Periods of relative decline in public sector pay against private sector movements have been followed by periods of ‘catch-up’ as Government controls are eased to remedy skill shortages or deal with industrial unrest among public servants. Public sector ‘catch up’ increases have therefore come at awkward times for Government, often coinciding with economic downturn in the private sector (Trinder 1994, White 1996, Bach 2002). Several such epochs of public sector pay policy can be identified since the 1970s. The question is whether the current limits on public sector pay being imposed by the UK Government fit this historic pattern or whether the pattern has been broken and, if so, how and why? This paper takes a historical approach in considering the context to public sector pay determination in the UK. In particular the paper seeks to review the period since Labour came into office (White and Hatchett 2003) and the various pay ‘modernisation’ exercises that have been in process over the last decade (White 2004). The paper draws on national statistics on public sector employment and pay levels to chart changes in public sector pay policy and draws on secondary literature to consider both Government policy intentions and the impact of these policies for public servants.
Resumo:
Failed private water concessions have been terminated and replaced with public sector operations in many countries. The paper reviews the negotiating processes involved in these terminations.
Resumo:
This paper contests traditional analyses of high policing, suggesting that it needs to be decoupled (in theoretical terms) from its umbilical linkage to public actors and the preservation and augmentation of state authority. Arguing that conventional conceptualizations of high policing fail to acknowledge the role of private actors, we adopt the term `private high policing' to more accurately reflect the complexity of this paradigm. In particular, we note a long legacy of protecting dominant interests within corporate power structures, as well as increased involvement in outsourced security services for Western states. This has reached its zenith in the recent conflict/reconstruction efforts in Iraq. Eschewing conventional notions of the `proxy' debate, we propose a more complex relationship of obfuscation whereby both public and private high policing actors cross-permeate and coalesce in the pursuit of symbiotic state and corporate objectives.
Resumo:
Abstract: Purpose – The aim of this paper is to examine and compare the performance of architects with respect to clients' rating of importance over a set of performance criteria in Nigerian public and private sector building projects. Design/methodology/approach – A survey involving clients from both public and private sectors of recently completed building projects in Nigeria was undertaken. Data analysis includes comparing similarities and differences using standardised ratio, Mann Whitney U and Wilcoxon tests. Findings – The results show that private sector clients are likely to be more concerned with cost, while public sector clients are more concerned with buildability of design. A total of 79 per cent of the criteria were similarly selected by both sectors with respect to importance of the criteria. Architects need to improve their performance significantly in about 82 per cent of the whole set of 28 criteria. The architects performed better in the public sector than the private sector and 14 per cent of the criteria were indicated as being statistically different in terms of architects' performance. Originality/value – The results provide feedback which can be incorporated in architects' future projects so as to ensure successful project implementation in the building delivery process.
Resumo:
Timely and convenient access to primary healthcare is essential for the health of the population as delays can incur additional health and financial costs. Access to health care is under increasing scrutiny as part of the drive to contain escalating costs, while attempting to maintain equity in service provision. The objective was to compare primary care services in Republic of Ireland and Northern Ireland, and to report on perceived and reported access to GP services in universal access and mixed private/public systems. A questionnaire study was performed in Northern Ireland (NI) and the Republic of Ireland (ROI). Patients of 20 practices in the ROI and NI were contacted (n = 22,796). Main outcome measures were overall satisfaction and the access to GP services. Individual responses and scale scores were derived using the General Practice Assessment Questionnaire (G-PAQ). The response rate was 52% (n = 11,870). Overall satisfaction with GP practices was higher in ROI than in NI (84.2% and 80.9% respectively). Access scores were higher in ROI than in NI (69.2% and 57.0% respectively) Less than 1 in 10 patients in ROI waited two or more working days to see a doctor of choice (8.1%) compared to almost half (45.0%) in NI. In NI overall satisfaction decreased as practice size increased; 82.8%, 80.4%, and 75.8%. In both systems, in large practices, accessibility is reduced when compared to smaller practices. The faster access to GP services in ROI may be due to the deterrent effect of the consultation charge freeing up services although, as it is the poorest and sickest who are deterred by the charge this improved accessibility may come at a significant cost in terms of equity. The underlying concern for policy makers centres around provision of equitable services.