938 resultados para construction and demolition waste


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Inner city, confined site construction is quickly becoming the norm within the construction sector. The aim of this paper is to identify and document the effect, if any, that a confined construction site environment has on the productivity of on-site personnel. In order to compile the relevant information and attain appropriate results on the matter in question, a qualitative analytical approach is adopted. This process incorporates multiple cases studies from Ireland, Northern Ireland and USA. From the resulting case studies, a minimum of three individual interviews and focus group seminars are conducted to aid in the collection of the data while also assisting in the confirmation of the factors identified from a critique of the relevant literature. From the resulting case studies and discussions, a list of the key issues pertaining to the on-site productivity of personnel emerged and is documented as follows; 1) Overcrowding of personnel at workstations, 2) Lack of space for the effective movement of personnel on-site, 3) Numerous trades working within the one space on-site. Through identifying the issues highlighted and proactively mitigating or eliminating the factors detailed, on-site management professionals can strive to ensure maximum productivity from the industry’s most important resource – people.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

London has traditionally exported most of its waste to former mineral workings in surrounding counties for landfill. Many of these sites are being filled and opportunities for new sites are limited. Virtually all waste reprocessing and recycling facilities, with the exception of textile sorting and some facilities for glass and organic waste composting, are outside London. The Mayor of London's Vision for Waste in London is that by 2020, municipal waste should not compromise London’s future as a sustainable city. This will involve managing waste better, so that its impact on the local and global environment and on London communities, economy and health is minimised. The majority of waste and recyclable materials in London are currently collected and transported for recovery, disposal or reprocessing by road in large vehicles. Environmental costs include, adding to congestion, noise, energy usage, air pollution, and accidents. The Mayor is keen to increase recycling and reuse of waste materials in London, and to ensure that as more of London's waste is diverted away from landfill sites to recycling facilities. Several projects and initiatives have been established and these are reviewed in the paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A flow injection analysis (FIA) system comprising a cysteine selective electrode as detection system was developed for determination of this amino acid in pharmaceuticals. Several electrodes were constructed for this purpose, having PVC membranes with different ionic exchangers and mediator solvents. Better working characteristics were attained with membranes comprising o-nitrophenyl octyl ether as mediator solvent and a tetraphenylborate based ionic-sensor. Injection of 500 µL standard solutions into an ionic strength adjuster carrier (3x10-3 M) of barium chloride flowing at 2.4mL min-1, showed linearity ranges from 5.0x10-5 to 5.0x10-3 M, with slopes of 76.4±0.6mV decade-1 and R2>0.9935. Slope decreased significantly under the requirement of a pH adjustment, selected at 4.5. Interference of several compounds (sodium, potassium, magnesium, barium, glucose, fructose, and sucrose) was estimated by potentiometric selectivity coefficients and considered negligible. Analysis of real samples were performed and considered accurate, with a relative error to an independent method of +2.7%.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreement to undertake construction and complete the road in accordance with the engineer or the Port Robinson and Thorold macadamized road. This is signed by John Williams, Aug. 11, 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tesis (Doctor en Filosofía con Orientación en Trabajo Social y Políticas Comparadas de Bienestar Social) UANL, 2011.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Thèse numérisée par la Division de la gestion de documents et des archives de l'Université de Montréal

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Este recurso presenta a los jóvenes de una manera muy visual, la idea del proceso de reciclaje de los residuos orgánicos: los desperdicios de los alimentos y los residuos de jardinería. Conduce al lector en un viaje para la localización de los residuos, y cómo son reciclados, desde el principio hasta el acabado del nuevo producto. Incluye: fotografías del proceso del reciclaje; datos y cifras del reciclaje; consejos y actividades de diversión. Tiene glosario, bibliografía y sitios web.