866 resultados para Watershed projects
Resumo:
Little River Lake watershed is a 13,305 acre subwatershed of Little River. The 788 acre lake was listed as a 303d impaired water body in 2008 due to elevated turbidity and algae levels. The Decatur SWCD has prioritized water quality protection efforts within the Little River Lake watershed because 1) portions of this watershed has been identified as the primary contributor of sediment and nutrients to Little River Lake, which provides an essential source of drinking water for Decatur County and the Southern Iowa Rural Water Association; 2) the watershed provides exemplary education and project interpretation opportunities due to its proximity to Little River Lake Recreation Area, and 3) by using targeted and proven soil conservation practices to address water quality deficiencies the probability of successfully attenuating soil erosion and ameliorating water quality impairments is enhanced. The specific goals of this proposal are to: 1. reduce annual sediment, and phosphorous delivery to the lake by 11,280 tons and 14,664 lbs., respectively, via applications of conservation practices on targeted agricultural land; 2. delist the lake as an EPA 303d impaired water body via water quality enhancement; 3. obtain a “Full Support” status for the lake’s aquatic life and recreational use; 4. reduce potable water treatment costs (minimum 50% cost reduction) associated with high suspended solid levels; and 5. restore a viable sport-fish population, thereby bolstering tourism and the economy. To achieve timely project implementation the Decatur SWCD has cooperated with the IDNR Watershed Improvement Section, Fisheries Bureau, and IDALS-DSC to assess extant water quality and watershed conditions, coalesced a diverse team of committed partners and secured matching funding from multiple sources.
Resumo:
The Tuttle Lake Watershed is approximately 125,000 acres and Tuttle Lake itself is 2,270 acres; 5,609 acres of the watershed lies in Iowa territory within Emmet County. It is a sub-watershed of the larger East Fork Des Moines River Watershed, also referred to as Hydrologic Unit Code 07100003. For the purpose of this document, grant money is only being applied for the project implementation in the Iowa portion of the Tuttle Lake Watershed. Tuttle Lake was placed on the 2002 EPA 303(d) Impaired Waters List due to a “very large population of suspended algae and very high levels of inorganic turbidity.” In 2004, the Iowa Department of Natural Resources (IDNR) completed a Total Maximum Daily Load (TMDL) study on Tuttle Lake and found excess sediment and phosphorus levels being the primary pollutants causing the algae and turbidity impairment. Although two point sources were located in Minnesota, IDNR determined that the influx of nutrients is likely from agricultural runoff and re-suspension of lake sediment. The condition of Tuttle Lake is such that the reduction of sediment, nutrients [phosphorus and nitrogen] and pathogens is the primary objective. To achieve that objective, wetlands will be constructed in this first phase to reduce the delivery of nitrogen, phosphorus, and sediment to Tuttle Lake.
Resumo:
Silver Lake is located in an 18,053-acre watershed. The watershed is intensively farmed with almost all of the wetlands being previously drained or degraded over the last 50 years. Silver Lake is listed on the State of Iowa’s impaired water bodies list due to sediment and high nutrient level. Silver Lake is also known be in the bottom 25 percentile of Iowa’s lakes due Secchi disk readings and Chlorophyll a level. Farming in the watershed is the principle concern and cause for many of the problems occurring in Silver Lake currently with 78% of the watershed being intensively farmed. There are two major drainage ditches that have been used to drain the major wetlands and sloughs that, at one time, filtered the water and slowed it down before it reached Silver Lake. With these two major drainage ditches, water is able to reach the lake much faster and unfiltered than it once did historically. The loss of 255 restorable wetland basins to row crop production has caused serious problems in Silver Lake. These wetland basins once slowed and filtered water as it moved through the watershed. With their loss over the last 50 years that traditional drainage no longer occurs. We propose to create a Wetland Reserve Program incentive project to make WRP a more attractive option to landowners within the watershed. The incentive will be based on the amount of sediment delivery reduction to the lake, therefore paying a greater payment for a greater benefit to the lake. The expected result of this project is the restoration of over 250 acres of wetland basins with an associated 650 acres of upland buffers. The benefit for these wetlands and buffers would be reduced sediment, reduced nutrients, and slowed waters to the lake.
Resumo:
Miller Creek is on the 2006 Section 303d Impaired Waters List and has a 19,926 acre watershed. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to sediment and nutrient delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. In an effort to control these problems, the Miller Creek Water Quality Project will target areas of 5 tons per acre or greater soil loss or with 0.5 tons per acre or greater sediment delivery rates. The assessment revealed these targeted priority lands make up 32% or 6,395 acres of the Miller Creek watershed. Priority lands include cropland, pasture land, timber, and sensitive riparian areas. It is the goal of this project to reduce sediment delivery by 70% on 60% or 3,837 acres of these priority lands. This will be accomplished through installation of strategically placed structural practices, rotational grazing systems, and buffer strips. These practices will reduce soil loss, reduce sediment delivery, improve water quality, and improve wildlife habitat in the watershed. Utilizing partnerships with NRCS and IDALS-DSC will be important in making this project successful. In addition to using matching funds from EQIP, WHIP, and CRP, the Monroe SWCD is committed to prioritizing local cost share funds through IFIP and REAP for use in the Miller Creek Watershed.
Resumo:
With WIRB funding the Fox River Ecosystem Development board will install prioritized practices identified by assessments within the impaired segment of Fox River that currently will not be funded by Iowa Section 319 or Watershed Protection Funds. The FRED board is also asking for funding for a three year position for continuing assessment, planning, and technical assistance. Through various funding sources local work groups have been able to address some of the critical and high priority areas. But, as further assessments are made, commitment, and need expressed from landowners grow, the FRED board and SWCD districts in both Iowa and Missouri are committed not only to seek funding to continue water quality efforts for more practices but also enhance and protect existing practices and investments that protect our water quality and economic viability in both states.
Resumo:
Initiated in 2001, the West Tarkio Creek Watershed Project has a proven track record of implementing an enormous amount of structural conservation practices. To date, over $925,000 has been spent to build 69 miles of terraces on 63 cooperators' land. The success of the Project was due in large part to the conservation ethic of the landowners to improve their farms, preserve the productivity of the land, and protect West Tarkio Creek. This has been made possible through funding from DSC Watershed Protection Funds (WSPF) which has provided $1,362,592 in cost share funds since 2001 but is has been severely limited in recent years due to shortages within the State’s budget. The original project goals called for the construction of 750,000 feet (142 miles) of terraces to effectively treat the watershed. In order to meet these goals and bring the project to a successful endpoint, another 153,000 feet (29 miles) remain to be constructed by the landowners with the help of the SWCD staff. Severe rain events in recent years have caused an enormous amount of damage throughout the region, these storms were helpful in identifying where watershed work remains to be completed. Scars on the landscape in the aftermath of the storms clearly etched out the specific location where additional practices are needed in addition to those proposed in the original project work plan. Project supporters are confident that the WIRB Program can unlock this potential and pave the way for what can become known as one of the most effective land treatment projects in Iowa.
Resumo:
In 2004, Walnut Creek was placed on the 303d list of Impaired Waters due to a low biotic index (lack of aquatic life) during IDNR stream sampling events. Sediment originating from agriculture, streambank erosion, and channelization were listed as the most likely sources impacting aquatic life. In an effort to address these concerns, a preliminary study was completed of the multi-county watershed to identify priority areas. A Watershed Development & Planning Assistance Grant was then funded by the IDALS-DSC to conduct a detailed assessment of these prioritized sub-watersheds. The impending assessment of the watershed and the stream corridor revealed ample opportunities to address gully, sheet and rill erosion while addressing in-stream water velocity issues that plagued the riparian corridor. A comprehensive plan was developed comprised of a variety of best management practices to address the identified concerns. In 2009, this plan was submitted to the WIRB Board by the East Pottawattamie and Montgomery SWCDs and $489,455 was awarded to address concerns identified during watershed assessment inquiries. Despite adverse weather conditions, which has hampered conservation construction recently, this project has held fast to pre-project goals due to the fortitude of the project sponsors and the overwhelming participation by the watershed landowners. Unfortunately, state budget shortfalls are bringing project progress to a halt. As specified in the original WIRB funding request, practice funding for Year 3 was to come from the Division of Soil Conservation’s Watershed Protection Fund (WSPF). Due to Iowa’s budgetary restraints, the Walnut Creek WSPF application, which was submitted this spring, was not funded since no new applications in the state were funded. If funded again, this grant will serve as the critical step in continuing what is destined to be a true watershed success story.
Resumo:
The Rathbun Land and Water Alliance and partners have undertaken a highly effective approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This application proposes to assist landowners to construct five large sediment retention basins that will reduce sediment and phosphorus delivery from priority land in targeted sub-watersheds. The Alliance, with previous WIRB support, demonstrated that construction of these basins at strategically selected sites is one of the most cost effective measures to reduce sediment and phosphorus delivery to Rathbun Lake. Features of this project are: (1) use of geographic information system (GIS) analysis to identify potential basin sites; (2) assistance for landowners to construct 5 basins that will reduce the annual delivery of sediment by 1,500 tons and phosphorus by 5,000 pounds; (3) evaluation of the benefits from basin construction using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs including sediment retention basins to protect water quality.
Resumo:
Part of a phased approach, an intensive information and education program, construction of erosion control practices, and sediment control on construction sites is proposed. These proposed practices will manage sediment runoff and nutrient runoff on agricultural and urban areas. Sediment control “structures” such as waterways, wetlands, modified terraces, grade stabilization structures, sediment basins, and rain gardens is proposed and will be combined with nutrient and pesticide management and reduced tillage to reduce non-point source pollution. A reduction of 15% of the sediment and phosphorus delivered to a water body from priority areas will be looked at as a success in this short-term project focused primarily at education within the project area which is also, for the most part, the top 25% sediment load producing sub-watersheds. In addition, four urban areas have been identified as part of this project as needing immediate assistance. A combination of urban and agricultural conservation practices, shoreline revegetation, and education of landowners will be used to achieve these results on both the urban and the agricultural arena.
Resumo:
The main channel of Upper Buffalo Creek has been identified on Iowa's 303(d) List of Impaired Waters as having a biological impairment (i.e., greater than 50% decrease in mussel species) due to habitat modification, stream alteration, nutrients, and/or siltation. The Buchanan County SWCD has identified this as a priority watershed because mussel population decreases have been well documented to be directly associated with decreases in ecological value, recreational value, and overall water quality. The presence of a diverse and reproducing mussel population indicates that a healthy aquatic ecosystem is intact, which means good fishing, good water quality for wildlife, and assurance that water is safe for recreation. Dan Cohen, Buchanan Conservation Board Director, stated that "should water quality conditions improve, and fishing holes and habitat be enhanced, there is no doubt that many people would take advantage of the renewed recreational opportunities". This watershed contains two "threatened" species of mussels and five "sensitive" species of fish. The District feels that a watershed project will assist in implementing conservation practices that will greatly improve water quality and enhance biological and recreational venues.
Resumo:
The Rathbun Land and Water Alliance and partners have undertaken a highly effective approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in targeted sub-watersheds as part of the Rathbun Lake Special Project. Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs for 4,000 acres that will reduce the annual delivery of sediment by 6,000 tons and phosphorus by 20,000 pounds; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.
Resumo:
This project would construct a sediment basin on the main inlet stream to Swan Lake, an impaired waterbody currently on the 303(d) list. This project is one of the highest priorities in our Watershed Management Plan. According to STEPL modeling, it would sequester over 1/3 of the total phosphorus (the pollutant of main concern) coming into the lake.
Resumo:
Miller Creek, a 19,926 acre watershed, is listed on the 2008 Section 303d Impaired Waters List. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to nutrient and sediment delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. The WIRB board provided implementation grant funds in 2010 for a three year project to treat targeted areas of 5 tons per acre or greater soil loss with an estimated reduction of 2,547 tons. As of December 1, 2012, with 95% of the funds allocated, the final results are estimated to provide a sediment delivery reduction of 4,500 tons and an estimated phosphorus reduction of 5,700 lbs per year. These accomplishments and the completion of the three year Miller Creek WIRB project represent "Phase I" of the SWCD's goals to treat the Miller Creek watershed. This application represents "Phase II" or the final phase of the Miller Creek water quality project. The Monroe SWCD plans to reduce sediment delivery by 70% on an additional 245 acres of priority land. This goal will be accomplished through installation of strategically placed structural practices, BMPs, and grazing systems. These practices will reduce soil loss, nutrient runoff, and sediment delivery as well as improve water quality and wildlife habitat in the watershed. Utilization of partnerships with NRCS and IDALS-DSC will continue to be an important part to the success of the project. Project goals will be achieved by utilizing matching funds from EQIP, and the Monroe SWCD has approved the use of District IFIP cost share funds specifically for use in the Miller Creek Watershed.
Resumo:
Little Clear Lake is a 162 acre natural lake located in the western part of Pocahontas County. The lake has a 375 acre watershed that is gently rolling with nearly 84% of the watershed in row crop production. The lake is listed on the Iowa DNR’s impaired waters list due to nutrients, siltation and exotic species (purple loosestrife). These impairments have been verified with in-lake monitoring and landowner conversations as well as watershed modeling. The watershed models estimates that the average sheet and rill erosion is 1.74 tons/acre/year and sediment delivery is .12 tons/acre/year with a total of 44 tons/year being delivered to Little Clear Lake. The goal of the Little Clear Lake Watershed Protection Plan is to (1) reduce sediment delivery to Little Clear Lake by 60%, or 26.5 tons annually, by installing best management practices within the watershed. Doing this will control nearly 100% of the of the lake’s drainage area; and (2) initiate an information and education campaign for residents within the Little Clear Lake watershed which will ultimately prepare the residents and landowners for future project implementation. In an effort to control sediment and nutrient loading the Little Clear Lake Watershed Protection Plan has included 3 sediment catch basin sites and 5 grade stabilization structures, which function to stabilize concentrated flow areas.
Resumo:
Storm Lake, the state's fourth largest natural lake, has been the centerpiece of significant economic development, including a resort, water park, and state marina. While there have been considerable improvements to the lake's water quality through a major on-going lake restoration program and watershed project, the Little Storm Lake area still needs to be addressed. Little Storm Lake is a 190 acre area on the nmihwest side of Storm Lake. The water level in both areas is based on the dam height located on the southeast corner of Storm Lake. Approximately 70% of the water from the watershed flows through Little Storm Lake. Little Storm Lake originally had the ability to remove much of the sediment and nutrients from incoming waters. However, due to degradation, proper wetland function has been compromised. Under normal hydrologic conditions Little Storm Lake has the potential to function as a sediment trap for Storm Lake, but tllis capacity is overwhelmed during high flows. Little Storm Lake is at or near its sediment trapping capacity, which results in higher sediment transport into Storm Lake. Resuspension of sediments due to wind and other in-lake dynamics, such as rough fish, further exacerbate the total turbidity from suspended sediment and results in movement of sediment from Little Storm Lake into Storm Lake. This project includes a fish barrier and water retention structure between Little Storm Lake and Storm Lake and the construction of a pumping station and associated equipment. The project involves periodic dewatering of Little Storm Lake during years of favorable climatological conditions to consolidate the sediments and revegetate the area. Construction of the fish banier would aid restoration efforts by preventing rough fish from destroying the vegetation and would decrease recruitment of rough fish by limiting their spawning area. In the future, if the diminished trapping capacity of Little Storm Lake still results in sediment moving into Storm Lake, a dredging project would be initiated to deepen Little Storm Lake.