902 resultados para Validation and certification competences process
Resumo:
The urge to gamble is a physiological, psychological, or emotional motivational state, often associated with continued gambling. The authors developed and validated the 6-item Gambling Urge Questionnaire (GUS), which was based on the 8-item Alcohol Urge Questionnaire (M. J. Bohn, D. D. Krahn, & B. A. Staehler, 1995), using 968 community-based participants. Exploratory factor analysis using half of the sample indicated a 1-factor solution that accounted for 55.18% of the total variance. This was confirmed using confirmatory factor analysis with the other half of the sample. The GUS had a Cronbach's alpha coefficient of .81. Concurrent, predictive, and criterion-related validity of the GUS were good, suggesting that the GUS is a valid and reliable instrument for assessing gambling urges among nonclinical gamblers.
Resumo:
Objectives: To validate the WOMAC 3.1 in a touch screen computer format, which applies each question as a cartoon in writing and in speech (QUALITOUCH method), and to assess patient acceptance of the computer touch screen version. Methods: The paper and computer formats of WOMAC 3.1 were applied in random order to 53 subjects with hip or knee osteoarthritis. The mean age of the subjects was 64 years ( range 45 to 83), 60% were male, 53% were 65 years or older, and 53% used computers at home or at work. Agreement between formats was assessed by intraclass correlation coefficients (ICCs). Preferences were assessed with a supplementary questionnaire. Results: ICCs between formats were 0.92 (95% confidence interval, 0.87 to 0.96) for pain; 0.94 (0.90 to 0.97) for stiffness, and 0.96 ( 0.94 to 0.98) for function. ICCs were similar in men and women, in subjects with or without previous computer experience, and in subjects below or above age 65. The computer format was found easier to use by 26% of the subjects, the paper format by 8%, and 66% were undecided. Overall, 53% of subjects preferred the computer format, while 9% preferred the paper format, and 38% were undecided. Conclusion: The computer format of the WOMAC 3.1 is a reliable assessment tool. Agreement between computer and paper formats was independent of computer experience, age, or sex. Thus the computer format may help improve patient follow up by meeting patients' preferences and providing immediate results.
Resumo:
Objective: To establish concurrent validity, interrater and test-retest reliability of the Modified Elderly Mobility Scale (MEMS). Methods: Ninety elderly patients were scored on the MEMS. To establish concurrent validity, 75 patients MEMS scores were compared to Functional Independence Measure (FIM) scores using Spearman's correlation. Videotaped patient performances were used to establish interrater and test-retest reliability using percentage absolute agreement and intraclass correlation coefficients (ICCs). Results: The total MEMS score demonstrated a significant association with the motor (r = 0.725) and total FIM scores (r = 0.718). Absolute agreement for interrater reliability was greater than 93% for all test items, with 97 and 98% for the two new measures, respectively. Test-retest reliability demonstrated similar high levels of absolute agreement and had ICCs ranging from 0.870 to 1.0. Conclusions: The MEMS is a quick, valid and reliable test of motor function of elderly patients with a spread of functional levels.
Resumo:
This paper presents a critical comparison of major changes in engineering education in both Australia and Europe. European engineering programs are currently being reshaped by the Bologna process, representing a move towards quality assurance in higher education and the mutual recognition of degrees among universities across Europe. Engineering education in Australia underwent a transformation after the 1996 review of engineering education1. The paper discusses the recent European developments in order to give up-to-date information on this fast changing and sometimes obscure process. The comparison draws on the implications of the Bologna Process on the German engineering education system as an example. It concludes with issues of particular interest, which can help to inform the international discussion on how to meet today’s challenges for engineering education. These issues include ways of achieving diversityamong engineering programs, means of enabling student and staff mobility, and the preparation of engineering students for professional practic e through engineering education. As a result, the benefits of outcomes based approaches in education are discussed. This leads to an outlook for further research into the broader attributes required by future professional engineers. © 2005, Australasian Association for Engineering Education
Resumo:
Improving healthcare quality is a growing need of any society. Although various quality improvement projects are routinely deployed by the healthcare professional, they are characterised by a fragmented approach, i.e. they are not linked with the strategic intent of the organisation. This study introduces a framework which integrates all quality improvement projects with the strategic intent of the organisation. It first derives the strengths, weaknesses, opportunities and threats (SWOT) matrix of the system with the involvement of the concerned stakeholders (clinical professional), which helps identify a few projects, the implementation of which ensures achievement of desired quality. The projects are then prioritised using the analytic hierarchy process with the involvement of the concerned stakeholders (clinical professionals) and implemented in order to improve system performance. The effectiveness of the method has been demonstrated using a case study in the intensive care unit of Queen Elizabeth Hospital in Bridgetown, Barbados.
Resumo:
This research examines the role of the information management process within a process-oriented enterprise, Xerox Ltd. The research approach is based on a post-positive paradigm and has resulted in thirty-five idiographic statements. The three major outcomes are: 1. The process-oriented holistic enterprise is an organisation that requires a long-term management commitment to its development. It depends on the careful management of people, tasks, information and technology. A complex integration of business processes is required and this can be managed through the use of consistent documentation techniques, clarity in the definition of process responsibilities and management attention to the global metrics and the centralisation of the management of the process model are critical to its success. 2. The role of the information management process within the context of a process-oriented enterprise is to provide flexible and cost-effective applications, technological, and process support to the business. This is best achieved through a centralisation of the management of information management and of the process model. A business-led approach combined with the consolidation of applications, information, process, and data architectures is central to providing effective business and process-focused support. 3. In a process oriented holistic enterprise, process and information management are inextricably linked. The model of process management depends heavily on information management, whilst the model of information management is totally focused around supporting and creating the process model. The two models are mutually creating - one cannot exist without the other. There is a duality concept of process and information management.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT