830 resultados para Segment Reporting
Resumo:
AIM: To report the results of whole anterior segment proton beam radiotherapy (PBR) for diffuse iris melanoma. METHODS: Between 2000 and 2011, 12 patients with iris melanoma received PBR to the entire iris and ciliary body. RESULTS: Patients had a mean age of 57 years and a median follow-up of 3.5 years (range 1-11.6 years). Tumour iris involvement was 1-4 h in five patients, 5-8 h in four and 9-12 h in three. Angle involvement was 6-8 h in five patients and 9-12 h in seven. The visual acuity (VA) before treatment was 6/5-6/6 in six patients, 6/8-6/9 in three and 6/18-6/38 in three. No tumour recurrence occurred during the follow-up period. Glaucoma treatment was required in 11 of 12 patients. The visual acuity at the last follow-up was 6/5-6/9 in five patients, 6/18-6/24 in three, 6/60-1/60 in two and no light perception in two. Four patients developed varying non-severe degrees of limbal stem cell deficiency, which was treatable with conservative measures. CONCLUSIONS: Whole anterior segment PBR is a useful alternative to enucleation for diffuse iris melanoma. Most patients will need treatment for glaucoma and some may require treatment for tear-film instability and/or stem cell failure.
Resumo:
PURPOSE: To describe the use of anterior segment optical coherence tomography (AS-OCT) to clarify the position and patency of aqueous shunt devices in the anterior chamber of eyes where corneal edema or tube position does not permit a satisfactory view. DESIGN: Noncomparative observational case series. METHODS: Four cases are reported in which aqueous shunt malposition or obstruction was suspected but the shunt could not be seen on clinical examination. The patients underwent AS-OCT to identify the position and patency of the shunt tip. RESULTS: In each case, AS-OCT provided data regarding tube position and/or patency that could not be obtained by slit-lamp examination or by gonioscopy that influenced management. CONCLUSIONS: AS-OCT can be used to visualize anterior chamber tubes in the presence of corneal edema that precludes an adequate view or in cases where the tube is retracted into the cornea. In such cases, AS-OCT is useful in identifying shunt patency and position, which helps guide clinical decision making.
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 2 - Construction and Maintenance Operations and Reporting. This module provides hands on examples of applications of metric measurements in the construction and maintenance field operations.
Resumo:
A review of the Iowa Department of Transportation's field data collection and reporting system has been performed. Included were several systems used by the Office of Construction and Local Jurisdictions. The entire field data collection and reporting systems for asphalt cement concrete (ACC) paving, portland cement concrete (PCC) paving, and PCC structures were streamlined and computerized. The field procedures for materials acceptance were also reviewed. Best practices were identified and a method was developed to prioritize materials so transportation agencies could focus their efforts on high priority materials. Iowa State University researchers facilitated a discussion about Equal Employment Opportunity (EEO) and Affirmative Action (AA) procedures between the Office of Construction field staff and the Office of Contracts. A set of alternative procedures was developed. Later the Office of Contracts considered these alternatives as they developed new procedures that are currently being implemented. The job close-out package was reviewed and two unnecessary procedures were eliminated. Numerous other procedures were reviewed and flowcharted. Several changes have been recommended that will increase efficiency and allow staff time to be devoted to higher priority activities. It is estimated the improvements in ACC paving, PCC paving and structural concrete will by similar to three full time equivalent (FTE) positions to field construction, field materials and Office of Materials. Elimination of EEO interviews will be equivalent to one FTE position. It is estimated that other miscellaneous changes will be equivalent to at least one other FTE person. This is a total five FTEs. These are conservative estimates based on savings that are easily quantified. It is likely that total positive effect is greater when items that are difficult to quantify are considered.
Resumo:
Much biomedical research is observational. The reporting of such research is often inadequate, which hampers the assessment of its strengths and weaknesses and of a study's generalisability. The Strengthening the Reporting of Observational Studies in Epidemiology (STROBE) Initiative developed recommendations on what should be included in an accurate and complete report of an observational study. We defined the scope of the recommendations to cover three main study designs: cohort, case-control, and cross-sectional studies. We convened a 2-day workshop in September 2004, with methodologists, researchers, and journal editors to draft a checklist of items. This list was subsequently revised during several meetings of the coordinating group and in e-mail discussions with the larger group of STROBE contributors, taking into account empirical evidence and methodological considerations. The workshop and the subsequent iterative process of consultation and revision resulted in a checklist of 22 items (the STROBE Statement) that relate to the title, abstract, introduction, methods, results, and discussion sections of articles. 18 items are common to all three study designs and four are specific for cohort, case-control, or cross-sectional studies. A detailed Explanation and Elaboration document is published separately and is freely available on the Web sites of PLoS Medicine, Annals of Internal Medicine, and Epidemiology. We hope that the STROBE Statement will contribute to improving the quality of reporting of observational studies.
Resumo:
The aim of this paper is to describe the process and challenges in building exposure scenarios for engineered nanomaterials (ENM), using an exposure scenario format similar to that used for the European Chemicals regulation (REACH). Over 60 exposure scenarios were developed based on information from publicly available sources (literature, books, and reports), publicly available exposure estimation models, occupational sampling campaign data from partnering institutions, and industrial partners regarding their own facilities. The primary focus was on carbon-based nanomaterials, nano-silver (nano-Ag) and nano-titanium dioxide (nano-TiO2), and included occupational and consumer uses of these materials with consideration of the associated environmental release. The process of building exposure scenarios illustrated the availability and limitations of existing information and exposure assessment tools for characterizing exposure to ENM, particularly as it relates to risk assessment. This article describes the gaps in the information reviewed, recommends future areas of ENM exposure research, and proposes types of information that should, at a minimum, be included when reporting the results of such research, so that the information is useful in a wider context.
Resumo:
Retinal diseases are nowadays the most common causes of vision threatening in developed countries. Therapeutic advances in this field are hindered by the difficulty to deliver drugs to the posterior segment of the eye. Due to anatomical barriers, the ocular biodisponibility of systemically administered drugs remains poor, and topical instillation is not adequate to achieve therapeutic concentrations of drugs in the back of the eye. Ocular drug delivery has thus become one of the main challenges of modern ophthalmology. A multidisciplinary research is being conducted worldwide including pharmacology, biomaterials, ophthalmology, pharmaceutics, and biology. New promising fields have been developed such as implantable or injectable slow release intravitreal devices and degradable polymers, dispersed polymeric systems for intraocular drug delivery, and transscleral delivery devices such as iontophoresis, osmotic pumps or intra-scleraly implantable materials. The first clinical applications emerging from this research are now taking place, opening new avenues for the treatment of retinal diseases.
Resumo:
Background: Anterior ciliary arteries travelling along recti muscles provide anterior segment vascularization, which can be compromised by surgery involving more than 2 muscles.Patients and Methods: We studied retrospectively the files of 10 patients in whom a fluorescein angiography of the iris had been performed as a pre-operative assessment prior to a second or third oculomotor surgery.Results: The median age of the patients was 47.5 years (range 15 to 73 years). Relative iris ischemia was present in 4 patients following multiple surgeries, none of them presenting any general cardiovascular risk. The initial surgical protocol was modified according to angiographic results in these 4 patients.Conclusion: When further surgery has to be performed on previously multi-operated patients, anterior segment angiography can be useful in the planning of surgery in order to minimize the risks of anterior segment ischemia.
Resumo:
The development of new drug delivery systems to target the anterior segment of the eye may offer many advantages: to increase the biodisponibility of the drug, to allow the penetration of drug that cannot be formulated as solutions, to obtain constant and sustained drug release, to achieve higher local concentrations without systemic effects, to target more specifically one tissue or cell type, to reduce the frequency of instillation and therefore increase the observance and comfort of the patient while reducing side effects of frequent instillation. Several approaches are developed, aiming to increase the corneal contact time by modified formulation or reservoir systems, or by increasing the tissue permeability using iontophoresis. To date, no ocular drug delivery system is ideal for all purposes. To maximize treatment efficacy, careful evaluation of the specific pathological condition, the targeted Intraocular tissue and the location of the most severe pathology must be made before selecting the method of delivery most suitable for each individual patient.
Resumo:
The approach to intervention programs varies depending on the methodological perspective adopted. This means that health professionals lack clear guidelines regarding how best to proceed, and it hinders the accumulation of knowledge. The aim of this paper is to set out the essential and common aspects that should be included in any program evaluation report, thereby providing a useful guide for the professional regardless of the procedural approach used. Furthermore, the paper seeks to integrate the different methodologies and illustrate their complementarity, this being a key aspect in terms of real intervention contexts, which are constantly changing. The aspects to be included are presented in relation to the main stages of the evaluation process: needs, objectives and design (prior to the intervention), implementation (during the intervention), and outcomes (after the intervention). For each of these stages the paper describes the elements on which decisions should be based, highlighting the role of empirical evidence gathered through the application of instruments to defined samples and according to a given procedure.
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Human Services’ Iowa Collection and Reporting System (ICAR) for the period April 1, 2013 through April 24, 2013 and April 1, 2014 through April 29, 2014
Resumo:
Small bowel intussusception is a rare long-term complication after Roux-en-Y gastric bypass, the etiology of which remains unclear. Except for one series reporting on 23 patients, case reports represent the vast majority of all cases reported so far. With this complete review of the world literature, based on a total of 63 patients including 2 of our own cases, we provide an extensive overview of the subject. The origin of intussusception after gastric bypass is different from that of intussusception of other causes, in that there is usually no lead point. It is likely related to motility disorders in the divided small bowel, especially in the Roux limb. This rare condition may cause obstruction and lead to bowel necrosis if not recognized and treated promptly. Clinical presentation is not specific. Computerized tomography scan represents the diagnostic test of choice, but surgery is sometimes the only way to establish the diagnosis. Treatment may be limited to reduction if the small bowel is viable, but resection of the affected segment is recommended on the basis of this review, since it seems to result in fewer recurrences. Knowledge of this entity and a high index of suspicion are required to make the correct diagnosis and offer appropriate treatment in a timely fashion.
Resumo:
Global positioning systems (GPS) offer a cost-effective and efficient method to input and update transportation data. The spatial location of objects provided by GPS is easily integrated into geographic information systems (GIS). The storage, manipulation, and analysis of spatial data are also relatively simple in a GIS. However, many data storage and reporting methods at transportation agencies rely on linear referencing methods (LRMs); consequently, GPS data must be able to link with linear referencing. Unfortunately, the two systems are fundamentally incompatible in the way data are collected, integrated, and manipulated. In order for the spatial data collected using GPS to be integrated into a linear referencing system or shared among LRMs, a number of issues need to be addressed. This report documents and evaluates several of those issues and offers recommendations. In order to evaluate the issues associated with integrating GPS data with a LRM, a pilot study was created. To perform the pilot study, point features, a linear datum, and a spatial representation of a LRM were created for six test roadway segments that were located within the boundaries of the pilot study conducted by the Iowa Department of Transportation linear referencing system project team. Various issues in integrating point features with a LRM or between LRMs are discussed and recommendations provided. The accuracy of the GPS is discussed, including issues such as point features mapping to the wrong segment. Another topic is the loss of spatial information that occurs when a three-dimensional or two-dimensional spatial point feature is converted to a one-dimensional representation on a LRM. Recommendations such as storing point features as spatial objects if necessary or preserving information such as coordinates and elevation are suggested. The lack of spatial accuracy characteristic of most cartography, on which LRM are often based, is another topic discussed. The associated issues include linear and horizontal offset error. The final topic discussed is some of the issues in transferring point feature data between LRMs.
Resumo:
Report on the Peace Officers’ Retirement, Accident and Disability System, Schedule of Employer Pension Amounts required to implement Governmental Accounting Standards Board (GASB) Statement No. 68, Accounting and Financial Reporting for Pensions for the year ended June 30, 2015