927 resultados para Project 2006-036-A : Multi-Outcome Construction Policies
Resumo:
Agreed upon procedures report for evaluating compliance with provisions of IowaCare (Project No 11-W-00189/7) within the Iowa Department of Human Services for the year ended June 30, 2006
Resumo:
The purpose of this Iowa manual is to serve as a guide, provide solutions, and offer suggestions on construction sites to comply with Iowa's current soil erosion and storm water runoff regulations. This need is particularly important when land undergoes a land use change. Information provided in this manual will be helpful to land owners, developers, consultants, contractors, planners, local government, as well as the general public. This manual is intended to provide techniques that will meet the mandates of current legislation. Innovations that will benefit the user and still provide effective control are encouraged.
Resumo:
Background and objective: Optimal care of diabetic patients (DPs) decreases the risk of complications. Close blood glucose monitoring can improve patient outcomes and shorten hospital stay. The objective of this pilot study was to evaluate the treatment of hospitalized DPs according to the current standards, including their diabetic treatment and drugs to prevent diabetes related complications [=guardian drugs: angiotensin converting enzyme inhibitors (ACEI) or Angiotensin II Receptor Blockers (ARB), antiplatelet drugs, statins]. Guidelines of the American Diabetes Association (ADA) [1] were used as reference as they were the most recent and exhaustive for hospital care. Design: Observational pilot study: analysis of the medical records of all DPs seen by the clinical pharmacists during medical rounds in different hospital units. An assessment was made by assigning points for fulfilling the different criteria according to ADA and then by dividing the total by the maximum achievable points (scale 0-1; 1 = all criteria fulfilled). Setting: Different Internal Medicine and Geriatric Units of the (multi-site) Ho^pital du Valais. Main outcome measures: - Completeness of diabetes-related information: type of diabetes, medical history, weight, albuminuria status, renal function, blood pressure, (recent) lipid profile. - Management of blood glucose: Hb1Ac, glycemic control, plan for treating hyper-/hypoglycaemia. - Presence of guardian drugs if indicated. Results: Medical records of 42 patients in 10 different units were analysed (18 women, 24 men, mean age 75.4 ± 11 years). 41 had type 2 diabetes. - Completeness of diabetes-related information: 0.8 ± 0.1. Information often missing: insulin-dependence (43%) and lipid profile (86%). - Management of blood glucose: 0.5 ± 0.2. 15 patients had suboptimal glycemic balance (target glycaemia 7.2-11.2 mmol/ l, with values[11.2 or\3.8 mmol/l, or Hb1Ac[7%), 10 patients had a deregulated balance (more than 10 values[11.2 mmol/l or \3.8 mmol/l and even values[15 mmol/l). - Presence of guardian drugs if indicated: ACEI/ARB: 19 of 23 patients (82.6%), statin: 16 of 40 patients (40%), antiplatelet drug: 16 of 39 patients (41%). Conclusions: Blood glucose control was insufficient in many DPs and prescription of statins and antiplatelet drugs was often missing. If confirmed by a larger study, these two points need to be optimised. As it is not always possible and appropriate to make those changes during hospital stay, a further project should assess and optimise diabetes care across both inpatient and outpatient settings.
Resumo:
Five Seasons Transportation & Parking (FSTP) and the Johnson County Council of Governments (JCCOG) are interested in evaluating the feasibility of prospective passenger rail service(s) that would operate over existing trackage of the Cedar Rapids and Iowa City Railway Company (CRANDIC), seen below left, and/or the Iowa Interstate Railroad System (IAIS), seen below right, connecting Cedar Rapids, Iowa City and the Amana Colonies. To perform the study, FSTP and JCCOG selected R.L. Banks & Associates, Inc. (RLBA) as Prime Contractors, HNTB Corporation (HNTB) and Snyder & Associates, Inc. (Snyder) as Subcontractors, hereafter Consultant Team. Both railroads participated in the study and contributed time and resources, as did many local government and civic organizations. The purpose of the study is to determine whether it is feasible to establish regularly scheduled passenger rail service and/or special event excursion rail service, in conjunction with the Five Seasons Transit system, Iowa City Transit, East Central Iowa Transit, Coralville Transit and the University of Iowa CAMBUS.
Resumo:
The I-74 Iowa-Illinois Corridor Study has been progressing since the last newsletter and the Public Information Meetings in July of 2002, and the Advisory Committee has been involved in every step. Our goal has been and continues to be ensuring that community priorities and goals are reflected in the I-74 project, and that local concerns are considered.
Resumo:
In July 2006, construction began on an accelerated bridge project in Boone County, Iowa that was composed of precast substructure elements and an innovative, precast deck panel system. The superstructure system consisted of full-depth deck panels that were prestressed in the transverse direction, and after installation on the prestressed concrete girders, post-tensioned in the longitudinal direction. Prior to construction, laboratory tests were completed on the precast abutment and pier cap elements. The substructure testing was to determine the punching shear strength of the elements. Post-tensioning testing and verification of the precast deck system was performed in the field. The forces in the tendons provided by the contractor were verified and losses due to the post-tensioning operation were measured. The stress (strain) distribution in the deck panels due to the post-tensioning was also measured and analyzed. The entire construction process for this bridge system was documented. Representatives from the Boone County Engineers Office, the prime contractor, precast fabricator, and researchers from Iowa State University provided feedback and suggestions for improving the constructability of this design.
Resumo:
OBJECTIVES: in a retrospective study, attempts have been made to identify individual organ-dysfunction risk profiles influencing the outcome after surgery for ruptured abdominal aortic aneurysms. METHODS: out of 235 patients undergoing graft replacement for abdominal aortic aneurysms, 57 (53 men, four women, mean age 72 years [s.d. 8.8]) were treated for ruptured aneurysms in a 3-year period. Forty-eight preoperative, 13 intraoperative and 34 postoperative variables were evaluated statistically. A simple multi-organ dysfunction (MOD) score was adopted. RESULTS: the perioperative mortality was 32%. Three patients died intraoperatively, four within 48 h and 11 died later. A significant influence for pre-existing risk factors was identified only for cardiovascular diseases. Multiple linear-regression analysis indicated that a haemoglobin <90 g/l, systolic blood pressure <80 mmHg and ECG signs of ischaemia at admission were highly significant risk factors. The cause of death for patients, who died more than 48 h postoperatively, was mainly MOD. All patients with a MOD score >/=4 died (n=7). These patients required 27% of the intensive-care unit (ICU) days of all patients and 72% of the ICU days of the non-survivors. CONCLUSION: patients with ruptured aortic aneurysms from treatment should not be excluded. However, a physiological scoring system after 48 h appears justifiable in order to decide on the appropriateness of continual ICU support.
Resumo:
The Iowa Department of Transportation (Iowa DOT) currently performs wetland mitigation on a project-by-project basis. At the same time, other agencies like the Iowa Department of Natural Resources and Natural Resource Conservation Service are performing wetland restoration projects, and counties and cities may be mitigating wetland losses as well. This project examined the feasibility of developing cooperative wetland mitigation projects in order to utilize state and local resources more efficiently to benefit both Iowa and local communities. The project accomplished the following objectives: (1) Identified and characterized cooperative wetland mitigation programs nationwide; (2) Developed a needs assessment through a survey of state, county, and large city agencies in Iowa to describe wetland mitigation programs and determine challenges with mitigation and program improvements, including long-term risks associated with maintenance and monitoring programs; (3) Surveyed state, county, and city agencies and organizations to identify resources available for developing cooperative mitigation projects and procedures; (4) Developed a conceptual framework for cooperative wetland mitigation.
Resumo:
Due to limited budgets and reduced inspection staff, state departments of transportation (DOTs) are in need of innovative approaches for providing more efficient quality assurance on concrete paving projects. The goal of this research was to investigate and test new methods that can determine pavement thickness in real time. Three methods were evaluated: laser scanning, ultrasonic sensors, and eddy current sensors. Laser scanning, which scans the surface of the base prior to paving and then scans the surface after paving, can determine the thickness at any point. Also, scanning lasers provide thorough data coverage that can be used to calculate thickness variance accurately and identify any areas where the thickness is below tolerance. Ultrasonic and eddy current sensors also have the potential to measure thickness nondestructively at discrete points and may result in an easier method of obtaining thickness. There appear to be two viable approaches for measuring concrete pavement thickness during the paving operation: laser scanning and eddy current sensors. Laser scanning has proved to be a reliable technique in terms of its ability to provide virtual core thickness with low variability. Research is still required to develop a prototype system that integrates point cloud data from two scanners. Eddy current sensors have also proved to be a suitable alternative, and are probably closer to field implementation than the laser scanning approach. As a next step for this research project, it is suggested that a pavement thickness measuring device using eddy current sensors be created, which would involve both a handheld and paver-mounted version of the device.
Resumo:
This report documents an extensive field program carried out to identify the relationships between soil engineering properties, as measured by various in situ devices, and the results of machine compaction monitoring using prototype compaction monitoring technology developed by Caterpillar Inc. Primary research tasks for this study include the following: (1) experimental testing and statistical analyses to evaluate machine power in terms of the engineering properties of the compacted soil (e.g., density, strength, stiffness) and (2) recommendations for using the compaction monitoring technology in practice. The compaction monitoring technology includes sensors that monitor the power consumption used to move the compaction machine, an on-board computer and display screen, and a GPS system to map the spatial location of the machine. In situ soil density, strength, and stiffness data characterized the soil at various stages of compaction. For each test strip or test area, in situ soil properties were compared directly to machine power values to establish statistical relationships. Statistical models were developed to predict soil density, strength, and stiffness from the machine power values. Field data for multiple test strips were evaluated. The R2 correlation coefficient was generally used to assess the quality of the regressions. Strong correlations were observed between averaged machine power and field measurement data. The relationships are based on the compaction model derived from laboratory data. Correlation coefficients (R2) were consistently higher for thicker lifts than for thin lifts, indicating that the depth influencing machine power response exceeds the representative lift thickness encountered under field conditions. Caterpillar Inc. compaction monitoring technology also identified localized areas of an earthwork project with weak or poorly compacted soil. The soil properties at these locations were verified using in situ test devices. This report also documents the steps required to implement the compaction monitoring technology evaluated.
Resumo:
This report describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices are unable to accomplish these two tasks with any accuracy for linear activities, leaving planners and manager suspicious of the information they provide. Basic linear scheduling is not a new technique, and many attempts have been made to apply it to various types of work in the past. However, the technique has never been widely used because of the lack of an analytical approach to activity relationships and development of an analytical approach to determining controlling activities. The Linear Scheduling Model (LSM) developed in this report, completes the linear scheduling technique by adding to linear scheduling all of the analytical capabilities, including computer applications, present in CPM scheduling today. The LSM has tremendous potential, and will likely have a significant impact on the way linear construction is scheduled in the future.
Resumo:
This report describes the continuation of the development of performance measures for the Iowa Department of Transportation (DOT) Offices of Construction. Those offices are responsible for administering transportation construction projects for the Iowa DOT. Researchers worked closely with the Benchmark Steering Team which was formed during Phase I of this project and is composed of representatives of the Offices of Construction. The research team conducted a second survey of Offices of Construction personnel, interviewed numerous members of the Offices and continued to work to improve the eight key processes identified during Phase I of this research. The eight key processes include Inspection of Work, Resolution of Technical Issues, Documentation of Work Progress and Pay Quantities, Employee Training and Development, Continuous Feedback for Improved Contract Documents, Provide Safe Traffic Control, External/Public Communication, and Providing Pre-Letting Information. Three to four measurements were specified for each key process. Many of these measurements required opinion surveys of employees, contractors, and others. During Phase II, researchers concentrated on conducting surveys, interviewing respondents to improve future surveys, and facilitating Benchmark Steering Team monthly meetings. Much effort was placed on using the information collected during the first year's research to improve the effectiveness and efficiency of the Offices of Construction. The results from Process Improvement Teams that studied Traffic Control and Resolution of Technical Issues were used to improve operations.
Resumo:
This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.