Successful construction project managers often stress the importance of team working, relationship management, project environment and senior management commitment as being key determinants of project success. However, it is generally accepted that the construction industry has stronger preference for displaying distrust rather than emancipating the full benefits of cooperation. In the research domain, the impact of culture and organisation on project performance is becoming an increasingly important topic for the establishment of a sound relational approach to projects. Relational procurement strategies emphasise the importance of sustainable relationships. However, the efficacy of relational contracting is, so far, unproven. This study examines the organisational factors that facilitates sustainable relationship between project organisations and hence, lead to long-term business success. Initial findings captured from a survey undertaken with construction contracting organisations in Australia, where the perceptions of professional personnel and supply chain relationships are reported in this paper. A four-level project performance effectiveness model developed in this research is also presented.
Resumo:
The need to better understand and deal with workplace stress has major implications for the construction industry, especially on a project level, because of its potential to directly impact on site productivity and safety, and ultimately, the achievement of project objectives. While there has been some understanding of the effect of workplace stress within the construction industry, the majority of these studies have explored individual determinants of workplace stress among construction professionals such as architects, engineers, quantity surveyors etc. To date, very little research has focused on workplace stress as encountered by construction site operatives. This is an important research deficiency as construction site operatives typically make up a significant percentage of on-site workforce and contribute most directly to project success. To address this imbalance in research, this paper proposes a theoretical framework to better understand site operatives’ experience of stress from a cultural perspective on three levels: individual, project and organizational which has been largely neglected in previous studies.
Resumo:
Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.
Supply chain sustainability : a relationship management approach moderated by culture and commitment
Resumo:
This research explores the nature of relationship management on construction projects in Australia and examines the effects of culture, by means of Schwarz’s value survey, on relationships under different contract strategies. The research was based on the view that the development of a sustainable supply chain depends on the transfer of knowledge and capabilities from the larger players in the supply chain through collaboration brought about by relationship management. The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the findings. The aim was to investigate how values and attitudes enhance or reduce the incorporation of the supply chain into the project. From the research it was found that the degree of match and mismatch between values and contract strategy impacts commitment and the engagement and empowerment of the supply chain.
Resumo:
Many studies carried out in relation to construction procurement methods reveal evidence of a need to change of culture and attitude in the construction industry. This culture change would transition from traditional adversarial relationships to cooperative and collaborative relationships. Relational contracting approaches, such as partnering and relationship management, are business strategies whereby client, commercial participants’ and stakeholders’ objectives are aligned for mutual benefit. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a slow implementation of relational contracting down the value chain. This paper reports the findings of an empirical study which examined the practices and prerequisites for relationship management implementation success and for supply chain engagement to develop. Questionnaire survey, interviews and case studies were conducted with Australian contracting organisations in this study. The study reveals that the adaption of relational contracting approach in the supply chain is found to be limited and contractors still prefer to keep suppliers and subcontractors at arm’s length. Findings also show that the degree of match and mismatch between organizational structuring and organizational process is found to have an impact on staff’s commitment level and performance effectiveness.
Resumo:
In this research we examined, by means of case studies, the mechanisms by which relationships can be managed and by which communication and cooperation can be enhanced in developing sustainable supply chains. The research was predicated on the contention that the development of a sustainable supply chain depends, in part, on the transfer of knowledge and capabilities from the larger players in the supply chain. A sustainable supply chain requires proactive relationship management and the development of an appropriate organisational culture, and trust. By legitimising individuals’ expectations of the type of culture which is appropriate to their company and empowering employees to address mismatches that may occur, a situation can be created whereby the collaborating organisations develop their competences symbiotically and so facilitate a sustainable supply chain. Effective supply chain management enhances organisation performance and competitiveness through the management of operations across organisational boundaries. Relational contracting approaches facilitate the exchange of information and knowledge and build capacity in the supply chain, thus enhancing its sustainability. Relationship management also provides the conditions necessary for the development of collaborative and cooperative relationships However, often subcontractors and suppliers are not empowered to attend project meetings or to have direct communication with project based staff. With this being a common phenomenon in the construction industry, one might ask: what are the barriers to implementation of relationship management through the supply chain? In other words, the problem addressed in this research is the engagement of the supply chain through relationship management.
Resumo:
Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the fi ndings of an empirical study that compares the level of agreement between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the agreement level between project managers and stakeholders. While the overall agreement level between project manager and stakeholders is medium, results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.
Resumo:
Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.
Supply chain sustainability : a relationship management approach moderated by culture and commitment
Resumo:
This paper explores the nature of relationship management on construction projects in Australia and examines the effects of culture, by means of Schwarz’s value survey, on relationships under different contract strategies. The research was based on the view that the development of a sustainable supply chain depends on the transfer of knowledge and capabilities from the larger players in the supply chain through collaboration brought about by relationship management. The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the fi ndings. The aim was to investigate how values and attitudes enhance or reduce the incorporation of the supply chain into the project. From the research it was found that the degree of match and mismatch between values and contract strategy impacts commitment and the engagement and empowerment of the supply chain.
Resumo:
Despite promising benefits and advantages, there are reports of failures and low realisation of benefits in Enterprise System (ES) initiatives. Among the research on the factors that influence ES success, there is a dearth of studies on the knowledge implications of multiple end-user groups using the same ES application. An ES facilitates the work of several user groups, ranging from strategic management, management, to operational staff, all using the same system for multiple objectives. Given the fundamental characteristics of ES – integration of modules, business process views, and aspects of information transparency – it is necessary that all frequent end-users share a reasonable amount of common knowledge and integrate their knowledge to yield new knowledge. Recent literature on ES implementation highlights the importance of Knowledge Integration (KI) for implementation success. Unfortunately, the importance of KI is often overlooked and little about the role of KI in ES success is known. Many organisations do not achieve the potential benefits from their ES investment because they do not consider the need or their ability to integrate their employees’ knowledge. This study is designed to improve our understanding of the influence of KI among ES end-users on operational ES success. The three objectives of the study are: (I) to identify and validate the antecedents of KI effectiveness, (II) to investigate the impact of KI effectiveness on the goodness of individuals’ ES-knowledge base, and (III) to examine the impact of the goodness of individuals’ ES-knowledge base on the operational ES success. For this purpose, we employ the KI factors identified by Grant (1996) and an IS-impact measurement model from the work of Gable et al. (2008) to examine ES success. The study derives its findings from data gathered from six Malaysian companies in order to obtain the three-fold goal of this thesis as outlined above. The relationships between the antecedents of KI effectiveness and its consequences are tested using 188 responses to a survey representing the views of management and operational employment cohorts. Using statistical methods, we confirm three antecedents of KI effectiveness and the consequences of the antecedents on ES success are validated. The findings demonstrate a statistically positive impact of KI effectiveness of ES success, with KI effectiveness contributing to almost one-third of ES success. This research makes a number of contributions to the understanding of the influence of KI on ES success. First, based on the empirical work using a complete nomological net model, the role of KI effectiveness on ES success is evidenced. Second, the model provides a theoretical lens for a more comprehensive understanding of the impact of KI on the level of ES success. Third, restructuring the dimensions of the knowledge-based theory to fit the context of ES extends its applicability and generalisability to contemporary Information Systems. Fourth, the study develops and validates measures for the antecedents of KI effectiveness. Fifth, the study demonstrates the statistically significant positive influence of the goodness of KI on ES success. From a practical viewpoint, this study emphasises the importance of KI effectiveness as a direct antecedent of ES success. Practical lessons can be drawn from the work done in this study to empirically identify the critical factors among the antecedents of KI effectiveness that should be given attention.
Resumo:
Even though titanium dioxide photocatalysis has been promoted as a leading green technology for water purification, many issues have hindered its application on a large commercial scale. For the materials scientist the main issues have centred the synthesis of more efficient materials and the investigation of degradation mechanisms; whereas for the engineers the main issues have been the development of appropriate models and the evaluation of intrinsic kinetics parameters that allow the scale up or re-design of efficient large-scale photocatalytic reactors. In order to obtain intrinsic kinetics parameters the reaction must be analysed and modelled considering the influence of the radiation field, pollutant concentrations and fluid dynamics. In this way, the obtained kinetic parameters are independent of the reactor size and configuration and can be subsequently used for scale-up purposes or for the development of entirely new reactor designs. This work investigates the intrinsic kinetics of phenol degradation over titania film due to the practicality of a fixed film configuration over a slurry. A flat plate reactor was designed in order to be able to control reaction parameters that include the UV irradiance, flow rates, pollutant concentration and temperature. Particular attention was paid to the investigation of the radiation field over the reactive surface and to the issue of mass transfer limited reactions. The ability of different emission models to describe the radiation field was investigated and compared to actinometric measurements. The RAD-LSI model was found to give the best predictions over the conditions tested. Mass transfer issues often limit fixed film reactors. The influence of this phenomenon was investigated with specifically planned sets of benzoic acid experiments and with the adoption of the stagnant film model. The phenol mass transfer coefficient in the system was calculated to be km,phenol=8.5815x10-7Re0.65(ms-1). The data obtained from a wide range of experimental conditions, together with an appropriate model of the system, has enabled determination of intrinsic kinetic parameters. The experiments were performed in four different irradiation levels (70.7, 57.9, 37.1 and 20.4 W m-2) and combined with three different initial phenol concentrations (20, 40 and 80 ppm) to give a wide range of final pollutant conversions (from 22% to 85%). The simple model adopted was able to fit the wide range of conditions with only four kinetic parameters; two reaction rate constants (one for phenol and one for the family of intermediates) and their corresponding adsorption constants. The intrinsic kinetic parameters values were defined as kph = 0.5226 mmol m-1 s-1 W-1, kI = 0.120 mmol m-1 s-1 W-1, Kph = 8.5 x 10-4 m3 mmol-1 and KI = 2.2 x 10-3 m3 mmol-1. The flat plate reactor allowed the investigation of the reaction under two different light configurations; liquid and substrate side illumination. The latter of particular interest for real world applications where light absorption due to turbidity and pollutants contained in the water stream to be treated could represent a significant issue. The two light configurations allowed the investigation of the effects of film thickness and the determination of the catalyst optimal thickness. The experimental investigation confirmed the predictions of a porous medium model developed to investigate the influence of diffusion, advection and photocatalytic phenomena inside the porous titania film, with the optimal thickness value individuated at 5 ìm. The model used the intrinsic kinetic parameters obtained from the flat plate reactor to predict the influence of thickness and transport phenomena on the final observed phenol conversion without using any correction factor; the excellent match between predictions and experimental results provided further proof of the quality of the parameters obtained with the proposed method.
Resumo:
Background Canonical serine protease inhibitors commonly bind to their targets through a rigid loop stabilised by an internal hydrogen bond network and disulfide bond(s). The smallest of these is sunflower trypsin inhibitor (SFTI-1), a potent and broad-range protease inhibitor. Recently, we re-engineered the contact β-sheet of SFTI-1 to produce a selective inhibitor of kallikrein-related peptidase 4 (KLK4), a protease associated with prostate cancer progression. However, modifications in the binding loop to achieve specificity may compromise structural rigidity and prevent re-engineered inhibitors from reaching optimal binding affinity. Methodology/Principal Findings In this study, the effect of amino acid substitutions on the internal hydrogen bonding network of SFTI were investigated using an in silico screen of inhibitor variants in complex with KLK4 or trypsin. Substitutions favouring internal hydrogen bond formation directly correlated with increased potency of inhibition in vitro. This produced a second generation inhibitor (SFTI-FCQR Asn14) which displayed both a 125-fold increased capacity to inhibit KLK4 (Ki = 0.0386±0.0060 nM) and enhanced selectivity over off-target serine proteases. Further, SFTI-FCQR Asn14 was stable in cell culture and bioavailable in mice when administered by intraperitoneal perfusion. Conclusion/Significance These findings highlight the importance of conserving structural rigidity of the binding loop in addition to optimising protease/inhibitor contacts when re-engineering canonical serine protease inhibitors.
Resumo:
This article will consider the role that Alternative Dispute Resolution (‘Dham Kha Chen Ki Khendum’ or ‘Nangkha Nangdrik’) currently plays in resolving legal conflict in Bhutan. With a Constitution that has committed to the pursuit of Gross National Happiness, non-adversarial dispute resolution processes that promote continuing relationships and goodwill assume greater importance. One difficulty for Bhutan is that alternative dispute resolution procedures such as mediation (Dhum Drik) are being referred to in enactments of the Bhutanese National Council and National Assembly (bicameral parliament), without a shared understanding as to the characteristics and functionality of these procedures. This article will focus particularly on the current practice of mediation in Bhutan and investigate whether particular models of mediation are more suited to the Bhutanese context, given the particularities of Bhutanese culture, the search for gross national happiness, psychological understandings of happiness and the omnipresent influence of Mahayana Buddhism.
Resumo:
Islamic financing in Indonesia infrastructure projects development has not been optimally implemented. Therefore this paper serves as a catalyst to explore alternative financial scheme such as Islamic financing for infrastructure development. The purpose of this paper is to explore the enablers and barriers in implementing Islamic project financing for public infrastructure development. The findings are then culminated into enablers and barriers in the implementation of Islamic project financing. The two main enablers are the readily availability of huge fund that can be used to support infrastructure projects; and the acceptability of the concept of shariah-compliant financing. On the other hand, the barriers include: high cost of funding; lack of financial institution capability; lack of government policy and regulation; insufficient government support and commitment; conflict between infrastructure and Islamic finance business practices; profit oriented mindset; lack of understanding of Islamic project financing knowledge in infrastructure; and insufficient project preparation.
Resumo:
Building Information Modelling (BIM) appears to be the next evolutionary link in project delivery within the AEC (Architecture, Engineering and Construction) Industry. There have been several surveys of implementation at the local level but to date little is known of the international context. This paper is a preliminary report of a large scale electronic survey of the implementation of BIM and the impact on AEC project delivery and project stakeholders in Australia and internationally. National and regional patterns of BIM usage will be identified. These patterns will include disciplinary users, project lifecycle stages, technology integration–including software compatibility—and organisational issues such as human resources and interoperability. Also considered is the current status of the inclusion of BIM within tertiary level curricula and potential for the creation of a new discipline.