836 resultados para Multidisciplinary projects
Resumo:
The aim of this paper is examine how firms renew their organisational capabilities based on micro organisational processes. Organisational capability development literature points to firms’ failure in capability renewal process. To overcome this inefficiency, it is proposed to integrate dynamic capability and ambidexterity perspectives by studying knowledge integration within product innovation. In this relation, applying micro perspective in studying technology diffusion within Iranian Auto industry revealed micro co-evolutionary relationships between knowledge integration within product innovation and capability development. Furthermore, based on near decomposability principals, the analysis suggested relationships among modularity of product architecture, modularity of organisational modularity and modularity of industry architecture in downstream and upstream value chain. Based on these micro-macro co evolutionary effects, capability development process underlying successful corporate entrepreneurship may be verified.
Resumo:
This paper aims to address the knowledge gap in regards to the potential intermediary role tertiary institutions can play in developing generic design thinking/design led innovation capabilities in non-designers. Specifically, it investigates the value derived from the contribution of postgraduate design students as facilitators/educators for undergraduate non-design student cohorts. It examines a design immersion workshop designed to encourage the use of design thinking capabilities for project brief development for undergraduate multi-disciplinary student teams involved in a community service learning project for a social enterprise. The workshop was facilitated by design led innovation masters students embedded in industry organisations to research the integration of design led innovation capabilities in business. Data was collected from participating non-design students and postgraduate facilitators’ in the form of reflective journals and semi-structured interviews. The thematic analysis provided insight into the value of design thinking/design led innovation immersion programs for both the postgraduate facilitators and the undergraduate non-design students. The research results will inform a tentative foundation prototype framework to allow for ongoing program developments and research in design thinking/design led innovation integration in higher education, facilitating the development of generic capabilities required to empower future generations for business innovation and active citizenship in the 21st century knowledge economy.
Resumo:
In 1999, power electronics laboratory practicals were isolated two-hour sessions with only nominal assessment. Students were unmotivated, and didn’t prepare for or subsequently review these sessions. The pracs were rushed, and students’ actions task oriented. Learning was shallow at best. In 2000, the practical component was changed to two projects, each spanning four weeks. The projects were larger, linked, real world problems, tackled by groups of three students. Assessment was via individual workbooks kept during the project, a group demonstration of the working project by all members, and a subsequent written report. These projects were highly successful in motivating the students, and achieved the transfer of the theory presented in lectures into personal practical understanding of that material. These outcomes were judged by observations of the class, project and exam marks, and responses to a questionnaire given at the conclusion of the semester.
Resumo:
The market of building retrofits is increasingly more intensified as existing buildings are aging. The building retrofit projects involve existing buildings which impose constraints on stakeholders throughout the project process. They are also risky, complex, less predictable and difficult to be well planned with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors, but they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. This paper first discusses the requirements of waste management in building retrofit projects considering specific project characteristics and work natures, and highlights the importance of involving SMEs in waste planning and management through an appropriate way. By utilizing semi-structured interviews, this research develops a process model for SMEs to be applied in waste management. A collaboration scenario is also developed for collaborative waste planning and management by SMEs as subcontractors and large companies as main contractors. Findings from the paper will promote coordination of project delivery and waste management in building retrofit projects, and improve the involvement and performance of SMEs in dealing with waste problems.
Resumo:
Purpose - Cultural issues in the construction industry have attracted growing attention from both practitioners and academia. However, there are few studies on culture issues at the project level. The influence of project culture has not traditionally been on the research radar. This research aims to investigate the impacts of project culture on the performance of construction projects. Design/methodology/approach - A case study approach, utilising questionnaire surveys, in-depth interviews and review of project documents, was employed to investigate project culture and its associated impacts in two major hospital projects. Findings - The results indicated that project culture played an important role in achieving harmonious relationships between project participants and better project outcomes in terms of schedule, functionality, satisfaction with the process, satisfaction with the relationships, environmental issues addressed commercial success, further business opportunities and overall performance. Case 1 outperformed Case 2 in these performance indicators. Similarly, it became clear that the project’s culture should be developed from the outset and sustained during the project period. Furthermore, it was also highlighted that the project culture should be translated to all levels of the supply chain i.e. sub-contractors and suppliers. Practical implications – The findings enabled the client to understand the role of project culture and actively commit towards the development and maintenance of the project culture from very early on. It also helps project teams to understand how to deal with cultural issues at the project level. Originality/value- This study is one of limited empirical studies that offer in-depth insights of how project culture affects the performance of construction projects. It is also the first study of hospital projects on the research topic.
Resumo:
With unpredictable workloads and a need for a multitude of specialized skills, many main contractors rely heavily on subcontracting to reduce their risks (Bresnen et al., 1985; Beardsworth et al., 1988). This is especially the case In Hong Kong, where the average direct labour content accounts for only around 1% of the total contract sum (Lai, 1987). Extensive usage of subcontracting is also reported in many other countries, including the UK (Gray and Flanagan, 1989) and Japan (Bennett et al., 1987). In addition, and depending upon the scale and complexity of works, it is not uncommon for subcontractors to further sublet their works to lower tier(s) subcontractors. Richter and Mitchell (1982) argued that main contractors can obtain a higher profit margin by reducing their performance costs by subcontracting work to those who have the necessary resources to perform the work more efficiently and economically. Subcontracting is also used strategically to allow firms to employ a minimum work force under fluctuating demand (Usdiken and Sözen, 1985). Through subcontracting, the risks of main contractors are also reduced, as errors in estimating or additional costs caused by delays or extra labour requirements can be absorbed by the subcontractors involved (Woon and Ofori, 2000). Despite these benefits, the quality of work can suffer when incapable or inexperienced subcontractors are employed. Additional problems also exist in the form of bid shopping, unclear accountability, and high fragmentation (Palaneeswaran et al., 2002). A recent CIB TG 23 International Conference, October 2003, Hong Kong report produced by the Hong Kong Construction Industry Review Committee (CIRC) points to development of a framework to help distinguish between capable and incapable subcontractors (Tang, 2001). This paper describes research aims at identifying and prioritising criteria for use in such a framework.
Resumo:
In recent years there has been a noticeable move by various public institutions, such as public service broadcasters and community media organisations, to capture and disseminate the voices and viewpoints of ‘ordinary people’ through inviting them to share stories about their lives. One of the foremost objectives of many such projects is to provide under-represented individuals and groups with an opportunity to express and represent themselves; as such, the capture and broadcast of ‘authentic voices’ is a central value. This paper discusses the notion of ‘authentic voice’, and questions the framing role of public media organisations in storytelling projects that aim to provide individuals with space for self-expression and self-representation. It considers the ways in which tensions arise on multiple levels when individuals are asked to express and represent themselves within projects and spaces that are managed by institutions. This paper begins by discussing the challenges and opportunities that arise within storytelling projects that are facilitated by public institutions and community media arts organisations, and that aim to amplify the voices of “ordinary people” (Thumim, 2009). It examines ways in which ‘voice’ is facilitated, curated, broadcast and distributed within such projects, particularly questioning the ways in which project facilitation and the curation of stories for public broadcast can both help and hinder the amplification of ‘authentic voice’. Furthermore, we seek to discuss how ‘authentic voice’ is defined, and what is involved in the process of amplification. The paper moves on to discuss a case study in order to demonstrate some of the tensions that are evident within a storytelling project that is managed by a public institution – Australia’s national broadcaster – and the ways these tensions impact upon the capture and broadcast of an ‘authentic voice’ for project participants. The Australian Broadcasting Corporation’s (ABC) ‘Heywire’ project is a storytelling competition and website that aims to ‘give voice’ to 16-22 year olds who live in rural, regional and remote parts of Australia. Looking at tensions that exist on organisational, political and philosophical levels within the Heywire project reveals a number of conflicts of interest and objectives between the institution and project participants. This leads us to question whether institutionally-managed storytelling projects can effectively support individuals to have an ‘authentic voice’, and whether struggles of aims and objectives diminish the personal benefits that people may derive from expressing and representing themselves within such projects.
Resumo:
It is well-known that the use of off-site manufacture (OSM) techniques can assist in timely completion of a construction project though the utilisation of such techniques may have other disadvantages. Currently, OSM uptake within the Australian construction industry is limited. To successfully incorporate OSM practices within a construction project, it is crucial to understand the impact of OSM adoption on the processes used during a construction project. This paper presents how a systematic process-oriented approach may be able to support OSM utilisation within a construction project. Process modelling, analysis and automation techniques which are well-known within the Business Process Management (BPM) discipline have been applied to develop a collection of construction process models that represent the end-to-end generic construction value chain. The construction value chain enables researchers to identify key activities, resources, data, and stakeholders involved in construction processes in each defined construction phase. The collection of construction process models is then used as a basis for identification of potential OSM intervention points in collaboration with domain experts from the Australian construction industry. This ensures that the resulting changes reflect the needs of various stakeholders within the construction industry and have relevance in practice. Based on the input from the domain experts, these process models are further refined and operational requirements are taken into account to develop a prototype process automation (workflow) system that can support and coordinate OSM-related process activities. The resulting workflow system also has the potential to integrate with other IT solutions used within the construction industry (e.g., BIM, Acconex). As such, the paper illustrates the role that process-oriented thinking can play in assisting OSM adoption within the industry.
Resumo:
Objective This investigation utilised the expertise of allied members of multidisciplinary teams working in emergency care settings to develop and validate a Rapid Assessment Prioritisation and Referral Tool (RAPaRT). This instrument is intended for use among patients (with non-life threatening acuity) presenting to emergency care settings to indicate when referral to an allied member of the multidisciplinary team is warranted. Method This three stage instrument development and validation study included: a Delphi panel process to determine key criteria to guide instrument development and identify potential items to be carried forward for testing (stage 1); a prospective cohort of consecutive admissions (n=153) to investigate item sensitivity and specificity and retain only the most suitable items (stage 2); then final consultation with the Delphi panel to ensure the final instrument was clinically amenable (stage 3). Results 23 potential items were identified following stage 1. At the completion of item sensitivity and specificity analysis and in consultation with the Delphi panel, seven items were retained in the instrument. Area under the receiver operating characteristic curve was 0.803 for these seven items in predicting when a referral was warranted. Final consultation with the Delphi panel members also resulted in the addition of an open ended (eighth) item to allow description of any infrequent, but important, reason for referral. Conclusions The RAPaRT has demonstrated substantial promise as an efficient clinically amenable instrument to assist multidisciplinary teams in emergency care settings. Further research to investigate the wider implementation of the RAPaRT is warranted.
Resumo:
Cyclone Yasi struck the Cassowary Coast of Northern Queensland, Australia, in the early hours of February 3, 2011, destroying many homes and property, including the destruction of the Cardwell and district historical society’s premises. With their own homes flattened, many residents were forced to live in mobile accommodation, with extended family, or leave the area altogether. The historical society members seemed, however, particularly devastated by their flattened foreshore museum and loss of their precious collection of material. A call for assistance was made through the Oral History Association of Australia’s Queensland branch (OHAA Qld), which along with a Queensland University of Technology (QUT) research team sponsored a trip to best plan how they could start to pick up the pieces to rebuild the museum. This chapter highlights the need for communities to gather, preserve and present their own stories, in a way that is sustainable and meaningful to them – whether that be because of a disaster, or as they go about life in their contemporary communities – the key being that good advice, professional support and embedded evaluation practices at crucial moments along the way can be critically important.
Resumo:
Collaborative infrastructure projects use hybrid formal and informal governance structures to manage transactions. Based on previous desk-top research, the authors identified the key mechanisms underlying project governance, and posited the performance implications of the governance (Chen et al. 2012). The current paper extends that qualitative research by testing the veracity of those findings using data from 320 Australian construction organisations. The results provide, for the first time, reliable and valid scales to measure governance and performance of collaborative projects, and the relationship between them. The results confirm seven of seven hypothesised governance mechanisms; 30 of 43 hypothesised underlying actions; eight of eight hypothesised key performance indicators; and the dual importance of formal and informal governance. A startling finding of the study was that the implementation intensity of informal mechanisms (non-contractual conditions) is a greater predictor of project performance variance than that of formal mechanisms (contractual conditions). Further, contractual conditions do not directly impact project performance; instead their impact is mediated by the non-contractual features of a project. Obligations established under the contract are not sufficient to optimise project performance.
Resumo:
Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.
Resumo:
BACKGROUND Research on engineering design is a core area of concern within engineering education and a fundamental understanding of how engineering students approach and undertake design is necessary in order to develop effective design models and pedagogies. Understanding the factors related to design experiences in education and how they affect student practice can help educators as well as designers to leverage these factors as part of the design process. PURPOSE This study investigated the design practices of first-year engineering students’ and their experiences with a first-year engineering course design project. The research questions that guided the investigation were: 1. From a student perspective, what design parameters or criteria are most important? 2. How does this perspective impact subsequent student design practice throughout the design process? DESIGN/METHOD The authors employed qualitative multi-case study methods (Miles & Huberman, 1994) in order to the answer the research questions. Participant teams were observed and video recorded during team design meetings in which they researched the background for the design problem, brainstormed and sketched possible solutions, as well as built prototypes and final models of their design solutions as part of a course design project. Analysis focused on explanation building (Yin, 2009) and utilized within-case and cross-case analysis (Miles & Huberman, 1994). RESULTS We found that students focused disproportionally on the functional parameter, i.e. the physical implementation of their solution, and the possible/applicable parameter, i.e. a possible and applicable solution that benefited the user, in comparison to other given parameters such as safety and innovativeness. In addition, we found that individual teams focused on the functional and possible/ applicable parameters in early design phases such as brainstorming/ ideation and sketching. When prompted to discuss these non-salient parameters (from the student perspective) in the final design report, student design teams often used a post-hoc justification to support how the final designs fit the parameters that they did not initially consider. CONCLUSIONS This study suggests is that student design teams become fixated on (and consequently prioritize) certain parameters they interpret as important because they feel these parameters were described more explicitly in terms how they were met and assessed. Students fail to consider other parameters, perceived to be less directly assessable, unless prompted to do so. Failure to consider other parameters in the early design phases subsequently affects their approach in design phases as well. Case studies examining students’ study strategies within three Australian Universities illustrate similarities with some student approaches to design.
Resumo:
The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.