679 resultados para Infrastructure Projects, International Construction, Australia, China


Relevância:

50.00% 50.00%

Publicador:

Resumo:

The relevance of renewable energy has grown significantly in our global society. Important efforts are oriented to sustain it. Renewable energy depends on different technical, financial environmental and social complex processes. From the point of view of industrial construction sector this research evaluates some of the current trends in energy generation and use in Venezuela as well as environmental consequences and risks that derive from these. Additionally, authors highlight the importance of infrastructure as key issue to sustain renewable energy generation and use. The study present references of some energy renewable projects in process in Venezuela and the main problems that constrain their performance. Conclusions evidence the complex nature of industrial construction and suggest the need to improve industrial construction competitivenes as a strategy oriented to enhance renewable energy offer in the country. Additionally it is proposed to all stakeholders to work toghether to correct the conditions that currently limit industrial construction development. This is part of ongoing research.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

La comparación de las diferentes ofertas presentadas en la licitación de un proyecto,con el sistema de contratación tradicional de medición abierta y precio unitario cerrado, requiere herramientas de análisis que sean capaces de discriminar propuestas que teniendo un importe global parecido pueden presentar un impacto económico muy diferente durante la ejecución. Una de las situaciones que no se detecta fácilmente con los métodos tradicionales es el comportamiento del coste real frente a las variaciones de las cantidades realmente ejecutadas en obra respecto de las estimadas en el proyecto. Este texto propone abordar esta situación mediante un sistema de análisis cuantitativo del riesgo como el método de Montecarlo. Este procedimiento, como es sabido, consiste en permitir que los datos de entrada que definen el problema varíen unas funciones de probabilidad definidas, generar un gran número de casos de prueba y tratar los resultados estadísticamente para obtener los valores finales más probables,con los parámetros necesarios para medir la fiabilidad de la estimación. Se presenta un modelo para la comparación de ofertas, desarrollado de manera que puede aplicarse en casos reales aplicando a los datos conocidos unas condiciones de variación que sean fáciles de establecer por los profesionales que realizan estas tareas. ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. One situation not easily detected by traditional methods is the reaction of the actual cost to the changes in the exact quantity of works finally executed respect of the work estimated in the project. This paper intends to address this situation through the Monte Carlo method, a system of quantitative risk analysis. This procedure, as is known, is allows the input data defining the problem to vary some within well defined probability functions, generating a large number of test cases, the results being statistically treated to obtain the most probable final values, with the rest of the parameters needed to measure the reliability of the estimate. We present a model for the comparison of bids, designed in a way that it can be applied in real cases, based on data and assumptions that are easy to understand and set up by professionals who wish to perform these tasks.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Gazprom is determined to continue its efforts to build the South Stream gas pipeline regardless of the slump on the European gas market and the fact that there is sufficient capacity already in the existing transport infrastructure. The official inauguration of the maritime section of South Stream was held on 7 December this year, but the construction itself will commence in 2014. The agreements concluded so far, both intergovernmental and between corporations, are necessary for the launch of the construction of the new pipeline, but still do not guarantee that the project will be completed on time. First of all, some legal problems have yet to be resolved, such as the evaluation of the compliance of the planned actions with the ‘third energy package’ or the fact that ecological surveys required under European law need to be carried out. Secondly, given the present situation on the European gas market and medium-term forecasts, the high cost of implementation of this project and the maintenance expenses of existing pipelines – which are not being used to full capacity – the new project seems to be unfeasible. However, Gazprom’s determination in its efforts to build the pipeline proves that Russia is ready to take a high economic risk to maintain its dominant position on the European gas supply market; it will restrict the possibilities of alternative infrastructural projects being implemented (above all, the EU’s Southern Corridor) and use the construction of new pipelines as an instrument of political pressure on the present transit countries (especially Ukraine).

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Paediatric emergency research is hampered by a number of barriers that can be overcome by a multicentre approach. In 2004, an Australia and New Zealand-based paediatric emergency research network was formed, the Paediatric Research in Emergency Departments International Collaborative (PREDICT). The founding sites include all major tertiary children’s hospital EDs in Australia and New Zealand and a major mixed ED in Australia. PREDICT aims to provide leadership and infrastructure for multicentre research at the highest standard, facilitate collaboration between institutions, health-care providers and researchers and ultimately improve patient outcome. Initial network-wide projects have been determined. The present article describes the development of the network, its structure and future goals.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

To foster ongoing international cooperation beyond ACES (APEC Cooperation for Earthquake Simulation) on the simulation of solid earth phenomena, agreement was reached to work towards establishment of a frontier international research institute for simulating the solid earth: iSERVO = International Solid Earth Research Virtual Observatory institute (http://www.iservo.edu.au). This paper outlines a key Australian contribution towards the iSERVO institute seed project, this is the construction of: (1) a typical intraplate fault system model using practical fault system data of South Australia (i.e., SA interacting fault model), which includes data management and editing, geometrical modeling and mesh generation; and (2) a finite-element based software tool, which is built on our long-term and ongoing effort to develop the R-minimum strategy based finite-element computational algorithm and software tool for modelling three-dimensional nonlinear frictional contact behavior between multiple deformable bodies with the arbitrarily-shaped contact element strategy. A numerical simulation of the SA fault system is carried out using this software tool to demonstrate its capability and our efforts towards seeding the iSERVO Institute.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Privity of contract has lately been criticized in several European jurisdictions, particu-larly due to the onerous consequences it gives rise to in arrangements typical for the modern exchange such as chains of contracts. Privity of contract is a classical premise of contract law, which prohibits a third party to acquire or enforce rights under a contract to which he is not a party. Such a premise is usually seen to be manifested in the doctrine of privity of contract developed under common law, however, the jurisdictions of continental Europe do recognize a corresponding starting point in contract law. One of the traditional industry sectors affected by this premise is the construction industry. A typical large construction project includes a contractual chain comprised of an employer, a main contractor and a subcontractor. The employer is usually dependent on the subcontractor's performance, however, no contractual nexus exists between the two. Accordingly, the employer might want to circumvent the privity of contract in order to reach the subcontractor and to mitigate any risks imposed by such a chain of contracts. From this starting point, the study endeavors to examine the concept of privity of con-tract in European jurisdictions and particularly the methods used to circumvent the rule in the construction industry practice. For this purpose, the study employs both a com-parative and a legal dogmatic method. The principal aim is to discover general principles not just from a theoretical perspective, but from a practical angle as well. Consequently, a considerable amount of legal praxis as well as international industry forms have been used as references. The most important include inter alia the model forms produced by FIDIC as well as Olli Norros' doctoral thesis "Vastuu sopimusketjussa". According to the conclusions of this study, the four principal ways to circumvent privity of contract in European construction projects include liability in a chain of contracts, collateral contracts, assignment of rights as well as security instruments. The contempo-rary European jurisdictions recognize these concepts and the references suggest that they are an integral part of the current market practice. Despite the fact that such means of circumventing privity of contract raise a number of legal questions and affect the risk position of particularly a subcontractor considerably, it seems that the impairment of the premise of privity of contract is an increasing trend in the construction industry.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Introduction. The ToLigado Project - Your School Interactive Newspaper is an interactive virtual learning environment conceived, developed, implemented and supported by researchers at the School of the Future Research Laboratory of the University of Sao Paulo, Brazil. Method. This virtual learning environment aims to motivate trans-disciplinary research among public school students and teachers in 2,931 schools equipped with Internet-access computer rooms. Within this virtual community, students produce collective multimedia research documents that are immediately published in the portal. The project also aims to increase students' autonomy for research, collaborative work and Web authorship. Main sections of the portal are presented and described. Results. Partial results of the first two years' implementation are presented and indicate a strong motivation among students to produce knowledge despite the fragile hardware and software infrastructure at the time. Discussion. In this new environment, students should be seen as 'knowledge architects' and teachers as facilitators, or 'curiosity managers'. The ToLigado portal may constitute a repository for future studies regarding student attitudes in virtual learning environments, students' behaviour as 'authors', Web authorship involving collective knowledge production, teachers' behaviour as facilitators, and virtual learning environments as digital repositories of students' knowledge construction and social capital in virtual learning communities.

Relevância:

40.00% 40.00%

Publicador:

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Motor vehicle crashes are the leading cause of injury death for international tourists. This makes road safety an important issue for tourism authorities. Unfortunately, as it is in other areas of tourist health, the common response from the travel and tourism industry is to remain silent about this problem and to leave any mishaps in the hands of insurers. At the same time, but for different reasons, international tourists are not usually targeted for road safety initiatives by transport authorities. Given that there are considerable 'hidden' costs associated with international tourists and motor vehicle crashes, the topic should be of concern to both tourism and transport groups. This paper examines issues concerned with driving in unfamiliar surroundings for international visitors in Australia, and proposes a national research and management programme to guide policy and planning in the area. (C) 1999 Elsevier Science Ltd. All rights reserved.