936 resultados para Hazard Warning Lamps.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND: Despite the fact that outreach and early warning systems (EWS) are an integral part of a hospital wide systems approach to improve the early identification and management of deteriorating patients on general hospital wards, the widespread implementation of these interventions in practice is not based on robust research evidence. OBJECTIVES: The primary objective was to determine the impact of critical care outreach services on hospital mortality rates. Secondary objectives included determining the effect of outreach services on intensive care unit (ICU) admission patterns, length of hospital stay and adverse events. SEARCH STRATEGY: The review authors searched the following electronic databases: EPOC Specialised Register, The Cochrane Central Register of Controlled Trials (CENTRAL) and other Cochrane databases (all on The Cochrane Library 2006, Issue 3), MEDLINE (1996-June week 3 2006), EMBASE (1974-week 26 2006), CINAHL (1982-July week 5 2006), First Search (1992-2005) and CAB Health (1990-July 2006); also reference lists of relevant articles, conference abstracts, and made contact with experts and critical care organisations for further information. SELECTION CRITERIA: Randomised controlled trials (RCTs), controlled clinical trials (CCTs), controlled before and after studies (CBAs) and interrupted time series designs (ITS) which measured hospital mortality, unanticipated ICU admissions, ICU readmissions, length of hospital stay and adverse events following implementation of outreach and EWS in a general hospital ward to identify deteriorating adult patients versus general hospital ward setting without outreach and EWS were included in the review. DATA COLLECTION AND ANALYSIS: Three review authors independently extracted data and two review authors assessed the methodological quality of the included studies. Meta-analysis was not possible due to heterogeneity. Summary statistics and descriptive summaries of primary and secondary outcomes are presented for each study. MAIN RESULTS: Two cluster-randomised control trials were included: one randomised at hospital level (23 hospitals in Australia) and one at ward level (16 wards in the UK). The primary outcome in the Australian trial (a composite score comprising incidence of unexpected cardiac arrests, unexpected deaths and unplanned ICU admissions) showed no statistical significant difference between control and medical emergency team (MET) hospitals (adjusted P value 0.640; adjusted odds ratio (OR) 0.98; 95% confidence interval (CI) 0.83 to 1.16). The UK-based trial found that outreach reduced in-hospital mortality (adjusted OR 0.52; 95% CI 0.32 to 0.85) compared with the control group. AUTHORS' CONCLUSIONS: The evidence from this review highlights the diversity and poor methodological quality of most studies investigating outreach. The results of the two included studies showed either no evidence of the effectiveness of outreach or a reduction in overall mortality in patients receiving outreach. The lack of evidence on outreach requires further multi-site RCT's to determine potential effectiveness.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During the summer of 2007 the United Kingdom experienced some of the worst flooding in its history, with the city of Hull amongst the worst affected. Meanwhile, the city of New Orleans, USA was subject to severe flooding in August 2005 as a result of Hurricane Katrina. The study has found that both the UK and US government disaster management programmes were ill prepared for these flood events. Many parallel issues have been discovered and discussed. The conditions of vulnerability that are evident in developing countries are not widely present in the UK or US but this must not be allowed to lead to complacency and lack of preparation and awareness. The cost in terms of mortality is relatively low compared to similar events in developing countries; however, the economic implications are considerable and must be addressed.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Lead is highly toxic to animals. Humans eating game killed using lead ammunition generally avoid swallowing shot or bullets and dietary lead exposure from this source has been considered low. Recent evidence illustrates that lead bullets fragment on impact, leaving small lead particles widely distributed in game tissues. Our paper asks whether lead gunshot pellets also fragment upon impact, and whether lead derived from spent gunshot and bullets in the tissues of game animals could pose a threat to human health.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A tribute to the Wexford born internationally acclaimed Irish designer and architect EILEEN GRAY and an intimate look at the work of 10 outstanding designers, craftspeople and artists working in Ireland today.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since the first launch of the new engineering contract (NEC) in 1993, early warning of problems has been widely recognized as an important approach of proactive management during a construction or engineering project. Is early warning really effective for the improvement of problem solving and project performance? This is a research question that still lacks a good answer. For this reason, an empirical investigation was made in the United Kingdom (U.K.) to answer the question. This study adopts a combination of literature review, expert interview, and questionnaire survey. Nearly 100 questionnaire responses were collected from the U.K. construction industry, based on which the use of early warning under different forms of contract is compared in this paper. Problem solving and project performance are further compared between the projects using early warning and the projects not using early warning. The comparison provides clear evidence for the significant effect of early warning on problem solving and project performance in terms of time, cost, and quality. Subsequently, an input-process-output model is developed in this paper to explore the relationship among early warning, problem solving, and project
performance. All these help construction researchers and practitioners to better understand the role of early warning in ensuring project success.