899 resultados para FEASIBILITY
Resumo:
In situ fusion on the boat-type graphite platform has been used as a sample pretreatment for the direct determination of Co, Cr and Mn in Portland cement by solid sampling graphite furnace atomic absorption spectrometry (SS-GF AAS). The 3-field Zeeman technique was adopted for background correction to decrease the sensitivity during measurements. This strategy allowed working with up to 200 mu g of sample. The in situ fusion was accomplished using 10 mu L of a flux mixture 4.0% m/v Na(2)CO(3) + 4.0% m/v ZnO + 0.1% m/v Triton (R) X-100 added over the cement sample and heated at 800 degrees C for 20 s. The resulting mould was completely dissolved with 10 mu L of 0.1% m/v HNO(3). Limits of detection were 0.11 mu g g(-1) for Co, 1.1 mu g g(-1) for Cr and 1.9 mu g g(-1) for Mn. The accuracy of the proposed method has been evaluated by the analysis of certified reference materials. The values found presented no statistically significant differences compared to the certified values (Student`s t-test, p<0.05). In general, the relative standard deviation was lower than 12% (n = 5). (C) 2009 Elsevier B.V. All rights reserved.
Resumo:
This work describes the evaluation of several parameters for the preparation of a tuna fish candidate as a reference material (RM) in order to measure the total As mass fraction by slurry sampling graphite furnace atomic absorption spectrometry (SLS-GF AAS) and slurry sampling hydride generation atomic absorption spectrometry (SLS-HG AAS). The main parameters investigated were the homogeneity, analyte segregation and composition during material production. For candidate RM preparation, tuna fish was collected at a local market, cleaned, freeze-dried and treated using different procedures as follows: (1) ground in a cutting mill and separated in different particle sizes (2) ground in cryogenic mill. The mass fraction of As in the cryogenically ground sample was (4.77 +/- A 0.19) mu g g(-1) for SLS-GF AAS and (4.61 +/- A 0.34) mu g g(-1) for SLS-HG AAS. The accuracy of the procedures was checked with tuna fish certified reference material (BCR 627) with recoveries of 102 and 94% for SLS-GF AAS and SLS-HG AAS, respectively. The homogeneity factor was calculated for different pretreatment procedures and for particle sizes in the range of 500-150 mu g, indicating good homogeneity, except for raw fish. There was no observed analyte segregation and no losses, no contamination and no changes in the microdistribution of material during preparation.
Resumo:
This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.
Resumo:
In recent years the number of bicycles with e-motors has been increased steadily. Within the pedelec – bikes where an e-motor supports the pedaling – a special group of transportation bikes has developed. These bikes have storage boxes in addition to the basic parts of a bike. Due to the space available on top of those boxes it is possible to install a PV system to generate electricity which could be used to recharge the battery of the pedelec. Such a system would lead to grid independent charging of the battery and to the possibility of an increased range of motor support. The feasibility of such a PV system is investigated for a three wheeled pedelec delivered by the company BABBOE NORDIC.The measured data of the electricity generation of this mobile system is compared to the possible electricity generation of a stationary system.To measure the consumption of the pedelec different tracks are covered, and the energy which is necessary to recharge the bike battery is measured using an energy logger. This recharge energy is used as an indirect measure of the electricity consumption. A PV prototype system is installed on the bike. It is a simple PV stand alone system consisting of PV panel, charge controller with MPP tracker and a solar battery. This system has the task to generate as much electricity as possible. The produced PV current and voltage aremeasured and documented using a data logger. Afterwards the average PV power is calculated. To compare the produced electricity of the on-bike system to that of a stationary system, the irradiance on the latter is measured simultaneously. Due to partial shadings on the on-bike PV panel, which are caused by the driver and some other bike parts, the average power output during riding the bike is very low. It is too low to support the motor directly. In case of a similar installation as the PV prototype system and the intention always to park the bike on a sunny spot an on-bike system could generate electricity to at least partly recharge a bike battery during one day. The stationary PV system using the same PV panel could have produced between 1.25 and 8.1 times as much as the on-bike PV system. Even though the investigation is done for a very specific case it can be concluded that anon-bike PV system, using similar components as in the investigation, is not feasible to recharge the battery of a pedelec in an appropriate manner. The biggest barrier is that partial shadings on the PV panel, which can be hardly avoided during operation and parking, result in a significant reduction of generated electricity. Also the installation of the on-bike PV system would lead to increased weight of the whole bike and the need for space which is reducing the storage capacity. To use solar energy for recharging a bike battery an indirect way is giving better results. In this case a stationary PV stand alone system is used which is located in a sunny spot without shadings and adjusted to use the maximum available solar energy. The battery of the bike is charged using the corresponding charger and an inverter which provides AC power using the captured solar energy.
Resumo:
The work presented in this thesis concerns the dimensioning of an Energy Storage System (ESS) which will be used as an energy buffer for a grid-connected PV plant. This ESS should help managing the PV plant to inject electricity into the grid according to the requirements of the grid System Operator. It is desired to obtain a final production not below 1300kWh/kWp with a maximum ESS budget of 0.9€/Wp. The PV plant will be sited in Martinique Island and connected to the main grid. This grid is a small one where the perturbations due clouds in the PV generation are not negligible anymore. A software simulation tool, incorporating a model for the PV-plant production, the ESS and the required injection pattern of electricity into the grid has been developed in MS Excel. This tool has been used to optimize the relevant parameters defining the ESS so that the feed-in of electricity into the grid can be controlled to fulfill the conditions given by the System Operator. The inputs used for this simulation tool are, besides the conditions given by the System Operator on the allowed injection pattern, the production data from a similar PV-plant in a close-by location, and variables for defining the ESS. The PV production data used is from a site with similar climate and weather conditions as for the site on the Martinique Island and hence gives information on the short term insolation variations as well as expected annual electricity production. The ESS capacity and the injected electric energy will be the main figures to compare while doing an economic study of the whole plant. Hence, the Net Present Value, Benefit to Cost method and Pay-back period studies are carried on as dependent of the ESS capacity. The conclusion of this work is that it is possible to obtain the requested injection pattern by using an ESS. The design of the ESS can be made within an acceptable budget. The capacity of ESS to link with the PV system depends on the priorities of the final output characteristics, and it also depends on which economic parameter that is chosen as a priority.
Resumo:
BACKGROUND: Even though Swedish national guidelines for stroke care (SNGSC) have been accessible for nearly a decade access to stroke rehabilitation in out-patient health care vary considerably. In order to aid future interventions studies for implementation of SNGSC, this study assessed the feasibility and acceptability of study procedures including analysis of the context in out-patient health care settings. METHODS: The feasibility and acceptability of recruitment, observations and interviews with managers, staff and patients were assessed, as well as the feasibility of surveying health care records. RESULTS: To identify patients from the the hospitals was feasible but not from out-patient care where a need to relieve clinical staff of the recruitment process was identified. Assessing adherence to guidelines and standardized evaluations of patient outcomes through health care records was found to be feasible and suitable assessment tools to evaluate patient outcome were identified. Interviews were found to be a feasible and acceptable tool to survey the context of the health care setting. CONCLUSION: In this feasibility study a variety of qualitative and quantitative data collection procedures and measures were tested. The results indicate what can be used as a set of feasible and acceptable data collection procedures and suitable measures for studying implementation of stroke guidelines in an out-patient health care context.
Resumo:
http://digitalcommons.colby.edu/atlasofmaine2006/1017/thumbnail.jpg
Resumo:
This paper addresses the feasibility of implementing Japanese manufacturing systems in the United States. The recent success of Japanese transplant companies suggests that Just-In-Time (JIT) production is possible within America's industrial environment. Once American workers receive proper training, they have little difficulty participating in rapid setup procedures and utilizing the kanban system. Japanese transplants are gradually developing Japanese-style relationships with their American supplier companies by initiating long-term, mutually beneficial agreements. They are also finding ways to cope with America's problem of distance, which is steadily decreasing as an obstacle to JIT delivery. American companies, however, encounter Significant problems in trying to convert traditionally organized, factories to the JIT system. This paper demonstrates that it is both feasible and beneficial for American manufacturers to implement JIT production techniques. Many of the difficulties manufacturers experience center around a general lack of information about JIT. Once a company realizes its potential for setup-time reduction, a prerequisite for the JIT system, workers and managers can work together to create a new process for handling equipment changeover. Significant results are possible with minimal investment. Also, supervisors often do not realize that the JIT method of ordering goods from suppliers is compatible with current systems. This "kanban system" not only enhances current systems but also reduces the amount of paperwork and scheduling involved. When arranging JlT delivery of supplier goods, American manufacturers tend to overlook important aspects of JIT supplier management. However, by making long-tenn commitments, initiating the open exchange of information, assisting suppliers in reaching new standards of performance, increasing the level of conununication, and relying more on suppliers' engineering capabilities, even American manufacturers can develop Japanese-style supplier relationships that enhance the effectiveness of the system.
Resumo:
The eastern timber wolf (Canis lupus lycaon) once inhabited Maine, as well as the rest of the eastern United States and southern Canada. As a result of human land use and widespread extermination campaigns, wolf numbers dramatically decreased, and by the early twentieth century, no wolves remained in Maine. As large carnivorous and territorial mammals, wolves require contiguous undeveloped areas with abundant prey. This project is a feasibility study that identifies the areas in Maine that are suitable for the reintroduction of wolves. We used GIS modeling to identify contiguous forested areas over 1,000 km2, calculate road and population density, and map the presence or absence of prey throughout the state. These variables were combined in a habitat suitability model to determine the location and amount of suitable wolf habitat in Maine. The northwestern part of the state appears most suitable for wolf reintroduction as it is relatively undeveloped with low road and population densities. There is also a smaller isolated area in Washington County that might be suitable, but further investigation is required.
Resumo:
We consider exchange economies with a continuum of agents and differential information about finitely many states of nature. It was proved in Einy, Moreno and Shitovitz (2001) that if we allow for free disposal in the market clearing (feasibility) constraints then an irreducible economy has a competitive (or Walrasian expectations) equilibrium, and moreover, the set of competitive equilibrium allocations coincides with the private core. However when feasibility is defined with free disposal, competitive equilibrium allocations may not be incentive compatible and contracts may not be enforceable (see e.g. Glycopantis, Muir and Yannelis (2002)). This is the main motivation for considering equilibrium solutions with exact feasibility. We first prove that the results in Einy et al. (2001) are still valid without free-disposal. Then we define an incentive compatibility property motivated by the issue of contracts’ execution and we prove that every Pareto optimal exact feasible allocation is incentive compatible, implying that contracts of a competitive or core allocations are enforceable.
Resumo:
A FGV Projetos posiciona-se com destaque no desenvolvimento de projetos e estudos sobre biocombustíveis. Especialistas no assunto apontam para a viabilidade da produção de biocombustíveis em diversos países, e recomendam investimentos em toda a cadeia produtiva, específicos para cada localidade. Isso permitirá aos países que desejam reduzir a dependência por combustíveis fósseis, tais como o petróleo, a diversificação da matriz energética, o aumento do emprego no campo, e uma melhora do saldo comercial. Este documento apresenta síntese dos trabalhos realizados e em desenvolvimento, e tem como base os estudos de viabilidade para a produção de biocombustíveis de El Salvador e da República Dominicana.
Resumo:
Este estudo é uma análise à eficácia de um Social Impact Bond como como instrumento financeiro no modelo de intervenção da APAC Portugal. O objetivo é o de melhorar a vida de ex-criminosos e reduzir os índices de reincidência de modo a apoiar a sua reinserção na sociedade após a libertação. Enquanto os custos de funcionamento de um estabelecimento prisional forem suportados pelo sector público, como é de lei, o modelo inovador de intervenção terá de encontrar um meio alternativo de financiamento. Sendo assim, testámos a rentabilidade de um Social Impact Bond através de um bem estruturado modelo Excel que simula o mecanismo de investimento, tendo os resultados demonstrado que um Social Impact Bond pode, de facto, financiar o modelo de intervenção da APAC Portugal de forma eficaz.