922 resultados para Engineering Asset Management, Optimisation, Preventive Maintenance, Reliability Based Preventive Maintenance, Multiple Criteria Decision Making


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The decentralisation reform in Indonesia has mandated the Central Government to transfer some functions and responsibilities to local governments including the transfer of human resources, assets and budgets. Local governments became giant asset holders almost overnight and most were ill prepared to handle these transformations. Assets were transferred without analysing local government need, ability or capability to manage the assets and no local government was provided with an asset management framework. Therefore, the aim of this research is to develop a Public Asset Management Framework for provincial governments in Indonesia, especially for infrastructure and real property assets. This framework will enable provincial governments to develop integrated asset management procedures throughout asset‘s lifecycle. Achieving the research aim means answering the following three research questions; 1) How do provincial governments in Indonesia currently manage their public assets? 2) What factors influence the provincial governments in managing these public assets? 3) How is a Public Asset Management Framework developed that is specific for the Indonesian provincial governments‘ situation? This research applied case studies approach after a literature review; document retrieval, interviews and observations were collated. Data was collected in June 2009 (preliminary data collection) and January to July 2010 in the major eastern Indonesian provinces. Once the public asset management framework was developed, a focus group was used to verify the framework. Results are threefold and indicate that Indonesian provincial governments need to improve the effectiveness and efficiency of current practice of public asset management in order to improve public service quality. The second result shows that the 5 major concerns that influence the local government public asset management processes are asset identification and inventory systems, public asset holding, asset guidance and legal arrangements, asset management efficiency and effectiveness, and, human resources and their organisational arrangements. The framework was then applied to assets already transferred to local governments and so included a system of asset identification and a needs analysis to classify the importance of these assets to local governments, their functions and responsibilities in delivering public services. Assets that support local government functions and responsibilities will then be managed using suitable asset lifecycle processes. Those categorised as surplus assets should be disposed. Additionally functions and responsibilities that do not need an asset solution should be performed directly by local governments. These processes must be measured using performance measurement indicators. All these stages should be guided and regulated with sufficient laws and regulations. Constant improvements to the quality and quantity of human resources hold an important role in successful public asset management processes. This research focuses on developing countries, and contributes toward the knowledge of a Public Asset Management Framework at local government level, particularly Indonesia. The framework provides local governments a foundation to improve their effectiveness and efficiency in managing public assets, which could lead to improved public service quality. This framework will ensure that the best decisions are made throughout asset decision ownership and provide a better asset life cycle process, leading to selection of the most appropriate asset, improve its acquisition and delivery process, optimise asset performance, and provide an appropriate disposal program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Property is an important factor in all businesses production in order to function. Nourse (1990) quoted ¡°some businesses are real estate, all businesses use real estate¡±. In recent years, the management of property assets has become the focus of many organisations, including the non-real estate businesses. Good asset management is concerned with the effective utilisation of a property owner.s assets. It is the management process of ensuring that the portfolio of properties held meets the overall requirements of the users. In short, it is the process of identifying the user.s requirement and the rationalisation of property holdings to match that requirement best, followed by a monitoring and ongoing review of practice. In Malaysia, federal agencies and local authorities are among the largest property asset owners. Recently the federal government has released a Total Asset Management Manual (TAMM). It is at the preliminary stage of implementation. This thesis will study the international practices of asset management of public sector assets and assess the effectiveness of TAMM. This research will focus on current international practices for the effective management of public sector property assets. The current application in Malaysia will be highlighted, to determine the awareness and understanding of the current practices to the recently released TAMM. This research is an exploratory research. The basis of this research relies on the combination of qualitative and quantitative approach, whereby the qualitative approach focuses on the international practices and its application to the management of public sector property assets. Questionnaires survey will be conducted among the Malaysian public property assets managers and users in the quantitative approach to gauge the collective opinion on the current practices of TAMM and its implementation

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis takes a new data mining approach for analyzing road/crash data by developing models for the whole road network and generating a crash risk profile. Roads with an elevated crash risk due to road surface friction deficit are identified. The regression tree model, predicting road segment crash rate, is applied in a novel deployment coined regression tree extrapolation that produces a skid resistance/crash rate curve. Using extrapolation allows the method to be applied across the network and cope with the high proportion of missing road surface friction values. This risk profiling method can be applied in other domains.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Road surface skid resistance has been shown to have a strong relationship to road crash risk, however, applying the current method of using investigatory levels to identify crash prone roads is problematic as they may fail in identifying risky roads outside of the norm. The proposed method analyses a complex and formerly impenetrable volume of data from roads and crashes using data mining. This method rapidly identifies roads with elevated crash-rate, potentially due to skid resistance deficit, for investigation. A hypothetical skid resistance/crash risk curve is developed for each road segment, driven by the model deployed in a novel regression tree extrapolation method. The method potentially solves the problem of missing skid resistance values which occurs during network-wide crash analysis, and allows risk assessment of the major proportion of roads without skid resistance values.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper considers the design of a radial flux permanent magnet iron less core brushless DC motor for use in an electric wheel drive with an integrated epicyclic gear reduction. The motor has been designed for a continuous output torque of 30 Nm and peak rating of 60 Nm with a maximum operating speed of 7000 RPM. In the design of brushless DC motors with a toothed iron stator the peak air-gap magnetic flux density is typically chosen to be close to that of the remanence value of the magnets used. This paper demonstrates that for an ironless motor the optimal peak air-gap flux density is closer to the maximum energy product of the magnets used. The use of a radial flux topology allows for high frequency operation and can be shown to give high specific power output while maintaining a relatively low magnet mass. Two-dimensional finite element analysis is used to predict the air-gap flux density. The motor design is based around commonly available NdFeB bar magnet size

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper considers the design of a radial flux permanent magnet ironless core brushless DC motor for use in an electric wheel drive with an integrated epicyclic gear reduction. The motor has been designed for a continuous output torque of 30 Nm and peak rating of 60 Nm with a maximum operating speed of 7000 RPM. In the design of brushless DC motors with a toothed iron stator the peak air-gap magnetic flux density is typically chosen to be close to that of the remanence value of the magnets used. This paper demonstrates that for an ironless motor the optimal peak air-gap flux density is closer to the maximum energy product of the magnets used. The use of a radial flux topology allows for high frequency operation and can be shown to give high specific power output while maintaining a relatively low magnet mass. Two-dimensional finite element analysis is used to predict the airgap flux density. The motor design is based around commonly available NdFeB bar magnet size

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modeling (BIM) is the use of virtual building information models to develop building design solutions and design documentation and to analyse construction processes. Recent advances in IT have enabled advanced knowledge management, which in turn facilitates sustainability and improves asset management in the civil construction industry. There are several important qualifiers and some disadvantages of the current suite of technologies. This paper outlines the benefits, enablers, and barriers associated with BIM and makes suggestions about how these issues may be addressed. The paper highlights the advantages of BIM, particularly the increased utility and speed, enhanced fault finding in all construction phases, and enhanced collaborations and visualisation of data. The paper additionally identifies a range of issues concerning the implementation of BIM as follows: IP, liability, risks, and contracts and the authenticity of users. Implementing BIM requires investment in new technology, skills training, and development of new ways of collaboration and Trade Practices concerns. However, when these challenges are overcome, BIM as a new information technology promises a new level of collaborative engineering knowledge management, designed to facilitate sustainability and asset management issues in design, construction, asset management practices, and eventually decommissioning for the civil engineering industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Safety of repair, maintenance, alteration, and addition (RMAA) works have long been neglected because RMAAworks are often minute and only last for a short period of time. With rising importance of the RMAA sector in many developed societies, safety of RMAA works has begun to draw attention. Many RMAA contracting companies are small- and medium-sized enterprises (SMEs) that do not have comprehensive safety management systems. Existing safety legislation and regulations for new construction sites are not fully applicable to RMAAworks. Instead of relying on explicit and well-established safety systems, tacit safety knowledge plays an extremely important role in RMAA projects. To improve safety of RMAAworks, safety knowledge should be better managed. However, safety knowledge is difficult to capture in RMAA works. This study aims to examine safety management practices of RMAA contracting companies to see how safety knowledge of RMAA projects is managed. Findings show that RMAA contracting companies undertaking large-scale RMAA projects have more initiatives of safety management. Safety management of small-scale RMAA works relies heavily on the motivation of site supervisors and self-regulation of workers. Better tacit knowledge management improves safety performance. To enhance safety capability of RMAA contracting companies, a knowledge sharing culture should be cultivated. The government should provide assistance to SMEs to implement proper safety management practices in small-sized projects. Potentials of applying computer software technology in RMAA projects to capture, store, and retrieve safety information should be explored. Employees should be motivated to share safety knowledge by giving proper recognition to those who are willing to share.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Civil infrastructure and especially roads are being impacted with increasing frequency by flood, Tsunami, cyclone related natural and manmade disasters in the world. Responding to such events and in preparing for more regular and intense climate-change induced events in future, the road governing agencies are reviewing how postdisaster road infrastructure recovery projects are best planned and delivered. In particular, there is awareness that rebuilding such infrastructure require sustainable asset management strategies across economic, environmental and social dimensions. A comprehensive asset management framework for pre and post disaster situations can minimize negative impacts on our communities, economy and environment. This research paper is focused on post disaster management in road infrastructures and road infrastructure asset management strategies used by road authorities. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of disasters. This research paper will contribute to strategic infrastructure asset planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes. This paper also focuses on proper asset management, governance and engineering principles which should be followed and adopted in post disaster recovery projects to maximize sustainability in environmental, social and economic dimensions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A significant number of privatizations utilized to operate and maintain critical networked infrastructures have failed to meet contractual expectations and the expectations of the community. The author carried out empirical research ex-ploring four urban water systems. This research revealed that of the four forms of privatization the alliance form was particularly suited to the stewardship of an ur-ban water system. The question then is whether these findings from urban water can be generalised to O&M of infrastructure generally. The answer is increasingly important as governments seek financial sustainability through reapplying the contestability strategy and outsource and privatise further services and activities. This paper first examines the issues encountered with O & M privatisations. Second the findings as to the stewardship achieved by the four case study water systems are unpacked with particular focus upon the alliance form. Third the key variables which were found to have distinct causal links to the stewardship-like behaviour of the private participants in the Alliance case study are described. Fourth the variables which may be crucial to the successful application of the alliance form to the broader range of infrastructures are separated out. Fifth this paper then sets the path for research into these crucial features of the alliance form.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose The purpose of this paper is to explore and compare the asset management policies and practices of six Australian states – New South Wales, Victoria, Queensland, South Australia, Western Australia and Tasmania – to improve understanding of the policy context to best shape policy focus and guidelines. Australian state-wide asset management policies and guidelines are an emergent policy domain, generating a substantial body of knowledge. However, these documents are spread across the layers of government and are therefore largely fragmented and lack coherency. Design/methodology/approach The comparative study is based on the thematic mapping technique using the Leximancer software. Findings Asset management policies and guidelines of New South Wales and Victoria have more interconnected themes as compared to other states in Australia. Moreover, based on the findings, New South Wales has covered most of the key concepts in relation to asset management; the remaining five states are yet to develop a comprehensive and integrated approach to asset management policies and guidelines. Research limitations/implications This review and its findings have provided a number of directions on which government policies can now be better constructed and assessed. In doing so, the paper contributes to a coherent way forward to satisfy national emergent and ongoing asset management challenges. This paper outlines a rigorous analytical methodology to inform specific policy changes. Originality/value This paper provides a basis for further research focused on analyzing the context and processes of asset management guidelines and policies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Knowledge Management (KM) is vital factor to successfully undertake projects. The temporary nature of projects necessitates employing useful KM practices for tackling issues such as knowledge leakiness and rework. The Project Management Office (PMO) is a unit within organizations to facilitate and oversee organizational projects. Project Management Maturity Models (PMMM) shows the development of PMOs from immature to mature levels. The existing PMMMs have focused on discussing Project Management (PM) practices, however, the management of project knowledge is yet to be addressed, at various levels of maturity. This research project was undertaken to investigate the mentioned gap for addressing KM practices at the existing PMMMs. Due to the exploratory and inductive nature of this research, qualitative methods were chosen as the research methodology. In total, three cases selected from different industries: research; mining and government organizations, to provide broad categories for research and research questions were examined using the developed framework. This paper presents the partial findings of undertaken investigation of the research organisation with the lowest level of maturity. The result shows that knowledge creation and capturing are the most important processes, while knowledge transferring and reusing are not as important as the other two processes. In addition, it was revealed that provision of “knowledge about client” and “project management knowledge” are the most important types of knowledge that are required at this level of maturity. In conclusion, the outcomes of this paper shall provide powerful guidance to PMOs at lowest level of maturity from KM point of view.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An effective prognostics program will provide ample lead time for maintenance engineers to schedule a repair and to acquire replacement components before catastrophic failures occur. This paper presents a technique for accurate assessment of the remnant life of machines based on health state probability estimation technique. For comparative study of the proposed model with the proportional hazard model (PHM), experimental bearing failure data from an accelerated bearing test rig were used. The result shows that the proposed prognostic model based on health state probability estimation can provide a more accurate prediction capability than the commonly used PHM in bearing failure case study.