954 resultados para Direct Current Machine Control
Resumo:
Transient responses of electrorheological fluids to square-wave electric fields in steady shear are investigated by computational simulation method. The structure responses of the fluids to the field with high frequency are found to be very similar to that to the field with very low frequency or the sudden applied direct current field. The stress rise processes are also similar in both cases and can be described by an exponential expression. The characteristic time tau of the stress response is found to decrease with the increase of the shear rate (gamma) over dot and the area fraction of the particles phi(2). The relation between them can be roughly expressed as tau proportional to(gamma) over dot(-3/4)phi(2)(-3/2). The simulation results are compared with experimental measurements. The aggregation kinetics of the particles in steady shear is also discussed according to these results.
Resumo:
The loss of motor function at the elbow joint can result as a consequence of stroke. Stroke is a clinical illness resulting in long lasting neurological deficits often affecting somatosensory and motor cortices. More than half of those that recover from a stroke survive with disability in their upper arm and need rehabilitation therapy to help in regaining functions of daily living. In this paper, we demonstrated a prototype of a low-cost, ultra-light and wearable soft robotic assistive device that could aid administration of elbow motion therapies to stroke patients. In order to assist the rotation of the elbow joint, the soft modules which consist of soft wedge-like cellular units was inflated by air to produce torque at the elbow joint. Highly compliant rotation can be naturally realised by the elastic property of soft silicone and pneumatic control of air. Based on the direct visual-actuation control, a higher control loop utilised visual processing to apply positional control, the lower control loop was implemented by an electronic circuit to achieve the desired pressure of the soft modules by Pulse Width Modulation. To examine the functionality of the proposed soft modular system, we used an anatomical model of the upper limb and performed the experiments with healthy participants.
Resumo:
This master thesis presents a new technological combination of two environmentally friendly sources of energy in order to provide DHW, and space heating. Solar energy is used for space heating, and DHW production using PV modules which supply direct current directly to electrical heating elements inside a water storage tank. On the other hand a GSHP system as another source of renewable energy provides heat in the water storage tank of the system in order to provide DHW and space heating. These two sources of renewable energy have been combined in this case-study in order to obtain a more efficient system, which will reduce the amount of electricity consumed by the GSHP system.The key aim of this study is to make simulations, and calculations of the amount ofelectrical energy that can be expected to be produced by a certain amount of PV modules that are already assembled on a house in Vantaa, southern Finland. This energy is then intended to be used as a complement to produce hot water in the heating system of the house beside the original GSHP system. Thus the amount of electrical energy purchased from the grid should be reduced and the compressor in the GSHP would need fewer starts which would reduce the heating cost of the GSHP system for space heating and providing hot water.The produced energy by the PV arrays in three different circuits will be charged directly to three electrical heating elements in the water storage tank of the existing system to satisfy the demand of the heating elements. The excess energy can be used to heat the water in the water storage tank to some extent which leads to a reduction of electricity consumption by the different components of the GSHP system.To increase the efficiency of the existing hybrid system, optimization of different PV configurations have been accomplished, and the results are compared. Optimization of the arrays in southern and western walls shows a DC power increase of 298 kWh/year compared with the existing PV configurations. Comparing the results from the optimization of the arrays on the western roof if the intention is to feed AC power to the components of the GSHP system shows a yearly AC power production of 1,646 kWh.This is with the consideration of no overproduction by the PV modules during the summer months. This means the optimized PV systems will be able to cover a larger part of summer demand compared with the existing system.
Resumo:
A graduate of the New York Trade School's Electrical program in 1958, Dennis Mahoney is show at work for the Consolidated Edison Company in New York. Caption written on reverse reads "Dennis J. Mahoney is shown closing the Armature Switch of a Rotary Converter in a D.C. substation. The average rotary in our stations has a capacity of 4,200 K.W. and there are 30 such stations in Manhattan with an annual output of 800,000 amperes. Although the D.C. load is gradually being reduced, it can be seen that there is still considerable demand for direct current in Manhattan." Black and white photograph.
Resumo:
O objetivo desta pesquisa foi analisar o desenho institucional do controle externo sobre os contratos de gestão no âmbito do Tribunal de Contas do estado de Pernambuco quanto a sua aderência aos conteúdos da lei estadual que disciplina as Organizações Sociais e quanto a sua observância por parte dos atores envolvidos: Administração Pública, técnicos do tribunal de contas e membros do seu corpo julgador. Foram assumidas as seguintes premissas: que os novos arranjos de prestação de serviços públicos, por meio de parcerias com as Organizações Sociais, demandam por parte dos Tribunais de Contas desenhos institucionais de fiscalização específicos, que a pesar de variáveis devem primar por sua capacidade de revelar informações; que o processo de formatação destes desenhos institucionais deve ser dinâmico, permitindo-se que as contigências experimentadas na sua implementação possam contribuir no seu aperfeiçoamento; e que esses desenhos institucionais geram impacto no comportamento dos atores envolvidos. O estudo foi realizado por meio de pesquisa documental. A metodologia qualitativa de análise de conteúdo foi escolhida para análise dos dados. Os resultados da pesquisa permitiram concluir que o desenho institucional de controle dos contratos de gestão no âmbito do TCE-PE caracteriza-se por sua fragilidade como mecanismo de revelação de informação e, consequentemente, não contribui para a redução da assimetria de informação que se estabelece com a implementação dos contratos de gestão. Adicionalmente, compromete e limita o desempenho do Tribunal de Contas no controle destes ajustes. Verificou-se, também, uma a baixa observância do desenho institucional identificado, em que pese sua fragilidade, por parte dos atores envolvidos no controle dos contratos de gestão, implicando em uma baixa institucionalização deste desenho. Os resultados devem proporcionar uma rediscussão acerca dos mecanismos de controle dos contratos de gestão por parte do TCE-PE, que poderá resultar em um novo desenho institucional com vistas a conferir maior transparência às parcerias com as Organizações Sociais.
Resumo:
The fluctuacion force has been increasingly used in studies with elderly as a good predictor of performance and functionality of the motor. However, most analyzes the fluctuation of force in one session. Thus, identifying the minimum amount of sessions needed for familiarization with the fluctuation strength in isometric exercise become relevant. Furthermore, to investigate the effects of applying transcranial direct current stimulation (tDCS) associated with regular exercise on rates fluctuation task force is extremely important. In the first experiment, volunteers were subjected to a protocol marked by a familiarization session to establish the parameters of VCM and eight sessions with intensity of 30% MVC in office. It was observed that two familiarization sessions are required so there is a fluctuation stabilizing force. In experiment II, subjects performed an isometric contraction before and after applying tDCS (cathode, anode and sham) applied to M1. ETCC anodic effectively contributed to reducing the fluctuation of force during isometric exercise in the elderly, while the cathodic caused the increased levels of strength fluctuation. It was concluded that there is a need to implement a familiarization protocol with at least two sessions to avoid possible misunderstandings of measurements in tests of fluctuacion force. Besides that tDCS interfered with the behavior of the oscillations of force, with cathodic promoting increased fluctuation strength and anodic contributed to greater stability, demonstrating the potential of this technique neuromodulation associated with exercise as rehabilitation tools
Resumo:
The objective of this research is to discuss about the need for implementation of new alternatives for the implementation on the metrological control: on the findings of initial and subsequent measurements, the control procedures of measurement uncertainty applied in assessing the loss or remains found in handling operations of bulk liquids, when used turbine meters used in measuring the tax on the business of Petrobras, due to the current environment of legal metrology and scientific, both domestic and international. We aim, with these alternatives: standardizing the minimization of random and systematic errors, the estimate of the remaining errors, as well as the management control of metrological calibration procedures, control of measurement uncertainty, and contribute to the change in the form of performance of legal metrology and scientific disseminating new information to change management of metrological control, objectively focused on aspects of supervision in implementing these activities in the control of the uncertainties of measurement used in our processes in the fiscal measurement system Petrobras. Results are presented, information and comments on the influence of measurement uncertainty in the current results of the fiscal and transfer of custody. This will emphasize the need, among other things, improvement and expansion of metrological control monitored by setting a better meet demand, calibration equipment and measuring instruments for Petrobras. Finally, we intend to establish the need for improving the method of evaluation of the data meter applied to the current management control of measurement uncertainty by proposing a methodology for addressing the problem, as well as highlighting the expected results.
Resumo:
The fuel cell is an emerging cogeneration technology that has been applied successfully in Japan, the USA and some countries in the European Union. This system performs direct conversion of the chemical energy of the oxidation of hydrogen from fuel with atmospheric oxygen into direct current electricity and waste heat via an electrochemical process relying on the use of different electrolytes (phosphoric acid, molten carbonate and solid oxide, depending on operating temperature). This technology permits the recovery of waste heat, available from 200 degreesC up to 1000 degreesC depending on the electrolyte technology, which can be used in the production of steam, hot or cold water, or hot or cold air, depending on the associated recuperation equipment. In this paper, an energy, exergy and economic analysis of a fuel cell cogeneration system (FCCS) is presented. The FCCS is applied in a segment of the tertiary sector to show that it is a feasible alternative for rational decentralized energy production under Brazilian conditions. The technoeconomic analysis shows a global efficiency or fuel utilization efficiency of 86%. Analysis shows that the exergy losses in the fuel cell unit and the absorption refrigeration system are significant. Furthermore, the payback period estimated is about 3 and 5 years for investments in fuel cells of 1000 and 1500 US$/kW, respectively. (C) 2001 Elsevier B.V. Ltd. All rights reserved.
Resumo:
This work analyses the waveshapes of continuing currents and parameters of M-components in positive cloud-to-ground (CG) flashes through high-speed GPS synchronized videos. The dataset is composed of only long continuing currents (with duration longer than 40 ms) and was selected from more than 800 flashes recorded in Sao Jose dos Campos (45.864 degrees W, 23.215 degrees S) and Uruguaiana (29.806 degrees W, 57.005 degrees S) in Southeast and South of Brazil, respectively, during 2003 to 2007 summers. The videos are compared with data obtained by the Brazilian Lightning Location System (BrasilDAT) in order to determine the polarity of each flash and select only positive cases. There are only two studies of waveshapes of continuing currents in the literature. One is based on direct current measurements of triggered lightning, in which four different types of waveshapes were observed; and the other is based on measurements of luminosity variations in high-speed videos of CG negative lightning, in which besides the four types above mentioned two additional types were observed. The present work is an extension of the latter, using the same method but now applied to obtain the waveshapes of positive CG lightning. As far as the authors know, this is the first report on M-components in positive continuing currents. We also have used the luminosity-versus-time graphs to observe their occurrence and measure some parameters (duration, elapsed time and time between two successive M-components), whose statistics are presented and compared in detail to the data for negative flashes. We have plotted a histogram of the M-components elapsed time over the total duration of the continuing current for positive flashes, which presented an exponential decay (correlation coefficient: 0.83), similar to what has been observed for negative flashes. (C) 2008 Elsevier B.V. All rights reserved.
Resumo:
This paper presents a novel single-phase high-power-factor (HPF) pulsewidth-modulated (PWM) boost rectifier featuring soft commutation of the active switches at zero current (ZC), It incorporates the most desirable properties of conventional PWM and soft-switching resonant techniques.The input current shaping is achieved with average current mode control and continuous inductor current mode.This new PWM converter provides ZC turn on and turn off of the active switches, and it is suitable for high-power applications employing insulated gate bipolar transistors (IGBT's),The principle of operation, the theoretical analysis, a design example, and experimental results from a laboratory prototype rated at 1600 W with 400-Vdc output voltage are presented. The measured efficiency and the power factor were 96.2% and 0.99%, respectively, with an input current total harmonic distortion (THD) equal to 3.94%, for an input voltage with THD equal to 3.8%, at rated load.
Resumo:
This paper presents an analysis of a novel pulse-width-modulated (PWM) voltage step-down/up Zeta converter, featuring zero-current-switching (ZCS) at the active switches. The applications in de to de and ac to de (rectifier) operation modes are used as examples to illustrate the performance of this new ZCS-PWM Zeta converter. Regarding to the new ZCS-PWM Zeta rectifier proposed, it should be noticed that the average-current mode control is used in order to obtain a structure with high power-factor (HPF) and low total harmonic distortion (THD) at the input current.Two active switches (main and auxiliary transistors), two diodes, two small resonant inductors and one small resonant capacitor compose the novel ZCS-PWM soft-commutation cell, used in these new ZCS-PWM Zeta converters. In this cell, the turn-on of the active switches occurs in zero-current (ZC) and their turn-off in zero-current and zero-voltage (ZCZV). For the diodes, their turn-on process occurs in zero-voltage (ZV) and their reverse-recovery effects over the active switches are negligible. These characteristics make this cell suitable for Insulated-Gate Bipolar Transistors (IGBTs) applications.The main advantages of these new Zeta converters, generated from the new soft-commutation cell proposed, are possibility of obtaining isolation (through their accumulation inductors), and high efficiency, at wide load range. In addition, for the rectifier application, a high power factor and low THD in the input current ran be obtained, in agreement with LEC 1000-3-2 standards.The principle of operation, the theoretical analysis and a design example for the new de to de Zeta converter operating in voltage step-down mode are presented. Experimental results are obtained from a test unit with 500W output power, 110V(dc) output voltage, 220V(dc) input voltage, operating at 50kHz switching frequency. The efficiency measured at rated toad is equal to 97.3%for this new Zeta converter.Finally, the new Zeta rectifier is analyzed, and experimental results from a test unit rated at 500W output power, 110V(dc) output voltage, 220V(rms) input voltage, and operating at 50kHz switching frequency, are presented. The measured efficiency is equal to 96.95%, the power-factor is equal to 0.98, and the input current THD is equal to 19.07%, for this new rectifier operating at rated load.
Resumo:
This paper introduces novel zero-current-switching (ZCS) pulsewidth-modulated (PWM) preregulators based on a new soft-commutation cell, suitable for insulated gate bipolar transistor applications. The active switches in these proposed rectifiers turn on in zero current and turn off in zero current-zero voltage. In addition, the diodes turn on in zero voltage and their reverse-recovery effects over the active switches are negligible. Moreover, based on the proposed cell, an entire family of de-to-de ZCS-PWM converters can be generated, providing conditions to obtain naturally isolated converters, for example, derived buck-boost, Sepic. and Zeta converters. The novel ac-to-dc ZCS-PWM boost and Zeta preregulators are presented in order to verify the operation of this soft-commutation cell, In order to minimize the harmonic contents of the input current, increasing the ac power factor, the average-current-mode control is used, obtaining preregulators with ac power factor near unity and high efficiency at wide load range. The principle of operation, theoretical analysis, design example, and experimental results from test units for the novel preregulators are presented. The new boost preregulator was designed to nominal values of 1.6 kW output power, 220 V(rms) input voltage, 400 V(dc) output voltage, and operating at 20 kHz. The measured efficiency and power factor of the new ZCS-PWM boost preregulator were 96.7% and 0,99, respectively, with an input current total harmonic distortion (THD) equal to 3.42% for an input voltage with THD equal to 1.61%, at rated load, the new ZCS-PWM Zeta preregulator was designed to voltage step-down operation, and the experimental results were obtained from a laboratory prototype rated at 500 W, 220 V(rm), input voltage, 110 V(dc) output voltage, and operating at 50 kHz. The measured efficiency of the new ZCS-PWM Zeta preregulator is approximately 96.9% and the input power factor is 0.98, with an input current THD equal to 19.07% while the input voltage THD is equal to 1.96%, at rated load.
Resumo:
This paper shows the results of experimental investigations of three-phase banks composed of single-phase transformers and three-phase three-limb core transformers under simultaneous alternating and direct current excitations, for several winding connections. Harmonic analysis of excitation currents for different de saturation levels is performed.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)