923 resultados para Construction Project Delivery
Resumo:
As a vital component of construction professional services (CPS), construction management consultancy is in nature knowledge-intensive and client-tailored. Although recent studies have acknowledged the increasing role of this subsector of CPS in the attainment of sustainable construction, little attention has been given to the education and training of its main body, namely construction management consultants (CMCs). This study investigated the competence and knowledge structure of CMCs by taking China as an example. Using the methods of interview and questionnaire survey, three key competences of CMCs and the underpinned knowledge structure were identified. The identified competences are personnel quality, onsite practical skills, and continuing professional learning. Underpinned these competences are the knowledge structure composed of a number of disciplines including construction cost planning and control, civil engineering and construction, engineering contract and law, and construction project management. The research findings lay a solid foundation for future studies to probe into the role of construction management consultants in the area of sustainable construction.
Resumo:
Purpose Traditional construction planning relies upon the critical path method (CPM) and bar charts. Both of these methods suffer from visualization and timing issues that could be addressed by 4D technology specifically geared to meet the needs of the construction industry. This paper proposed a new construction planning approach based on simulation by using a game engine. Design/methodology/approach A 4D automatic simulation tool was developed and a case study was carried out. The proposed tool was used to simulate and optimize the plans for the installation of a temporary platform for piling in a civil construction project in Hong Kong. The tool simulated the result of the construction process with three variables: 1) equipment, 2) site layout and 3) schedule. Through this, the construction team was able to repeatedly simulate a range of options. Findings The results indicate that the proposed approach can provide a user-friendly 4D simulation platform for the construction industry. The simulation can also identify the solution being sought by the construction team. The paper also identifies directions for further development of the 4D technology as an aid in construction planning and decision-making. Research limitations/implications The tests on the tool are limited to a single case study and further research is needed to test the use of game engines for construction planning in different construction projects to verify its effectiveness. Future research could also explore the use of alternative game engines and compare their performance and results. Originality/value The authors proposed the use of game engine to simulate the construction process based on resources, working space and construction schedule. The developed tool can be used by end-users without simulation experience.
Resumo:
Australia is a leading user of collaborative procurement methods, which are used to deliver large and complex infrastructure projects. Project alliances, Early Contractor Involvement (ECI), and partnering are typical examples of collaborative procurement models. In order to increase procurement effectiveness and value for money (VfM), clients have adopted various learning strategies for new contract development. However client learning strategies and behaviours have not been systematically analysed before. Therefore, the current paper undertakes a literature review addressing the research question “How can client learning capabilities be effectively understood?”. From the resource-based and dynamic capability perspectives, this paper proposes that the collaborative learning capability (CLC) of clients drives procurement model evolution. Learning routines underpinning CLC carry out exploratory, transformative and exploitative learning phases associated with collaborative project delivery. This learning improves operating routines, and ultimately performance. The conceptualization of CLC and the three sequential learning phases is used to analyse the evidence in the construction management literature. The main contribution of this study is the presentation of a theoretical foundation for future empirical studies to unveil effective learning strategies, which help clients to improve the performance of collaborative projects in the dynamic infrastructure market.
Resumo:
With the current emerging development pattern in Malaysia, Malaysian government has enthusiastically promoted green procurement approach that will help the construction project being green. Previous studies highlighted that the concept of green procurement is still very new to the Malaysian construction industry, and this increases the needs for further research in this area. This paper addresses the needs of guidelines for stakeholders to procure environmentally-friendly construction. Currently, there is a limited practical guideline for stakeholders to procure green projects. This paper discusses the progress to date of a research project aimed at developing a green procurement framework for construction projects in the Malaysian construction industry. This framework will guide the stakeholders to plan the green procurement implementation to procure a construction projects. Through literature and expert opinion, this paper explores the list of green practices within procurement practices which becomes the basis to develop a survey instrument that will be used in the later part of this study. The paper will shed useful information for construction researchers and practitioners in exploring the green procurement concept for construction industry in Malaysia.
Resumo:
Employees’ safety climate perceptions dictate their safety behavior because individuals act based on their perceptions of reality. Extensive empirical research in applied psychology has confirmed this relationship. However, rare efforts have been made to investigate the factors contributing to a favorable safety climate in construction research. As an initial effort to address the knowledge gap, this paper examines factors contributing to a psychological safety climate, an operationalization of a safety climate at the individual level, and, hence, the basic element of a safety climate at higher levels. A multiperspective framework of contributors to a psychological safety climate is estimated by a structural equation modeling technique using individual questionnaire responses from a random sample of construction project personnel. The results inform management of three routes to psychological safety climate: a client’s proactive involvement in safety management, a workforce-friendly workplace created by the project team, and transformational supervisors’ communication about safety matters with the workforce. This paper contributes to the field of construction engineering and management by highlighting a broader contextual influence in a systematic formation of psychological safety climate perceptions.
Resumo:
Purpose – Preliminary cost estimates for construction projects are often the basis of financial feasibility and budgeting decisions in the early stages of planning and for effective project control, monitoring and execution. The purpose of this paper is to identify and better understand the cost drivers and factors that contribute to the accuracy of estimates in residential construction projects from the developers’ perspective. Design/methodology/approach – The paper uses a literature review to determine the drivers that affect the accuracy of developers’ early stage cost estimates and the factors influencing the construction costs of residential construction projects. It used cost variance data and other supporting documentation collected from two case study projects in South East Queensland, Australia, along with semi-structured interviews conducted with the practitioners involved. Findings – It is found that many cost drivers or factors of cost uncertainty identified in the literature for large-scale projects are not as apparent and relevant for developers’ small-scale residential construction projects. Specifically, the certainty and completeness of project-specific information, suitability of historical cost data, contingency allowances, methods of estimating and the estimator’s level of experience significantly affect the accuracy of cost estimates. Developers of small-scale residential projects use pre-established and suitably priced bills of quantities as the prime estimating method, which is considered to be the most efficient and accurate method for standard house designs. However, this method needs to be backed with the expertise and experience of the estimator. Originality/value – There is a lack of research on the accuracy of developers’ early stage cost estimates and the relevance and applicability of cost drivers and factors in the residential construction projects. This research has practical significance for improving the accuracy of such preliminary cost estimates.
Resumo:
Background Project archives are becoming increasingly large and complex. On construction projects in particular, the increasing amount of information and the increasing complexity of its structure make searching and exploring information in the project archive challenging and time-consuming. Methods This research investigates a query-driven approach that represents new forms of contextual information to help users understand the set of documents resulting from queries of construction project archives. Specifically, this research extends query-driven interface research by representing three types of contextual information: (1) the temporal context is represented in the form of a timeline to show when each document was created; (2) the search-relevance context shows exactly which of the entered keywords matched each document; and (3) the usage context shows which project participants have accessed or modified a file. Results We implemented and tested these ideas within a prototype query-driven interface we call VisArchive. VisArchive employs a combination of multi-scale and multi-dimensional timelines, color-coded stacked bar charts, additional supporting visual cues and filters to support searching and exploring historical project archives. The timeline-based interface integrates three interactive timelines as focus + context visualizations. Conclusions The feasibility of using these visual design principles is tested in two types of project archives: searching construction project archives of an educational building project and tracking of software defects in the Mozilla Thunderbird project. These case studies demonstrate the applicability, usefulness and generality of the design principles implemented.
Resumo:
"Safety of RMAA works is an almost uncharted topic of rising importance internationally. Small construction contractors are particularly dependant on RMAA work, especially during times of recession, and they undertake more risks on these jobs than large companies do. This book is based on unique international research and consultancy projects which detail, investigate, and suggest solutions to the specific challenges of safety in RMAA works, based on case studies. Starting with an overview of safety in the wider construction industries of developed countries, the first half of this book also provides a comprehensive summary of relevant rules, regulations, and the resulting safety performances. The systems in the UK, US and Hong Kong are described and contrasted, giving the reader an understanding of how different regulatory approaches have yielded a variety of results. From this solid introduction, specific problems observed in RMAA work are examined through case studies, with reference to the underlying cultural and demographic factors, and a variety of practical engineering and management solutions are explored. This important and practical international work is essential reading for postgraduate students of health and safety in construction, construction project management, or construction in developing countries, as well as policy-makers and construction project managers."--Publisher website
Resumo:
Triggered by the very quick proliferation of Internet connectivity, electronic document management (EDM) systems are now rapidly being adopted for managing the documentation that is produced and exchanged in construction projects. Nevertheless there are still substantial barriers to the efficient use of such systems, mainly of a psychological nature and related to insufficient training. This paper presents the results of empirical studies carried out during 2002 concerning the current usage of EDM systems in the Finnish construction industry. The studies employed three different methods in order to provide a multifaceted view of the problem area, both on the industry and individual project level. In order to provide an accurate measurement of overall usage volume in the industry as a whole telephone interviews with key personnel from 100 randomly chosen construction projects were conducted. The interviews showed that while around 1/3 of big projects already have adopted the use of EDM, very few small projects have adopted this technology. The barriers to introduction were investigated through interviews with representatives for half a dozen of providers of systems and ASP-services. These interviews shed a lot of light on the dynamics of the market for this type of services and illustrated the diversity of business strategies adopted by vendors. In the final study log files from a project which had used an EDM system were analysed in order to determine usage patterns. The results illustrated that use is yet incomplete in coverage and that only a part of the individuals involved in the project used the system efficiently, either as information producers or consumers. The study also provided feedback on the usefulness of the log files.
Resumo:
The complex, fragmented and diverse aspects of a sustainable development perspective are translated into an eight-point framework that defines a problem boundary larger than that traditionally adopted by civil engineers. This leads to practical questions intended to inform engineers who ask 'am I being sustainable?' during project implementation. The value of the questions is tested against a case history of a wastewater treatment project. This demonstrates the relevance of the questions to successive project delivery phases of defining the problem, choosing a solution and implementing that solution through design, construction and operation. The case history highlights that answers to several of the additional questions raised by considering this wider problem space are currently buried within government and clients' policies, regulations and standard practice; these answers may not be accessible to the professional engineer.
Resumo:
The Architecture, Engineering, Construction and Facilities Management (AEC/FM) industry is rapidly becoming a multidisciplinary, multinational and multi-billion dollar economy, involving large numbers of actors working concurrently at different locations and using heterogeneous software and hardware technologies. Since the beginning of the last decade, a great deal of effort has been spent within the field of construction IT in order to integrate data and information from most computer tools used to carry out engineering projects. For this purpose, a number of integration models have been developed, like web-centric systems and construction project modeling, a useful approach in representing construction projects and integrating data from various civil engineering applications. In the modern, distributed and dynamic construction environment it is important to retrieve and exchange information from different sources and in different data formats in order to improve the processes supported by these systems. Previous research demonstrated that a major hurdle in AEC/FM data integration in such systems is caused by its variety of data types and that a significant part of the data is stored in semi-structured or unstructured formats. Therefore, new integrative approaches are needed to handle non-structured data types like images and text files. This research is focused on the integration of construction site images. These images are a significant part of the construction documentation with thousands stored in site photographs logs of large scale projects. However, locating and identifying such data needed for the important decision making processes is a very hard and time-consuming task, while so far, there are no automated methods for associating them with other related objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.
Resumo:
This research assesses the effectiveness of current MSc. Construction Project Management programmes within the UK and Ireland. A review of published prospectuses is used to create questionnaires for universities, graduates and employers. Responses provide an insight into programme creation and their relative success in addressing the needs of industry and in achieving other educational objectives. Since the majority of learning institutions have attained professional accreditation, it is useful to review these awards and to assess their potential value to both graduates and industry alike. Interviews are conducted with representatives from the main professional accrediting bodies to understand their procedures and rigour in enforcing standards of education and training. The results show that project management education could be further enhanced by the inclusion of more practical learning and that current programmes place greater emphasis on hard skills at the expense of the softer human skills. There is clearly a need for a closer working relationship between academics and practitioners to tackle the perceived gap between theoretical learning and construction practice. Learning institutions can use the findings to improve their programmes and address the education deficiencies identified by the industry, by the professional institutions and by graduates.
Resumo:
The current body of literature regarding social inclusion and the arts tends to focus
on two areas: the lack of clear or common understanding of the terminology involved
(GLLAM, 2000) and the difficulty in measuring impact (Newman 2001). Further, much
of the literature traces the historical evolution of social inclusion policy within the arts
from a political and social perspective (Belfiore & Bennett, 2007), whilst others
examine the situation in the context of the museum as an institution more generally
(Sandell, 2002b). Such studies are essential; however they only touch on the
importance of understanding the context of social inclusion programmes. As each
individual’s experience of exclusion (or inclusion) is argued to be different (Newman
et al., 2005) and any experience is also process-based (SEU 2001), there is a need
for more thorough examination of the processes underpinning project delivery
(Butterfoss, 2006), particularly within a field that has its own issues of exclusion, such
as the arts (Bourdieu & Darbel, 1991). This paper presents case study findings of a
programme of contemporary arts participation for adults with learning difficulties
based at an arts centre in Liverpool. By focusing on practice, the paper applies
Wenger’s (1998) social theory of learning in order to assert that rather than search
for measurable impacts, examining the delivery of programmes within their individual
contexts will provide the basis for a more reflective practice and thus more effective
policy making.
Resumo:
The potential use of Irish-grown Sitka spruce for cross-laminated timber (CLT) manufacture is investigated as this would present new opportunities and novel products for Irish timber in the home and export markets. CLT is a prefabricated multilayer engineered wood product made of at least three orthogonally bonded layers of timber. In order to increase rigidity and stability, successive layers of boards are placed cross-wise to form a solid timber panel. Load-bearing CLT wall and floor panels are easily assembled on site to form multi-storey buildings. This improves construction and project delivery time, reduces costs,
and maximises efficiency on all levels.
The paper addresses the quality of the interface bond between the laminations making up the panels, which is of fundamental importance to the load bearing capacity. Therefore, shear tests were carried out on nine test bars of three glue lines each. Moreover, delamination tests were performed on samples subjected to accelerated aging, in order to assess the durability of bonds subjected to severe environmental conditions. In addition, this paper gives an indication on thickness tolerances of planed Irish Sitka spruce lamellas, which is likely to be a critical factor for bonding quality and adhesive selection. The test results of bond quality presented in this study were within requirements of prEN 16351:2013.