869 resultados para Building Design Process


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Chartered Institute of Building Service Engineers (CIBSE) produced a technical memorandum (TM36) presenting research on future climate impacting building energy use and thermal comfort. One climate projection for each of four CO2 emissions scenario were used in TM36, so providing a deterministic outlook. As part of the UK Climate Impacts Programme (UKCIP) probabilistic climate projections are being studied in relation to building energy simulation techniques. Including uncertainty in climate projections is considered an important advance to climate impacts modelling and is included in the latest UKCIP data (UKCP09). Incorporating the stochastic nature of these new climate projections in building energy modelling requires a significant increase in data handling and careful statistical interpretation of the results to provide meaningful conclusions. This paper compares the results from building energy simulations when applying deterministic and probabilistic climate data. This is based on two case study buildings: (i) a mixed-mode office building with exposed thermal mass and (ii) a mechanically ventilated, light-weight office building. Building (i) represents an energy efficient building design that provides passive and active measures to maintain thermal comfort. Building (ii) relies entirely on mechanical means for heating and cooling, with its light-weight construction raising concern over increased cooling loads in a warmer climate. Devising an effective probabilistic approach highlighted greater uncertainty in predicting building performance, depending on the type of building modelled and the performance factors under consideration. Results indicate that the range of calculated quantities depends not only on the building type but is strongly dependent on the performance parameters that are of interest. Uncertainty is likely to be particularly marked with regard to thermal comfort in naturally ventilated buildings.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

How does the work of designers impact on the safety of operatives at the construction site? Safety research and policy emphasize the importance of designing for safe construction, yet the interface between design and construction is poorly understood: accidents have multiple causes making it hard to establish causal links between design choices and safety outcomes. An in-depth case study of a major station project examines how professionals on the construction site perceive and manage the safety challenges of a building design. Analyses reveal understandings that, on the project studied, design has an impact on safety because of: (1) the timing of design work, where the volume of late design changes increased the difficulty of planning safe procedures, e.g. for working at height, lifting heavy items, refurbishing and demolishing old buildings; and (2) inputs from design stakeholders with insufficient practical knowledge of construction and operation required unplanned work-arounds, e.g. to coordinate different sub-systems, provide maintenance access, and manage loads during construction. These findings suggest that safety suffers where projects are under-designed, and that alongside regulation, there is a need for robust management attention to the contractual structures, incentives, processes and tools that enable clients and designers to understand material practices of construction and operation.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The solar and longwave environmental irradiance geometry (SOLWEIG) model simulates spatial variations of 3-D radiation fluxes and mean radiant temperature (T mrt) as well as shadow patterns in complex urban settings. In this paper, a new vegetation scheme is included in SOLWEIG and evaluated. The new shadow casting algorithm for complex vegetation structures makes it possible to obtain continuous images of shadow patterns and sky view factors taking both buildings and vegetation into account. For the calculation of 3-D radiation fluxes and T mrt, SOLWEIG only requires a limited number of inputs, such as global shortwave radiation, air temperature, relative humidity, geographical information (latitude, longitude and elevation) and urban geometry represented by high-resolution ground and building digital elevation models (DEM). Trees and bushes are represented by separate DEMs. The model is evaluated using 5 days of integral radiation measurements at two sites within a square surrounded by low-rise buildings and vegetation in Göteborg, Sweden (57°N). There is good agreement between modelled and observed values of T mrt, with an overall correspondence of R 2 = 0.91 (p < 0.01, RMSE = 3.1 K). A small overestimation of T mrt is found at locations shadowed by vegetation. Given this good performance a number of suggestions for future development are identified for applications which include for human comfort, building design, planning and evaluation of instrument exposure.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Environmental building assessment tools have been developed to measure how well or poorly a building is performing, or likely to perform, against a declared set of criteria, or environmental considerations, in order to achieve sustainability principles. Knowledge of environmental building assessment tools is therefore important for successful design and construction of environmentally friendly buildings for countries. The purpose of the research is to investigate the knowledge and level of awareness of environmental building assessment tools among industry practitioners in Botswana. One hundred and seven paper-based questionnaires were delivered to industry practitioners, including architects, engineers, quantity surveyors, real estate developers and academics. Users were asked what they know about building assessment, whether they have used any building assessment tool in the past, and what they perceive as possible barriers to the implementation of environmental building assessment tools in Botswana. Sixty five were returned and statistical analysis, using IBM SPSS V19 software, was used for analysis. Almost 85 per cent of respondents indicate that they are extremely or moderately aware of environmental design. Furthermore, the results indicate that 32 per cent of respondents have gone through formal training, which suggests ‘reasonable knowledge’. This however does not correspond with the use of the tools on the ground as 69 per cent of practitioners report never to have used any environmental building assessment tool in any project. The study highlights the need to develop an assessment tool for Botswana to enhance knowledge and further improve the level of awareness of environmental issues relating to building design and construction.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

It is widely accepted that there is a gap between design energy and real world operational energy consumption. The behaviour of occupants is often cited as an important factor influencing building energy performance. However, its consideration, both during design and operation, is overly simplistic, often assuming a direct link between attitudes and behaviour. Alternative models of decision making from psychology highlight a range of additional influential factors and emphasise that occupants do not always act in a rational manner. Developing a better understanding of occupant decision making could help inform office energy conservation campaigns as well as models of behaviour employed during the design process. This paper assesses the contribution of various behavioural constructs on small power consumption in offices. The method is based upon the Theory of Planned Behaviour (TPB) which assumes that intention is driven by three factors: attitude, subjective norms, and perceived behavioural control, but we also consider a fourth construct: habit measured through the Self- Report Habit Index (SRHI). A questionnaire was issued to 81 participants in two UK offices. Questionnaire results for each behavioural construct were correlated against each participant’s individual workstation electricity consumption. The intentional processes proposed by TPB could not account for the observed differences in occupants’ interactions with small power appliances. Instead, occupants were interacting with small power “automatically”, with habit accounting for 11% of the variation in workstation energy consumption. The implications for occupant behaviour models and employee engagement campaigns are discussed.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The intensification of the Urban Heat Island effect (UHI) is a problem that involves several fields, and new adequate solutions are required to mitigate its amplitude. The construction sector is strictly related with this phenomenon; in particular, roofs are the envelope components subject to the highest solar irradiance, hence any mitigation strategy should start from them and involve their appropriate design process. For this purpose, cool materials, i.e. materials which are able to reflect a large amount of solar radiation and avoid overheating of building surfaces have been deeply analyzed in the last years both at building and urban scales, showing their benefits especially in hot climates. However, green roofs also represent a possible way to cope with UHI, even if their design is not straightforward and requires taking into account many variables, strictly related with the local climatic conditions. In this context, the present paper proposes a comparison between cool roofs and green roofs for several Italian cities that are representative of different climatic conditions. In search of the most effective solution, the answers may be different depending on the perspective that leads the comparison, i.e. the need to reduce the energy consumption in buildings or the desire to minimize the contribution of the UHI effect.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The cost of a road construction over its service life is a function of the design, quality of construction, maintenance strategies and maintenance operations. Unfortunately, designers often neglect a very important aspect which is the possibility to perform future maintenance activities. The focus is mainly on other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This licentiate thesis is a part of a Ph.D. project entitled “Road Design for lower maintenance costs” that aims to examine how the life-cycle costs can be optimized by selection of appropriate geometrical designs for the roads and their components. The result is expected to give a basis for a new method used in the road planning and design process using life-cycle cost analysis with particular emphasis on road maintenance. The project started with a review of literature with the intention to study conditions causing increased needs for road maintenance, the efforts made by the road authorities to satisfy those needs and the improvement potential by consideration of maintenance aspects during planning and design. An investigation was carried out to identify the problems which obstruct due consideration of maintenance aspects during the road planning and design process. This investigation focused mainly on the road planning and design process at the Swedish Road Administration. However, the road planning and design process in Denmark, Finland and Norway were also roughly evaluated to gain a broader knowledge about the research subject. The investigation was carried out in two phases: data collection and data analysis. Data was collected by semi-structured interviews with expert actors involved in planning, design and maintenance and by a review of design-related documents. Data analyses were carried out using a method called “Change Analysis”. This investigation revealed a complex combination of problems which result in inadequate consideration of maintenance aspects. Several urgent needs for changes to eliminate these problems were identified. Another study was carried out to develop a model for calculation of the repair costs for damages of different road barrier types and to analyse how factors such as road type, speed limits, barrier types, barrier placement, type of road section, alignment and seasonal effects affect the barrier damages and the associated repair costs. This study was carried out using a method called the “Case Study Research Method”. Data was collected from 1087 barrier repairs in two regional offices of the Swedish Road Administration, the Central Region and the Western Region. A table was established for both regions containing the repair cost per vehicle kilometre for different combinations of barrier types, road types and speed limits. This table can be used by the designers in the calculation of the life-cycle costs for different road barrier types.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The cost of a road construction over its service life is a function of design, quality of construction as well as maintenance strategies and operations. An optimal life-cycle cost for a road requires evaluations of the above mentioned components. Unfortunately, road designers often neglect a very important aspect, namely, the possibility to perform future maintenance activities. Focus is mainly directed towards other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This doctoral thesis presents the results of a research project aimed to increase consideration of road maintenance aspects in the planning and design process. The following subgoals were established: Identify the obstacles that prevent adequate consideration of future maintenance during the road planning and design process; and Examine optimisation of life-cycle costs as an approach towards increased efficiency during the road planning and design process. The research project started with a literature review aimed at evaluating the extent to which maintenance aspects are considered during road planning and design as an improvement potential for maintenance efficiency. Efforts made by road authorities to increase efficiency, especially maintenance efficiency, were evaluated. The results indicated that all the evaluated efforts had one thing in common, namely ignorance of the interrelationship between geometrical road design and maintenance as an effective tool to increase maintenance efficiency. Focus has mainly been on improving operating practises and maintenance procedures. This fact might also explain why some efforts to increase maintenance efficiency have been less successful. An investigation was conducted to identify the problems and difficulties, which obstruct due consideration of maintainability during the road planning and design process. A method called “Change Analysis” was used to analyse data collected during interviews with experts in road design and maintenance. The study indicated a complex combination of problems which result in inadequate consideration of maintenance aspects when planning and designing roads. The identified problems were classified into six categories: insufficient consulting, insufficient knowledge, regulations and specifications without consideration of maintenance aspects, insufficient planning and design activities, inadequate organisation and demands from other authorities. Several urgent needs for changes to eliminate these problems were identified. One of the problems identified in the above mentioned study as an obstacle for due consideration of maintenance aspects during road design was the absence of a model for calculating life-cycle costs for roads. Because of this lack of knowledge, the research project focused on implementing a new approach for calculating and analysing life-cycle costs for roads with emphasis on the relationship between road design and road maintainability. Road barriers were chosen as an example. The ambition is to develop this approach to cover other road components at a later stage. A study was conducted to quantify repair rates for barriers and associated repair costs as one of the major maintenance costs for road barriers. A method called “Case Study Research Method” was used to analyse the effect of several factors on barrier repairs costs, such as barrier type, road type, posted speed and seasonal effect. The analyses were based on documented data associated with 1625 repairs conducted in four different geographical regions in Sweden during 2006. A model for calculation of average repair costs per vehicle kilometres was created. Significant differences in the barrier repair costs were found between the studied barrier types. In another study, the injuries associated with road barrier collisions and the corresponding influencing factors were analysed. The analyses in this study were based on documented data from actual barrier collisions between 2005 and 2008 in Sweden. The result was used to calculate the cost for injuries associated with barrier collisions as a part of the socio-economic cost for road barriers. The results showed significant differences in the number of injuries associated with collisions with different barrier types. To calculate and analyse life-cycle costs for road barriers a new approach was developed based on a method called “Activity-based Life-cycle Costing”. By modelling uncertainties, the presented approach gives a possibility to identify and analyse factors crucial for optimising life-cycle costs. The study showed a great potential to increase road maintenance efficiency through road design. It also showed that road components with low investment costs might not be the best choice when including maintenance and socio-economic aspects. The difficulties and problems faced during the collection of data for calculating life-cycle costs for road barriers indicated a great need for improving current data collecting and archiving procedures. The research focused on Swedish road planning and design. However, the conclusions can be applied to other Nordic countries, where weather conditions and road design practices are similar. The general methodological approaches used in this research project may be applied also to other studies.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Background  In order to facilitate the collaborative design, system dynamics (SD) with a group modelling approach was used in the early stages of planning a new stroke unit. During six workshops a SD model was created in a multiprofessional group. Aim To explore to which extent and how the use of system dynamics contributed to the collaborative design process. Method A case study was conducted using several data sources. Results SD supported a collaborative design, by facilitating an explicit description of stroke care process, a dialogue and a joint understanding. The construction of the model obliged the group to conceptualise the stroke care and experimentation with the model gave the opportunity to reflect on care. Conclusion SD facilitated the collaborative design process and should be integrated in the early stages of the design process as a quality improvement tool.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In the past, the focus of drainage design was on sizing pipes and storages in order to provide sufficient network capacity. This traditional approach, together with computer software and technical guidance, had been successful for many years. However, due to rapid population growth and urbanisation, the requirements of a “good” drainage design have also changed significantly. In addition to water management, other aspects such as environmental impacts, amenity values and carbon footprint have to be considered during the design process. Going forward, we need to address the key sustainability issues carefully and practically. The key challenge of moving from simple objectives (e.g. capacity and costs) to complicated objectives (e.g. capacity, flood risk, environment, amenity etc) is the difficulty to strike a balance between various objectives and to justify potential benefits and compromises. In order to assist decision makers, we developed a new decision support system for drainage design. The system consists of two main components – a multi-criteria evaluation framework for drainage systems and a multi-objective optimisation tool. The evaluation framework is used for the quantification of performance, life-cycle costs and benefits of different drainage systems. The optimisation tool can search for feasible combinations of design parameters such as the sizes, order and type of drainage components that maximise multiple benefits. In this paper, we will discuss real-world application of the decision support system. A number of case studies have been developed based on recent drainage projects in China. We will use the case studies to illustrate how the evaluation framework highlights and compares the pros and cons of various design options. We will also discuss how the design parameters can be optimised based on the preferences of decision makers. The work described here is the output of an EngD project funded by EPSRC and XP Solutions.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

o presente estudo é o resultado da pesquisa feita durante o Mestrado em Gestão Empresarial da Escola de Administração Pública e de Empresas, da Fundação Getúlio Vargas. Este trabalho buscou compreender a produção espacial da cidade de Belém, precisamente sobre a Vila da Barca, situada às margens da Baia do Guajará, região que teve alguns de seus moradores remanejados para o Projeto de Habitação e Urbanização do local como parte da política pública habitacional da área, realizada pelo Governo Municipal em parceria com o Governo Federal. Este projeto habitacional é gerenciado pela Secretaria Municipal de Habitação - SEHAB. O objetivo principal deste estudo voltou-se para a avaliação do Projeto de Habitação da Vila da Barca no sentido de identificar como se efetivou o processo de concepção, remanejamento e reinstalação das famílias do setor analisado. Além disso, buscou-se conhecer o que foi feito em relação ao desenvolvimento desse espaço urbano. A metodologia se desenvolveu em duas fases: aplicação de questionários aos moradores e, de entrevistas aos técnicos envolvidos (Gerente de Desenvolvimento Urbano (GIDUR); Técnico Social e Engenheiro, funcionários da Caixa Econômica Federal em Belém). A pesquisa procurou demonstrar a opinião dos envolvidos no processo de efetivação dessa política pública, compreender a produção desse espaço urbano em suas diferentes dimensões e perceber os aspectos positivos e negativos do projeto, verificando alguns elementos de construção desse espaço. Como conclusão, percebe-se que é preciso construir formas atuais eficazes de exercer por parte da sociedade o controle social sobre o poder do Estado e sobre os mecanismos que controlam o mercado. Esse é o desafio maior da contemporaneidade

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Esta dissertação se propõe a cartografar as redes sociotécnicas do design no campo do management nos moldes propostos pela Teoria Ator-Rede e apresentar o processo de translação pelo qual passou o termo ao adentrar no campo. Para tal, levantou e analisou artigos publicados sobre o tema nos principais periódicos da área de organizações e publicações. Estes textos demonstram como, nas últimas décadas, o design tem passado por uma expansão de sentido e aplicação na direção do management (ou do management no sentido do design), através das abordagens denominadas design thinking, design science ou design process. A pesquisa se justifica, uma vez que este assunto está presente nos principais periódicos do management e dos estudos organizacionais, como uma importante ferramenta para solução de problemas que desafiam os sistemas organizacionais, como: a mudança, o empreendedorismo e a inovação (Stephens & Boland, 2014). É importante destacar que o design tem sido cada vez mais considerado uma atividade decisiva na batalha econômica (Callon, 1986), na determinação dos atuais estilos de vida (lifestyle) e na construção de nosso mundo futuro. No campo dos estudos organizacionais, como demonstrou esta pesquisa, o design surge como uma abordagem que supera a dicotomia entre positivismo e a abordagem crítica na teoria organizacional (Jelinek, Romme & Boland, 2008). Por fim, esta dissertação se ateve à cartografia das redes sociotécnicas e à descrição das quatro principais fases do processo de translação do design no campo do management, a saber: (a) problematização, marcada pela publicação de The Sciences of Artificial em 1969 de Herbert A. Simon, no qual, ele argumenta pelo design como uma habilidade básica para todas as especialidades profissionais, incluindo a gestão (Simon, 1996), (b) interessamento, designers defendendo um design de sistemas complexos como as organizações, (c) engajamento, designers e teóricos das organizações juntos pelo design no management como uma alternativa para a superação da dicotomia entre positivismo e os estudos críticos na administração, e, (d) mobilização, na qual os teóricos das organizações partem em defesa do design no management como um forma de dar conta de modelos organizacionais contemporâneos com fronteiras mais permeáveis e em constante reformulação

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Generalized hyper competitiveness in the world markets has determined the need to offer better products to potential and actual clients in order to mark an advantagefrom other competitors. To ensure the production of an adequate product, enterprises need to work on the efficiency and efficacy of their business processes (BPs) by means of the construction of Interactive Information Systems (IISs, including Interactive Multimedia Documents) so that they are processed more fluidly and correctly.The construction of the correct IIS is a major task that can only be successful if the needs from every intervenient are taken into account. Their requirements must bedefined with precision, extensively analyzed and consequently the system must be accurately designed in order to minimize implementation problems so that the IIS isproduced on schedule and with the fewer mistakes as possible. The main contribution of this thesis is the proposal of Goals, a software (engineering) construction process which aims at defining the tasks to be carried out in order to develop software. This process defines the stakeholders, the artifacts, and the techniques that should be applied to achieve correctness of the IIS. Complementarily, this process suggests two methodologies to be applied in the initial phases of the lifecycle of the Software Engineering process: Process Use Cases for the phase of requirements, and; MultiGoals for the phases of analysis and design. Process Use Cases is a UML-based (Unified Modeling Language), goal-driven and use case oriented methodology for the definition of functional requirements. It uses an information oriented strategy in order to identify BPs while constructing the enterprise’s information structure, and finalizes with the identification of use cases within the design of these BPs. This approach provides a useful tool for both activities of Business Process Management and Software Engineering. MultiGoals is a UML-based, use case-driven and architectural centric methodology for the analysis and design of IISs with support for Multimedia. It proposes the analysis of user tasks as the basis of the design of the: (i) user interface; (ii) the system behaviour that is modeled by means of patterns which can combine Multimedia and standard information, and; (iii) the database and media contents. This thesis makes the theoretic presentation of these approaches accompanied with examples from a real project which provide the necessary support for the understanding of the used techniques.