894 resultados para Benefit-Cost Analysis


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Preventive Maintenance (PM) is often applied to improve the reliability of production lines. A Split System Approach (SSA) based methodology is presented to assist in making optimal PM decisions for serial production lines. The methodology treats a production line as a complex series system with multiple (imperfect) PM actions over multiple intervals. The conditional and overall reliability of the entire production line over these multiple PM intervals are hierarchically calculated using SSA, and provide a foundation for cost analysis. Both risk-related cost and maintenance-related cost are factored into the methodology as either deterministic or random variables. This SSA based methodology enables Asset Management (AM) decisions to be optimised considering a variety of factors including failure probability, failure cost, maintenance cost, PM performance, and the type of PM strategy. The application of this new methodology and an evaluation of the effects of these factors on PM decisions are demonstrated using an example. The results of this work show that the performance of a PM strategy can be measured by its Total Expected Cost Index (TECI). The optimal PM interval is dependent on TECI, PM performance and types of PM strategies. These factors are interrelated. Generally, it was found that a trade-off between reliability and the number of PM actions needs to be made so that one can minimise Total Expected Cost (TEC) for asset maintenance.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Sustainability needs to be embedded throughout the life-cycle of a construction project. From project conception, planning, design, construction stage, operation and maintenance to demolition, each phase of development should embrace principles of sustainability and the stakeholder involved should be empowered with the necessary skills. Past research explored the importance of ensuring sustainability measures during the occupancy phase based on considerations of Life-Cycle Cost Analysis and a project’s long-term detrimental impact on the environment. Facility managers are in a unique position to promote sustainability over longer periods of project engagement and can apply a high level of influence on the built assets through management and upgrades. There is growing interest among facility managers in incorporating sustainability measures into day-to-day practice. More, however, needs to be done. Previous studies have identified barriers such as the lack of sustainability knowledge and skills, poor access to information, and unwillingness to change among facility management (FM) practitioners and stakeholders. This inhibits proper implementation of sustainable practices in the FM sector. A number of key factors, such as knowledge discrepancy, time constraints, diversity of FM functions and a lack of incentives, require urgent remedy. The capability of FM professionals and stakeholders will be a key enabler in managing the sustainability agenda, as it is central to the improvement of competency and innovation in an organization. Compared to the attempts at developing sustainability guidelines and performance measurement, research efforts relating to people capabilities and skills are still lagging behind. This paper discusses the progress to date of a research project aimed at formulating a people capabilities framework for sustainable FM practices based on expert opinions and industry feedback. Through literature review, the paper explores the challenges of incorporating sustainability principles into general FM practices before focusing specifically on FM personnel capabilities that may impact on the implementation of a holistic sustainability agenda in real life practice. The results of an industry survey are used to propose an action framework to identify, promote and utilise people capabilities in order to promote sustainability integration in FM practices. The paper provides a useful information source for FM personnel and organizations to bridge the gap between extensive tools on sustainable design and construction assessment at the front end and the need to maintain focus throughout the project life-cycle.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

We wished to determine whether changing our centre's practice of using Acticoat instead of Silvazine as our first-line burns dressing provided a better standard of care in terms of efficacy, cost and ease of use. A retrospective cohort study was performed examining 328 Silvazine treated patients from January 2000 to June 2001 and 241 Acticoat treated patients from July 2002 to July 2003. During those periods the respective dressings were used exclusively. There was no significant difference in age, %BSA and mechanism of burn between the groups. In the Silvazine group, 25.6% of children required grafting compared to 15.4% in the Acticoat group (p=0.001). When patients requiring grafting were excluded, the time taken for re-epithelialisation in the Acticoat group (14.9 days) was significantly less than that for the Silvazine group (18.3 days), p=0.047. There were more wounds requiring long term scar management in the Silvazine group (32.6%) compared to the Acticoat group (29.5%), however this was not significant. There was only one positive blood culture in each group, indicating that both Silvazine and Acticoat are potent antimicrobial agents. The use of Acticoat as our primary burns dressing has dramatically changed our clinical practice. Inpatients are now only 18% of the total admissions, with the vast majority of patients treated on an outpatient basis. In terms of cost, Acticoat was demonstrated to be less expensive over the treatment period than Silvazine . We have concluded that Acticoat is a safe, cost-effective, efficacious dressing that reduces the time for re-epithelialisation and the requirement for grafting and long term scar management, compared to Silvazine.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Background Maintenance of communication is important for people with dementia living in long-term care. The purpose of this study was to assess the feasibility of using “Giraff”, a telepresence robot to enhance engagement between family and a person with dementia living in long-term care. Methods A mixed-methods approach involving semi-structured interviews, call records and video observational data was used. Five people with dementia and their family member participated in a discussion via the Giraff robot for a minimum of six times over a six-week period. A feasibility framework was used to assess feasibility and included video analysis of emotional response and engagement. Results Twenty-six calls with an average duration of 23 mins took place. Residents showed a general state of positive emotions across the calls with a high level of engagement and a minimal level of negative emotions. Participants enjoyed the experience and families reported that the Giraff robot offered the opportunity to reduce social isolation. A number of software and hardware challenges were encountered. Conclusions Participants perceived this novel approach to engage families and people with dementia as a feasible option. Participants were observed and also reported to enjoy the experience. The technical challenges identified have been improved in a newer version of the robot. Future research should include a feasibility trial of longer duration, with a larger sample and a cost analysis.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Road crashes and injuries have become a growing issue worldwide. In 2011, more than 75,000 people died in road crashes in the ten member countries of the Association of South East Asian Nations (ASEAN) and many times this number sustained long term injuries. In 2014, the Asian Development Bank (ADB), funded by the Japan Fund for Poverty Reduction, commenced a package of actions to improve road safety in ASEAN. In 2015, as part of the technical assistance for this project, a Road Safety Advisor was appointed for Cambodia for four months. The assignment produced several primary outputs, which included the organization of national training on traffic law enforcement and road safety management, the conduct of a training needs survey and cost analysis study, and the development of a proposal for strengthening speed management. It is important to note that unlike other ADB technical assistance projects, this assignment adopted a capacity building approach, which promoted and encouraged the local road safety team in the government to step up and take action. The research capacity building approach adopted in this project highlighted the feasibility of increasing participation from existing stakeholders, especially the government in identifying existing human resources, building the capacity of relevant government officials and supporting them to take the ownership of the project. It is hoped that similar outcomes will occur in the other ASEAN countries.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Genetic mark–recapture requires efficient methods of uniquely identifying individuals. 'Shadows' (individuals with the same genotype at the selected loci) become more likely with increasing sample size, and bias harvest rate estimates. Finding loci is costly, but better loci reduce analysis costs and improve power. Optimal microsatellite panels minimize shadows, but panel design is a complex optimization process. locuseater and shadowboxer permit power and cost analysis of this process and automate some aspects, by simulating the entire experiment from panel design to harvest rate estimation.

Relevância:

80.00% 80.00%

Publicador:

Relevância:

80.00% 80.00%

Publicador:

Resumo:

- Objective To compare health service cost and length of stay between a traditional and an accelerated diagnostic approach to assess acute coronary syndromes (ACS) among patients who presented to the emergency department (ED) of a large tertiary hospital in Australia. - Design, setting and participants This historically controlled study analysed data collected from two independent patient cohorts presenting to the ED with potential ACS. The first cohort of 938 patients was recruited in 2008–2010, and these patients were assessed using the traditional diagnostic approach detailed in the national guideline. The second cohort of 921 patients was recruited in 2011–2013 and was assessed with the accelerated diagnostic approach named the Brisbane protocol. The Brisbane protocol applied early serial troponin testing for patients at 0 and 2 h after presentation to ED, in comparison with 0 and 6 h testing in traditional assessment process. The Brisbane protocol also defined a low-risk group of patients in whom no objective testing was performed. A decision tree model was used to compare the expected cost and length of stay in hospital between two approaches. Probabilistic sensitivity analysis was used to account for model uncertainty. - Results Compared with the traditional diagnostic approach, the Brisbane protocol was associated with reduced expected cost of $1229 (95% CI −$1266 to $5122) and reduced expected length of stay of 26 h (95% CI −14 to 136 h). The Brisbane protocol allowed physicians to discharge a higher proportion of low-risk and intermediate-risk patients from ED within 4 h (72% vs 51%). Results from sensitivity analysis suggested the Brisbane protocol had a high chance of being cost-saving and time-saving. - Conclusions This study provides some evidence of cost savings from a decision to adopt the Brisbane protocol. Benefits would arise for the hospital and for patients and their families.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A competição atualmente vivida pelas organizações tem despertado o interesse em desenvolver formas de superar a concorrência e com isso, prosperar no mercado. Uma das formas de superar a concorrência é gerir os custos de forma estratégica para que seja possível superar a concorrência. A gestão estratégica de custos tem por finalidade ampliar os horizontes da análise de custos, ou seja, ela visa cobrir as deficiências existentes nos sistemas tradicionais de custeio, pois em sua análise irá considerar a cadeia de valor como um todo e não somente os processos internos em que há agregação de valor por parte da empresa. Assim, o objetivo da presente pesquisa foi investigar as características dos sistemas de custos e como as empresas da indústria de construção naval do Estado do Rio de Janeiro estão utilizando informações de custos para dar suporte à gestão estratégica, procurando investigar aspectos relativos a esta prática; assim, tem-se como propósito verificar a aplicação da teoria no setor. Para isso, foram realizados estudos casos em cinco empresas da indústria de construção naval, as empresas estudadas, constituem uma amostra não probabilística, ou seja, amostra por acessibilidade. O estudo constatou que mesmo às empresas não utilizando o método de custeio recomendando pela literatura, é dada uma especial atenção nas transações ocorridas ao longo da cadeia de valor, o que permite gerir os custos de maneira eficiente. Isso mostra a proximidade de diversas ações tomadas pelas empresas estudadas e a literatura sobre gestão estratégica de custos

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Esta tese realiza uma análise de custo de um programa de prevenção de internação hospitalar para idosos (acima de 65 anos), no ambiente da saúde suplementar. Trata-se um programa voltado para idosos considerados de risco, de acordo com um questionário que avalia a probabilidade de risco de internação hospitalar. Indivíduos de risco são convidados a participar do programa, quando se estabelecem dois grupos: um que aceita a intervenção do programa (Grupo Bem Viver) e outro que recusa (Grupo Recusa). A intervenção do programa está voltada para o acompanhamento domiciliar, com equipe multidisciplinar, que se efetiva de acordo com uma estratificação, segundo a avaliação da dependência funcional para os indivíduos. Essa estratificação funcional divide os idosos do programa em cinco grupos distintos, denominados grupos funcionais. Indivíduos que recusam a intervenção mantêm a assistência com cuidado usual. A análise de custo é uma avaliação econômica parcial que estabelece uma comparação da utilização de serviços de saúde entre os dois grupos de idosos: um sob intervenção, grupo Bem Viver, e outro em cuidado usual, grupo Recusa. Esta análise foi realizada para um período dividido em 12 meses antes do evento (intervenção ou recusa) e 12 meses após o evento. Levantou-se a utilização de serviços de saúde de acordo com os indicadores de consultas, exames, procedimentos ambulatoriais, internações e consultas hospitalares. O custo do programa foi incluído também na análise final. Comparações foram estabelecidas entre os grupos no padrão de utilização, considerando-se os períodos antes e depois do evento. Os grupos funcionais foram analisados dentro da perspectiva da utilização para os mesmos períodos. Os resultados demonstraram que o grupo com adesão tem um grande percentual de indivíduos com dependência funcional, sugerindo que existe uma seleção adversa na aceitação do programa, quando indivíduos de maior risco têm adesão. Para o grupo sob intervenção, ocorreu um aumento da utilização com os serviços de saúde no conjunto de consultas, exames e procedimentos ambulatoriais, havendo diminuição com o custo unitário das internações hospitalares e consultas hospitalares. O grupo que recusa tem discreto aumento para o conjunto de consultas, exames e procedimentos ambulatoriais e um grande percentual de aumento para as internações (+40.2%) e consultas hospitalares (34.3%). Este resultado para internações foi analisado também através da transformação logarítmica, com uso da função inversa para a base de cálculo. Nesta aplicação estatística foi confirmado esse resultado para o padrão de utilização de internações. Na análise final, que incluiu o custo do programa propriamente dito, foi apresentada uma hipótese de avaliação para o grupo Bem Viver, sem a intervenção do programa. Desta maneira, realizou-se uma projeção para a utilização do grupo Bem Viver, a partir dos percentuais atingidos pelo grupo Recusa.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A crescente utilização do aço inoxidável como elemento estrutural despertou o interesse de clientes, arquitetos e engenheiros nos últimos anos. Apesar do custo ainda elevado, a sua aplicação na construção civil vem substituindo outros elementos estruturais. Seja por sua alta resistência à corrosão, aumentando a relação custo benefício; sua estética, proporcionando formas cada vez mais ousadas ou; seu apelo ambiental, gerando menos resíduos no meio ambiente. As subestações representam um papel importante no fornecimento de energia. Como possuem grande complexidade para manutenção, foi escolhida a estrutura suporte de seu barramento, para o dimensionamento em aço inoxidável. Desta forma, minimizando as paradas para realização de manutenções das estruturas, possibilitando maior qualidade no fornecimento de energia elétrica. Para fins comparativos foi escolhido o projeto de uma SE existente, cuja estrutura de suporte do barramento, foi construída por treliças formadas por cantoneiras de aço carbono galvanizado. Inicialmente, o dimensionamento foi desenvolvido utilizando perfis H e I funcionando como viga-coluna para os dois tipos de aço. Num segundo momento, a estrutura foi dimensionada como treliças planas. Todos os dimensionamentos foram realizados de acordo com as prescrições normativas do EUROCODE 3. Após realização dos dimensionamentos, foram apresentadas as análises comparativas dos custos envolvidos para os tipos de aço. Abordando o investimento inicial, os gastos com manutenção ao longo da vida e os custos elétricos agregados à redução das paradas para manutenção.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O presente trabalho visa caracterizar os acidentes com envolvimento de motocicletas no perímetro urbano de Paranavaí-PR, em 2007, e estimar o impacto econômico das internações advindas destes, na perspectiva do Sistema Único de Saúde (SUS) e para o Seguro obrigatório que cobre danos pessoais causados por veículos automotores de via terrestre (DPVAT). Trata-se de um estudo transversal, retrospectivo, que se baseia em buscas e análises das bases de dados do Serviço integrado de atendimento ao trauma e emergência (SIATE), do DPVAT e do Sistema de informações sobre internações do SUS (SIH-SUS), com vias a análise das variáveis: gênero, idade, tipo de acidente, condição da vítima no acidente, mês da ocorrência, gravidade, frequência de internação hospitalar, custo, componentes de custo, óbitos e tempo médio de permanência no SUS. A busca ocorreu, primeiramente, no sistema do SIATE para conhecer todos os acidentados com envolvimento de motocicletas no perímetro urbano de Paranavaí, no ano de 2007. De posse desses nomes, as buscas seguintes ocorreram no sistema interno do DPVAT e no SIH-SUS. O profissional do SIATE, no momento da abordagem da ocorrência julga a gravidade da vítima conforme códigos, sendo 1 para ferimentos leves, 2 para graves sem risco à vida, 3, graves com risco à vida e 4, os óbitos. A população estudada constou de 655 vítimas (440 homens e 215 mulheres), com média de idade de 29,5 anos, sendo que 598 (91,3%) saíram lesionadas e 11 (1,7%) vieram a óbito. O condutor de motocicleta foi o mais acometido e o tipo de acidente mais comum aconteceu entre um automóvel e uma motocicleta. Com relação à frequência da internação hospitalar (pelo SUS, DPVAT ou ambos), foi, em média, de 27% (177 de 655). Do total de vítimas internadas verificou-se que 106 tiveram cobertura do DPVAT, 58 do SUS e 13 de ambos. As internações pelo DPVAT geraram um custo total de R$ 191.423,43, custo médio de R$ 1.608,60 por internação. Com relação aos custos das internações do SUS, os referidos acidentes geraram o pagamento de R$ 42.342,20, perfazendo a média de R$ 450,44 por AIH e de R$ 596,37 por paciente. O custo médio da internação dos acidentes de trânsito com envolvimento de motocicletas foi de R$ 1.321,00, sendo que para o código 1 foi de R$ 885,00, para o código 2 de R$ 1.377,00 e para o código 3 de R$ 2.034,00. Portanto, foi possível caracterizar os acidentes e chegar a estimativas de quanto se gasta com as internações advindas destes, além disso, este é um indicativo claro da necessidade de adotar políticas públicas que priorizem a aplicação dos recursos financeiros e humanos na redução dos acidentes e da sua gravidade.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Em 2004 o governo federal anunciou um novo mecanismo para melhorar o acesso da população brasileira aos medicamentos, chamado de "Programa Farmácia Popular do Brasil" (PFPB) que disponibiliza um rol de produtos subsidiados pelo governo, utilizando ou não sistema de copagamento. O PFPB está dividido em três vertentes: (a) no setor público, chamada Rede Própria; (b) expansão em 2006, com o comércio farmacêutico denominado "Aqui Tem Farmácia Popular" (ATFP) e; (c) isenção de copagamento, em 2011, em todas as farmácias no âmbito do Programa, para anti-hipertensivos, antidiabéticos e antiasmáticos. Este estudo examinou o modelo de provisão de medicamentos na versão ATFP, comparando-o ao tradicionalmente praticado na Secretaria Municipal de Saúde do Rio de Janeiro (SMS-Rio), com vistas a avaliar seus custos para os setores públicos envolvidos. Foram levantados os gastos do Ministério da Saúde (MS) com pagamentos no Programa ATFP em fontes secundárias, como o Fundo Nacional de Saúde e a Sala de Apoio à Gestão Estratégica, de 2006 a 2012. Dados sobre o volume de pagamentos por medicamentos, perfil dos usuários atendidos e unidades farmacotécnicas (UF) dispensadas foram mapeados por contato direto com o Sistema Eletrônico do Serviço de Informações ao Cidadão. Estimativas dos custos da SMS-Rio, com aquisição, logística e dispensação de 25 medicamentos, restritas ao ano de 2012, foram realizadas. No período ocorreu forte expansão do Programa ATFP, tanto de unidades credenciadas, como de municípios cobertos, de 750% e 528%, respectivamente. Gastos federais com medicamentos no ATFP foram de aproximadamente R$ 3,4 bilhões, em valores ajustados para 31/12/2012. Houve inversão do fluxo dos pagamentos para entidades com matriz fora das capitais, representando aumento da capilaridade do Programa, e relativa concentração de pagamentos em grandes redes varejistas. No município do Rio de Janeiro, estes gastos foram superiores a R$ 260 milhões e, desde 2008, são maiores que as transferências do MS para aquisição de medicamentos básicos. Custos comparativos entre o menor Valor de Referência (VR) do Programa ATFP, e o custo estimado por UF na SMS-Rio dos medicamentos mostrou-se, na média geral, quase 255% vezes maior que o custo municipal. A comparação de custo foi mais favorável à SMS-Rio em 20 dos 25 itens comuns. Simulação considerando a demanda de cada medicamento consumido pela SMS-Rio em 2012 mostrou que, se a municipalidade os adquirisse pelo menor VR, incorreria em mais de R$ 95 milhões no custo global para os mesmos 25 produtos. O programa ministerial representou melhoria no acesso a medicamentos, mas os gastos expressivos repercutem em sua interface com o sistema descentralizado de financiamento da assistência farmacêutica. Alguns dos VR poderiam ser objetos de exame e avaliação, frente aos custos sistematicamente mais favoráveis nos valores levantados para a SMS-Rio.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Performance of both paddy (Var. NC 492) and prawn Penaeus monodon were assessed for two years during wet-season in rainfed lowland ecosystem with a view to study the economic viability of paddy-cum-prawn culture in the coastal saline zone of West Bengal. Both mono and dual culture of paddy and prawn were tried in the study. Fingerlings of prawn (α 35,000 haˉ¹) of 10-15 mm size were reared for about three and half months with and without fish feed. It was observed that addition of fish feed resulted in higher (57.7%) production of prawn (2.65 mg/haˉ¹) but not rice. Such increase in prawn production was 1.6 times higher when no feed was provided and 1.4 times higher when grown as sole crop. However, paddy, whether grown as mono or mixed culture, did not differ in yield significantly. In dual culture, the benefit - cost ratio was higher (6.83) when prawn was grown with feed and it was maximum (36.0) when grown without feed as sole crop. The study, therefore, indicates that paddy-cum-prawn culture under low land ecosystem of the coastal saline zone is enterprising particularly for small and marginal farmers who fear to take risk of growing prawn alone at the cost of paddy.