895 resultados para 230117 Operations Research
Resumo:
Earthwork planning has been considered in this article and a generic block partitioning and modelling approach has been devised to provide strategic plans of various levels of detail. Conceptually this approach is more accurate and comprehensive than others, for instance those that are section based. In response to environmental concerns the metric for decision making was fuel consumption and emissions. Haulage distance and gradient are also included as they are important components of these metrics. Advantageously the fuel consumption metric is generic and captures the physical difficulties of travelling over inclines of different gradients, that is consistent across all hauling vehicles. For validation, the proposed models and techniques have been applied to a real world road project. The numerical investigations have demonstrated that the models can be solved with relatively little CPU time. The proposed block models also result in solutions of superior quality, i.e. they have reduced fuel consumption and cost. Furthermore the plans differ considerably from those based solely upon a distance based metric thus demonstrating a need for industry to reflect upon their current practices.
Resumo:
In this paper, a demand-responsive decision support system is proposed by integrating the operations of coal shipment, coal stockpiles and coal railing within a whole system. A generic and flexible scheduling optimisation methodology is developed to identify, represent, model, solve and analyse the coal transport problem in a standard and convenient way. As a result, the integrated train-stockpile-ship timetable is created and optimised for improving overall efficiency of coal transport system. A comprehensive sensitivity analysis based on extensive computational experiments is conducted to validate the proposed methodology. The mathematical proposition and proof are concluded as technical and insightful advices for industry practice. The proposed methodology provides better decision making on how to assign rail rolling-stocks and upgrade infrastructure in order to significantly improve capacity utilisation with the best resource-effectiveness ratio. The proposed decision support system with train-stockpile-ship scheduling optimisation techniques is promising to be applied in railway or mining industry, especially as a useful quantitative decision making tool on how to use more current rolling-stocks or whether to buy additional rolling-stocks for mining transportation.
Resumo:
A multi-resource multi-stage scheduling methodology is developed to solve short-term open-pit mine production scheduling problems as a generic multi-resource multi-stage scheduling problem. It is modelled using essential characteristics of short-term mining production operations such as drilling, sampling, blasting and excavating under the capacity constraints of mining equipment at each processing stage. Based on an extended disjunctive graph model, a shifting-bottleneck-procedure algorithm is enhanced and applied to obtain feasible short-term open-pit mine production schedules and near-optimal solutions. The proposed methodology and its solution quality are verified and validated using a real mining case study.
Resumo:
Too often the relationship between client and external consultants is perceived as one of protagonist versus antogonist. Stories on dramatic, failed consultancies abound, as do related anecdotal quips. A contributing factor to many "apparently" failed consultancies is a poor appreciation by both the client and consultant of the client's true goals for the project and how to assess progress toward these goals. This paper presents and analyses a measurement model for assessing client success when engaging an external consultant. Three main areas of assessment are identified: (1) the consultant;s recommendations, (2) client learning, and (3) consultant performance. Engagement success is emperically measured along these dimensions through a series of case studies and a subsequent survey of clients and consultants involved in 85 computer-based information system selection projects. Validation fo the model constructs suggests the existence of six distinct and individually important dimensions of engagement success. both clients and consultants are encouraged to attend to these dimensions in pre-engagement proposal and selection processes, and post-engagement evaluation of outcomes.
Resumo:
Addressing the Crew Scheduling Problem (CSP) in transportation systems can be too complex to capture all details. The designed models usually ignore or simplify features which are difficult to formulate. This paper proposes an alternative formulation using a Mixed Integer Programming (MIP) approach to the problem. The optimisation model integrates the two phases of pairing generation and pairing optimisation by simultaneously sequencing trips into feasible duties and minimising total elapsed time of any duty. Crew scheduling constraints in which the crew have to return to their home depot at the end of the shift are included in the model. The flexibility of this model comes in the inclusion of the time interval of relief opportunities, allowing the crew to be relieved during a finite time interval. This will enhance the robustness of the schedule and provide a better representation of real-world conditions.
Resumo:
A salient but rarely explicitly studied characteristic of interfirm relationships is that they can intentionally be formed for finite periods of time. What determines firms' intertemporal choices between different alliance time horizons? Shadow of the future theorists suggest that when an alliance has an explicitly set short-term time frame, there is an increased risk that partners may behave opportunistically. This does not readily explain the high incidence of time-bound alliances being formed. Reconciling insights from the shadow of the future perspective with nascent research on the flexibility of temporary organizations, and shifting the focus from the level of individual transactions to that of strategic alliance portfolios, we argue that firms may be willing to accept a higher risk of opportunism when there are offsetting gains in strategic flexibility in managing their strategic alliance portfolio. Consequently, we hypothesize that environmental factors that increase the need for strategic flexibility—namely, dynamism and complexity in the environment—are likely to increase the relative share of time-bound alliances in strategic alliance portfolios. Our analysis of longitudinal data on the intertemporal alliance choices of a large sample of small and medium-sized enterprises provides support for this argument. Our findings fill an important gap in theory about time horizons in interfirm relationships and temporary organizations and show the importance of separating planned terminations from duration-based performance measures.
Resumo:
Bandwidths and offsets are important components in vehicle traffic control strategies. This article proposes new methods for quantifying and selecting them. Bandwidth is the amount of green time available for vehicles to travel through adjacent intersections without the requirement to stop at the second traffic light. The offset is the difference between the starting-time of ``green'' periods at two adjacent intersections, along a given route. The core ideas in this article were developed during the 2013 Maths and Industry Study Group in Brisbane, Australia. Analytical expressions for computing bandwidth, as a function of offset, are developed. An optimisation model, for selecting offsets across an arterial, is proposed. Arterial roads were focussed upon, as bandwidth and offset have a greater impact on these types of road as opposed to a full traffic network. A generic optimisation-simulation approach is also proposed to refine an initial starting solution, according to a specified metric. A metric that reflects the number of stops, and the distance between stops, is proposed to explicitly reduce the dissatisfaction of road users, and to implicitly reduce fuel consumption and emissions. Conceptually the optimisation-simulation approach is superior as it handles real-life complexities and is a global optimisation approach. The models and equations in this article can be used in road planning and traffic control.
Resumo:
Planning techniques for large scale earthworks have been considered in this article. To improve these activities a “block theoretic” approach was developed that provides an integrated solution consisting of an allocation of cuts to fills and a sequence of cuts and fills over time. It considers the constantly changing terrain by computing haulage routes dynamically. Consequently more realistic haulage costs are used in the decision making process. A digraph is utilised to describe the terrain surface which has been partitioned into uniform grids. It reflects the true state of the terrain, and is altered after each cut and fill. A shortest path algorithm is successively applied to calculate the cost of each haul, and these costs are summed over the entire sequence, to provide a total cost of haulage. To solve this integrated optimisation problem a variety of solution techniques were applied, including constructive algorithms, meta-heuristics and parallel programming. The extensive numerical investigations have successfully shown the applicability of our approach to real sized earthwork problems.
Resumo:
The top-k retrieval problem aims to find the optimal set of k documents from a number of relevant documents given the user’s query. The key issue is to balance the relevance and diversity of the top-k search results. In this paper, we address this problem using Facility Location Analysis taken from Operations Research, where the locations of facilities are optimally chosen according to some criteria. We show how this analysis technique is a generalization of state-of-the-art retrieval models for diversification (such as the Modern Portfolio Theory for Information Retrieval), which treat the top-k search results like “obnoxious facilities” that should be dispersed as far as possible from each other. However, Facility Location Analysis suggests that the top-k search results could be treated like “desirable facilities” to be placed as close as possible to their customers. This leads to a new top-k retrieval model where the best representatives of the relevant documents are selected. In a series of experiments conducted on two TREC diversity collections, we show that significant improvements can be made over the current state-of-the-art through this alternative treatment of the top-k retrieval problem.
Resumo:
Identifying railway capacity is an important task that can identify "in principal" whether the network can handle an intended traffic flow, and whether there is any free capacity left for additional train services. Capacity determination techniques can also be used to identify how best to improve an existing network, and at least cost. In this article an optimization approach has been applied to a case study of the Iran national railway, in order to identify its current capacity and to optimally expand it given a variety of technical conditions. This railway is very important in Iran and will be upgraded extensively in the coming years. Hence the conclusions in this article may help in that endeavor. A sensitivity analysis is recommended to evaluate a wider range of possible scenarios. Hence more useful lower and upper bounds can be provided for the performance of the system
Resumo:
In this article an alternate sensitivity analysis is proposed for train schedules. It characterises the schedules robustness or lack thereof and provides unique profiles of performance for different sources of delay and for different values of delay. An approach like this is necessary because train schedules are only a prediction of what will actually happen. They can perform poorly with respect to a variety of performance metrics, when deviations and other delays occur, if for instance they can even be implemented, and as originally intended. The information provided by this analytical approach is beneficial because it can be used as part of a proactive scheduling approach to alter a schedule in advance or to identify suitable courses of action for specific “bad behaviour”. Furthermore this information may be used to quantify the cost of delay. The effect of sectional running time (SRT) deviations and additional dwell time in particular were quantified for three railway schedule performance measures. The key features of this approach were demonstrated in a case study.
Resumo:
Increasing train speeds is conceptually a simple and straight forward method to expand railway capacity, for example in comparison to other more extensive and elaborate alternatives. In this article an analytical capacity model has been investigated as a means of performing a sensitivity analysis of train speeds. The results of this sensitivity analysis can help improve the operation of this railway system and to help it cope with additional demands in the future. To test our approach a case study of the Rah Ahane Iran (RAI) national railway network has been selected. The absolute capacity levels for this railway network have been determined and the analysis shows that increasing trains speeds may not be entirely cost effective in all circumstances.
Resumo:
Critical stage in open-pit mining is to determine the optimal extraction sequence of blocks, which has significant impacts on mining profitability. In this paper, a more comprehensive block sequencing optimisation model is developed for the open-pit mines. In the model, material characteristics of blocks, grade control, excavator and block sequencing are investigated and integrated to maximise the short-term benefit of mining. Several case studies are modeled and solved by CPLEX MIP and CP engines. Numerical investigations are presented to illustrate and validate the proposed methodology.
Investigating ISO90001:2000 certification, and its connection with TQM in the manufacturing industry