998 resultados para 1108


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose Evidence suggests that improved empathy behaviours among healthcare professionals directly impacts on healthcare outcomes. However, the ‘nebulous’ properties of empathic behaviour often means that healthcare profession educators fail to incorporate the explicit teaching and assessment of empathy within the curriculum. This represents a potential mismatch between what is taught by universities and what is actually needed in the healthcare industry. The objective of this study was to assess the extent of empathy in paramedic students across seven Australian universities. Methods A cross-sectional study using a paper-based questionnaire employing a convenience sample of first, second, and third year undergraduate paramedic students. Student empathy levels were measured using a standardised self-reporting instrument: Jefferson Scale of Physician Empathy – Health Profession Students (JSPE-HPS). Findings A total of 783 students participated in the study of which 57% were females. The overall JSPE-HPS mean score was 106.74 (SD=14.8). Females had greater mean empathy scores than males 108.69 v 103.58 (p=0.042). First year undergraduate paramedic mean empathy levels were the lowest, 106.29 (SD=15.40) with second years the highest at 107.17 (SD=14.90). Value The overall findings provide a framework for educators to begin constructing guidelines focusing on the need to incorporate, promote and instil empathy into paramedic students in order to better prepare them for future out-of-hospital healthcare practice.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Partnering has drawn attention from both academics and practitioners in the construction industry in the context of construction and facilities management. The past decades have seen a number of articles reporting the application of partnering in construction. The Chinese construction industry is one of the largest industries in the world; however, to the authors’ best knowledge, no project in mainland China has adopted this procurement approach in a formal and systematic manner as yet. This study employed a qualitative approach to investigate the factors that support or impede the implementation of partnering in mainland China. The findings indicate that the partnering practice is feasible in the construction industry of China due to the large demand brought about by China’s strong economic growth and government support. However, the implementation of partnering in the Chinese construction industry is being impeded by the restrictions of the current Chinese regulatory framework and tender evaluation framework, the incompatible features of Chinese culture and the general lack of trust. Six strategies that help to facilitate the implementation of partnering in China have been developed. This study offers a useful reference to implement collaborative contracting models such as partnering in developing countries.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – Rehearsing practical site operations is without doubt one of the most effective methods for minimising planning mistakes, because of the learning that takes place during the rehearsal activity. However, real rehearsal is not a practical solution for on-site construction activities, as it not only involves a considerable amount of cost but can also have adverse environmental implications. One approach to overcoming this is by the use of virtual rehearsals. The purpose of this paper is to investigate an approach to simulation of the motion of cranes in order to test the feasibility of associated construction sequencing and generate construction schedules for review and visualisation. Design/methodology/approach – The paper describes a system involving two technologies, virtual prototyping (VP) and four-dimensional (4D) simulation, to assist construction planners in testing the sequence of construction activities when mobile cranes are involved. The system consists of five modules, comprising input, database, equipment, process and output, and is capable of detecting potential collisions. A real-world trial is described in which the system was tested and validated. Findings – Feedback from the planners involved in the trial indicated that they found the system to be useful in its present form and that they would welcome its further development into a fully automated platform for validating construction sequencing decisions. Research limitations/implications – The tool has the potential to provide a cost-effective means of improving construction planning. However, it is limited at present to the specific case of crane movement under special consideration. Originality/value – This paper presents a large-scale, real life case of applying VP technology in planning construction processes and activities.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a summary description of the doctoral thesis investigating the field of project management (PM) deployment. Researchers will be informed of the current contributions within this topic and of the possible further investigations and researches. The decision makers and practitioners will be aware of a set of tools addressing the PM deployment with new perspectives. Design/methodology/approach – Research undertaken with the thesis is based on quantitative methods using time series statistics (time distance analysis) and comparative and correlation analysis aimed to better define and understand the PM deployment within and between countries or groups. Findings – The results suggest a project management deployment index (PMDI) to objectively measure the PM deployment based on the concept of certification. A proposed framework to empirically benchmark the PM deployment between countries by integrating the PMDI time series with the two dimensional comparative analysis of Sicherl. The correlation analysis within Hoftsede cultural framework shows the impact of the national culture dimensions on the PM deployment. The forecasting model shows a general continual growth trend of the PM deployment, with continual increase in the time distance between the countries. Research limitations/implications – The PM researchers are offered an empirical quantification on which they can construct further investigations and understanding of this phenomenon. The number of possible units that can be studied offers wide possibilities to replicate the thesis work. New researches can be undertaken to investigate further the contribution of other social or economical indicators, or to refine and enrich the definition of the PMDI indicator. Practical implications – These results have important implications on the PM deployment approaches. The PMDI measurements and time series comparisons facilitate considerably the measurement and benchmarking between the units (e.g. countries) and against targets, while the readiness setting of the studied unit (in terms of development and cultural levels) impacts the PM deployment within this country. Originality/value – This paper provides a summary of cutting-edge research work in the studied field of PM deployment and a link to the published works that researchers can use to help them understand the thesis research as well as how it can be extended.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to summarise a successfully defended doctoral thesis. The main purpose of this paper is to provide a summary of the scope, and main issues raised in the thesis so that readers undertaking studies in the same or connected areas may be aware of current contributions to the topic. The secondary aims are to frame the completed thesis in the context of doctoral-level research in project management as well as offer ideas for further investigation which would serve to extend scientific knowledge on the topic. Design/methodology/approach – Research reported in this paper is based on a quantitative study using inferential statistics aimed at better understanding the actual and potential usage of earned value management (EVM) as applied to external projects under contract. Theories uncovered during the literature review were hypothesized and tested using experiential data collected from 145 EVM practitioners with direct experience on one or more external projects under contract that applied the methodology. Findings – The results of this research suggest that EVM is an effective project management methodology. The principles of EVM were shown to be significant positive predictors of project success on contracted efforts and to be a relatively greater positive predictor of project success when using fixed-price versus cost-plus (CP) type contracts. Moreover, EVM's work-breakdown structure (WBS) utility was shown to positively contribute to the formation of project contracts. The contribution was not significantly different between fixed-price and CP contracted projects, with exceptions in the areas of schedule planning and payment planning. EVM's “S” curve benefited the administration of project contracts. The contribution of the S-curve was not significantly different between fixed-price and CP contracted projects. Furthermore, EVM metrics were shown to also be important contributors to the administration of project contracts. The relative contribution of EVM metrics to projects under fixed-price versus CP contracts was not significantly different, with one exception in the area of evaluating and processing payment requests. Practical implications – These results have important implications for project practitioners, EVM advocates, as well as corporate and governmental policy makers. EVM should be considered for all projects – not only for its positive contribution to project contract development and administration, for its contribution to project success as well, regardless of contract type. Contract type should not be the sole determining factor in the decision whether or not to use EVM. More particularly, the more fixed the contracted project cost, the more the principles of EVM explain the success of the project. The use of EVM mechanics should also be used in all projects regardless of contract type. Payment planning using a WBS should be emphasized in fixed-price contracts using EVM in order to help mitigate performance risk. Schedule planning using a WBS should be emphasized in CP contracts using EVM in order to help mitigate financial risk. Similarly, EVM metrics should be emphasized in fixed-price contracts in evaluating and processing payment requests. Originality/value – This paper provides a summary of cutting-edge research work and a link to the published thesis that researchers can use to help them understand how the research methodology was applied as well as how it can be extended.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to examine the quality of service of a South East Asian country's military facilities management organisation. Design/methodology/approach – An interview survey and questionnaire survey were used to obtain a description and summary of stakeholders’ expectations and the extent to which they were being satisfied by the services provided. Findings – The method provides a useful means of identifying and prioritising varying expectations between stakeholder groups and of indicating any mismatch in expectations in the management of military facilities. Social implications – The development and use of a method to test and improve the effectiveness and efficiency of the management of military facilities helps in providing better value for money. Originality/value – In addition to re-affirming Parasuraman's overall dimensions of service expectation, the empirical summary of the stakeholders’ expectations obtained in this way is of practical value for the service provider in developing a strategy for expectation management. For the case studied, it is also apparent that although the current processes in service delivery are well understood by all involved stakeholders, there is a need for further improvement with regards to their expectation levels. It is also one of the very few reported studies on the management of military facilities.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Recently arrived older refugees in resettlement countries are a particularly vulnerable population who face many risks to their health and well-being, and many challenges in accessing services.This paper reports on a project undertaken in Victoria,Australia to explore the needs of older people from 14 recently arrived refugee communities, and the barriers to their receiving health and aged care. Findings from consultations with community workers and service providers highlight the key issues of isolation, family conflict and mental illness affecting older refugees, and point to ways in which policy-makers and service providers can better respond to these small but deserving communities.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Abstract Purpose – The purpose of this paper is to identify stakeholders’ expectations of information to be conveyed in local authorities’ annual reports and to develop an index of best practice performance reporting. Design/methodology/approach – The paper describes the development of a disclosure index emphasizing the public interest aspect of reporting and the need to provide relevant and meaningful information to stakeholders. The index was crafted from a public accountability perspective and based on the expectations of stakeholders as reconciled and validated by a Delphi panel of experts. Findings – The wide scope of information that was dentified as being important for disclosure by local authorities is consistent with the public accountability paradigm which requires the reporting of comprehensive information (both financial and non financial), about the condition, performance, activities and progress of the entity. Originality/value – The research posits a model of best practice performance reporting for Malaysian, and other, local authorities to meet the need for greater accountability by these entities.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – As a consequence of rapid urbanisation and globalisation, cities have become the engines of population and economic growth. Hence, natural resources in and around the cities have been exposed to externalities of urban development processes. This paper introduces a new sustainability assessment approach that is tested in a pilot study. The paper aims to assist policy-makers and planners investigating the impacts of development on environmental systems, and produce effective policies for sustainable urban development. Design/methodology/approach – The paper introduces an indicator-based indexing model entitled “Indexing Model for the Assessment of Sustainable Urban Ecosystems” (ASSURE). The ASSURE indexing model produces a set of micro-level environmental sustainability indices that is aimed to be used in the evaluation and monitoring of the interaction between human activities and urban ecosystems. The model is an innovative approach designed to assess the resilience of ecosystems towards impacts of current development plans and the results serve as a guide for policymakers to take actions towards achieving sustainability. Findings – The indexing model has been tested in a pilot case study within the Gold Coast City, Queensland, Australia. This paper presents the methodology of the model and outlines the preliminary findings of the pilot study. The paper concludes with a discussion on the findings and recommendations put forward for future development and implementation of the model. Originality/value – Presently, there is a few sustainability indices developed to measure the sustainability at local, regional, national and international levels. However, due to challenges in data collection difficulties and availability of local data, there is no effective assessment model at the microlevel that the assessment of urban ecosystem sustainability accurately. The model introduced in this paper fills this gap by focusing on parcel-scale and benchmarking the environmental performance in micro-level.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose: Service research typically relates switching costs to customer loyalty, and portrays them as effective switching deterrents that engender harmful word-of-mouth (WOM). Rather than to customer loyalty, this paper aims to relate switching costs to consumer inertia, and show that while switching costs may result in customer retention, they can engender positive and negative WOM. This depends on whether the inertia stems from satisfaction or indifference. Design/methodology/approach: A mall-intercept survey investigated 518 customers' perceptions of their mobile phone service providers. Structural equation modelling fitted the data to the conceptual model. Findings: Switching costs deterred switching and engendered negative WOM, but only with low-inertia customers. With high-inertia customers, retention and WOM behaviours depended on whether the inertia stemmed from satisfaction or indifference. Satisfied customers with high switching costs tended to stay, gave more positive and less negative WOM. With indifferent customers, switching costs were unrelated to retention or WOM behaviours. Research limitations/implications: While they may be perceived negatively, switching costs can engender PWOM. Hence, research should not consider switching costs alone without considering the context that produces them. Practical implications: Service providers should segment their customers into low-inertia, high-inertia/satisfied and high-inertia/indifferent, and target each segment differently. By converting customers into the high-inertia/satisfied segment, service providers can make the best use of switching costs – not only in the traditional sense as a barrier to defection, but also as a way of generating positive WOM. Originality/value: This study is the first to consider the role of inertia with switching costs, positive WOM, and negative WOM. The findings suggest that past studies portraying switching costs as negative impediments that evoke only negative WOM might be misleading.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose: E-learning is an organisationally risky investment given the cost and poor levels of adoption by users. In order to gain a better understanding of this problem, a study was conducted into the use of e-learning in a rail organisation. Design/methodology/approach: Using an online survey, employees of a rail-sector organisation were questioned about their use and likelihood of adoption of e-learning. This study explores the factors that affect the way in which learners experience and perceive such systems. Using statistical analysis, twelve hypotheses are tested and explored. Relationships between learning satisfaction, intention to adopt and the characteristics of e-learning systems were established. Findings: The study found that e-learning characteristics can buffer the relationship between learner characteristics and intention to adopt further e-learning in the future. Further, we found that high levels of support can compensate individuals who are low in technological efficacy to adopt e-learning. Research limitations/implications: The cross-sectional design of the study and its focus on measuring intention to adopt as opposed to actual adoption are both limitations. Future research using longitudinal design and research employing a time lag design measuring actual adoption as well as intention are recommended. Practical implications: From a practical perspective, organizations can focus on the actual content and authenticity of the learning experience delivered by the e-learning system to significantly impact how employees will perceive and use e-learning in the future. Low technological efficacy individuals tend not to adopt new technology. Instead of changing individuals’ personalities, organizations can implement supportive policies and practices which would lead to higher e-learning adoption rate among low efficacy individuals. Originality/value: The study integrates technology adoption and learning literatures in developing enablers for e-learning in organizations. Further, this study collects data from rail employees, and therefore the findings are practical to an industry.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose - Critical scholarship on work-life balance (WLB) and its associated practices maintains that workplace flexibility is more than a quasi-functionalist response to contemporary problems faced by individuals, families or organisations. Beginning with Fleetwood’s contention that WLB discourses have become "detached" from their associated practices, this paper explores how workplace practices support or challenge dominant WLB discourses evident in socio-cultural, political and organisational sources. Design/methodology/approach - We analyse individual and group interview transcripts derived from 122 white-collar employees in two different organisational contexts (one public, one private) in the construction industry in Australia. Findings - Four major themes were identified in the data which illustrate discourse practice gaps. First, the demands facing this particular industry/ sector were framed as heightened and unique. Second, productivity was prioritised, dominating employees’ care-giving and lifestyle concerns. Third, employees’ caring responsibilities were communicated as personal and individual choices. Fourth, commitment and efficiency were judged on the basis of presence in the workplace. Research limitations/implications - Even in industries that have embraced WLB, workplace practices legitimate and reinforce the status quo, and maintain a gap between the promises of WLB and its potential to ameliorate conflict and assist workers to span the boundaries of paid work and other life domains. Originality/value - While the practices demonstrated in the research are focused on one industry, the study provides a critical analysis of how the contextually-influenced meaning of WLB is constructed, created and contested in these workplaces and the effects it produces.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose: Tacit knowledge is perceived as the most strategically important resource of the construction organisation, and the only renewable and sustainable base for its activities and competitiveness. Knowledge management (KM) activities that deal with tacit knowledge are essential in helping an organisation to achieve its long-term organisational objectives. The purpose of this paper is to provide empirical evidence for the stronger strategic role of tacit KM in comparison to explicit KM. Design/methodology/approach: A questionnaire survey was administered in 2005 to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal business environment, intensity of KM activities as executed by targeted organisations, and contribution of these activities to business performance (BP). A total of 149 usable responses were received from 99 organisations representing about 38 per cent of the sampling frame. The statistical analyses helped to map the reported KM activities into two groups that, respectively, deal with tacit and explicit knowledge. The sensitivity to variations of organisational policies and strength of association with BP in relation to the two groups of KM activities were also compared empirically. A total of 15 interviews with the managerial and professional staff of leading contractors was undertaken to provide insightful narratives of KM implementations. Findings: The effective implementation of organisational policies, such as encouraging innovations and strengthening strategic guidance for KM, would facilitate human interactions of tacit KM. Higher intensity of activities in managing tacit knowledge would ultimately help the organisations to achieve economic gain in the long run. Originality/value: The stronger strategic role of tacit KM is empirically investigated and established within the context of construction organisations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – Integrated supplier management (ISM), new product development (NPD) and knowledge sharing (KS) practices are three primary business activities utilised to enhance manufacturers' business performance (BP). The purpose of this paper is to empirically investigate the relationships between these three business activities (i.e. ISM, NPD, KS) and BP in a Taiwanese electronics manufacturing context. Design/methodology/approach – A questionnaire survey is first administered to a sample of electronic manufacturing companies operating in Taiwan to elicit the opinions of technical and managerial professionals regarding business activities and BP within their companies. A total of 170 respondents from 83 companies respond to the survey. Factor, correlation and path analysis are undertaken on this quantitative data set to derive the key factors which leverage business outcomes in these companies. Following empirical analysis, six semi-structured interviews are undertaken with manufacturing executives to provide qualitative insights into the underlying reasons why certain business activity factors are the strongest predictors of BP. Findings – The investigation shows that the ISM, NPD and KS constructs all play an important role in the success of company operations and creating business outcomes. Specifically, the key factors within these constructs which influenced BP are: supplier evaluation and selection; design simplification and modular design; information technology infrastructure and systems and open communication. Accordingly, sufficient financial and human resources should be allocated to these important activities to derive accelerated rates of improved BP. These findings are supported by the qualitative interviews with manufacturing executives. Originality/value – The paper depicts the pathways to improved manufacturing BP, through targeting efforts into the above-mentioned factors within the ISM, NPD and KS constructs. Based on the empirical path model, and the specific insights derived from the explanatory interviews with manufacturing executives, the paper also provides a number of practical implications for manufacturing companies seeking to enhance their BP through improved operational activities.