869 resultados para personnel management processes


Relevância:

80.00% 80.00%

Publicador:

Resumo:

We suspect that the array of silly names used to refer to temporary staff worldwide may be indicative of the extent to which these nurses have been relegated to, and we would argue, remain in, a type of underclass – relatively unsupported by employers in terms of professional practice and ipso facto excluded from contributing professionally to team work, practice development, clinical governance and evidence based practice. This may be acceptable to some but in a climate of risk averseness and in the interests of strategic planning we would suggest it is an accident waiting to happen. The recent UK Royal College of Nursing (RCN) (Ball & Pike, 2006) survey of bank and agency nurses brings a welcome focus on a group of nurses that make a significant contribution to the smooth running of health services in many countries.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Infrastructure organizations are operating in an increasingly challenging business environment as a result of globalization, privatization and deregulation. In an external business environment that is constantly changing, extant literature on strategic management advocates the need to focus on factors internal to the organization such as resources and capabilities to sustain their performance. Specifically, they need to develop dynamic capabilities in order to survive and prosper under conditions of change. The aim of this paper is to explore the dynamic capabilities needed in the management of transport infrastructure assets using a multiple case study research strategy. This paper produced a number of findings. First, the empirical evidence showed that the core infrastructure asset management processes are capacity management, options evaluation, procurement & delivery, maintenance management, and asset information management. Second, the study identified five dynamic capabilities namely stakeholder connectivity, cross-functional, relational, technology absorptive and integrated information capability as central to executing the strategic infrastructure asset management processes well. These findings culminate in the development of a capability model to improve the performance of infrastructure assets in an increasingly dynamic business environment.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Preservation and enhancement of transportation infrastructure is critical to continuous economic development in Australia. Of particular importance are the road assets infrastructure, due to their high costs of setting up and their social and economic impact on the national economy. Continuous availability of road assets, however, is contingent upon their effective design, condition monitoring, maintenance, and renovation and upgrading. However, in order to achieve this data exchange, integration, and interoperability is required across municipal boundaries. On the other hand, there are no agreed reference frameworks that consistently describe road infrastructure assets. As a consequence, specifications and technical solutions being chosen to manage road assets do not provide adequate detail and quality of information to support asset lifecycle management processes and decisions taken are based on perception not reality. This paper presents a road asset information model, which works as reference framework to, link other kinds of information with asset information; integrate different data suppliers; and provide a foundation for service driven integrated information framework for community infrastructure and asset management.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Client-side project manager face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation undera successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest the motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisation throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The purpose of this exploratory Australian study was to consider methods of retaining skilled and experienced staff within the domestic violence sector. The antecedents that might influence turnover of practitioners were investigated and analysed. Antecedents broadly included the work-related factors, organisational factors and professional factors. The changing nature of the domestic violence sector was also examined, in particular, feminist identity and feminist practice frameworks. It became evident, however, that the primary reasons for the turnover of study participants can be described as parallel power processes. The concept of parallel power processes as developed through this research aims to capture how workplace behaviours can strongly mirror, or parallel, behaviours used by domestic violence perpetrators. As such, it appears that some domestic violence practitioners are experiencing their own abusive relationship, not within the confines of their home, but within their workplace. Additionally, parallel power processes are compounded by ineffective conflict management processes within the workplace. These concepts directly contribute to practitioners leaving their workplace and, sometimes, the sector. This qualitative study utilised a feminist research epistemology and focused strongly on practitioners' stories. Interviews were undertaken with fifteen domestic violence practitioners from three services within South-East Queensland, Australia. Two sets of semi-structured interviews provided in-depth information based on practitioners‘ experiences of working within this specialised sector. Analysis was conducted using a thematic analytical frame, drawing attention to the key themes as mentioned above. From these findings, it is suggested that in order to retain practitioners, domestic violence services must identify and address parallel power processes through effective conflict management processes. In an operational sense, it is recommended that education and training be undertaken within all staffing levels, in particular management committees. Lastly, it is recommended that the sector itself places greater attention on the re-invigoration of the feminist principles and philosophy that has traditionally guided the sector.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The five articles appearing in this issue reflect the depth of project management research in terms of delineating and clarifying the different philosophical positions, advancing the concepts, and applying innovative research methods. These articles focus on the ontology of project management research (“Foundations of Project Management Research: An Explicit and Six-Facet Ontological Framework” by Gauthier and Ika), project management practices relevant to different types of projects from a practitioner’s perspective (“An Empirical Identification of Project Management Toolsets and a Comparison Among Project Types” by Besner and Hobbs), the effect of project management processes on project performance (“Project Management Knowledge and Effects on Construction Project Outcomes: An Empirical Study” by Chou and Yang), determining the success metrics at different stages of a project (“A Perspective Based Understanding of Project Success” by McLeod, Doolin, and MacDonell), and identifying project success parameters and critical success factors from the point of view of different project actors in largescale projects (“Forecasting Success on Large Projects: Developing Reliable Scales to Predict Multiple Perspectives by Multiple Stakeholders Over Multiple Time Frames” by Turner and Zolin), and understanding project success from the points of view of different project stakeholders...

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The natural disasters incident that frequently hit Indonesia are floods, severe droughts, tsunamis, earth-quakes, volcano, eruptions, landslides, windstorm and forest fires. The impact of those natural disasters are significantly severe and affecting the quality of life of the community due to the breakdown of the public as-sets as one source to deliver public services. This paper is aimed to emphasis the importance of natural disaster risk-informed in relation to public asset management in Indonesian Central Government, particularly in asset planning stage where asset decision is made as the gate into the whole public asset management processes. A Case study in the Ministry of Finance Indonesia as the central government public asset manager and in 5 (five) line ministries/governmental agencies as public asset users was used as the approach to achieved the research objective. The case study devoured three data collection techniques i.e. interviews, observations and document archival which will be analysed by a content analysis approach. The result of the study indicates that Indonesian geographical position exposing many of public infra-structure assets as a high vulnerability to natural disasters. Information on natural-disaster trends and predictions to identify and measure the risks are available, however, such information are not utilise and integrated to the process of public infrastructure asset planning as the gate to the whole public asset management processes. Therefore, in order to accommodate and incorporate this natural disaster risk-information into public asset management processes, particularly in public asset planning, a public asset performance measurements framework should be adopted and applied in the process as one sources in making decision for infrastructure asset planning. Findings from this study provide useful input for the Ministry of Finance as public asset manager, scholars and private asset management practitioners in Indonesia to establish natural disaster risks awareness in public infrastructure asset management processes.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The ineffectiveness of current design processes has been well studied and has resulted in widespread calls for the evolution and development of new management processes. Perhaps one problem is that with the advent of BIM we are moving from one stage to another without necessarily having resolved all the issues. CAD design technology, if well handled, could have significantly raised the level of quality and efficiency of current processes, but in practice this was not fully realized. Therefore, technology alone can´t solve all the problems and the advent of BIM could result in a similar bottleneck. For a precise definition of the problem to be solved we should start by understanding what are the main current bottlenecks that have yet to be overcome by either new technologies or management processes, and the impact of human behavior related issues despite the advent of new technologies. The fragmented and dispersed nature of the AEC sector and the huge number of small organizations that comprise it would probably be a major limiting factor. Several authors have addressed this issue and more recently IDDS has been defined as the highest level of achievement. However, what is written on IDDS shows an extremely ideal situation on a state to be achieved; it shows a holistic utopian proposition with the intent to create the research agenda to move towards that state. Key to IDDS is the framing of a new management model which should address the problems associated with key aspects: technology, processes, policies and people. One of the primary areas to be further studied is the process of collaborative work and understanding, together with the development of proposals to overcome the many cultural barriers that currently exist and impede the advance of new management methods. The purpose of this paper is to define and delimit problems to be solved so that it is possible to implement a new management model for a collaborative design process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

An investigation of the construction data management needs of the Florida Department of Transportation (FDOT) with regard to XML standards including development of data dictionary and data mapping. The review of existing XML schemas indicated the need for development of specific XML schemas. XML schemas were developed for all FDOT construction data management processes. Additionally, data entry, approval and data retrieval applications were developed for payroll compliance reporting and pile quantity payment development.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Although safety statistics indicate that road crashes are the most common form of work-related fatalities, many organizations fail to treat company vehicles in the same manner as other physical safety hazards within the workplace. Traditionally, work-related road safety has targeted primarily driver-related issues and not adequately addressed organizational processes, such as the organizations’ safety system and risk management processes and practice. This inadequacy generally stems from a lack of specific contextual knowledge and basic requirements to improve work-related road safety, including the supporting systems to ensure any intervention strategy or initiative’s ongoing effectiveness. Therefore, informed by previous research and based on a case study methodology, the Organizational Work-Related Road Safety Situational Analysis was developed to assess organizations’ current work-related road safety system, including policy, procedures, processes and practice. The situational analysis tool is similar to a safety audit however is more comprehensive in detail, application and provides sufficient evidence to enable organizations to mitigate and manage their work-related road safety risks. In addition, data collected from this process assists organizations in making informed decisions regarding intervention strategy design, development, implementation and ongoing effectiveness. This paper reports on the effectiveness of the situational analysis tool to assess WRRS systems across five differing and diverse organizations; including gas exploration and mining, state government, local government, and not for profit/philanthropy. The outcomes of this project identified considerable differences in the degree by which the organizations’ addressed work-related road safety across their vehicle fleet operations and provides guidelines for improving organizations’ work-related road safety systems.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Organizational change is a typical phenomenon within public sector agencies in OECD countries. An increasing number of studies in the literature examine the implementation of change and its resulting impact on the work attitudes of public sector employees; however, little is known about the extent to which change management processes impact on employees’ work attitudes. This study aims to address this issue by developing a path model underpinned by change management and public service motivation literature. The path model was tested on a sample of 308 managerial and non-managerial public sector employees from the U.S. The results provide further empirical evidence on the types of change initiatives on nursing work and change management processes being implemented. Public sector agencies in the sample implemented a variety of change initiatives such as downsizing, delayering and empowerment. Employees reported two change management processes: the provision of change-related information and participation in change decision making. While the results indicate that change produces change-induced stressors, change information tends to reduce stressors and, subsequently, role stress. The results also indicate that change management processes are associated with higher levels of public service motivation, which is in turn connected to higher levels of person–organization fit. Person–organization fit was found to partially mediate the relationship between public service motivation and job satisfaction in the context of change.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

As many other chapters in this book have noted, until recently labour lawyers have tended not to draaw on regulatory scholarship. In this chapter we look at certain areas of labour law through a particular kind of regulatory lens - regulation that requires firms to reconstitute their management processes and procedures, perhaps even their organisational cultures. In particular, we examine the kinds of regulatory demands made on firms by legal rules in four areas of labour law: (i) occupational health and safety (OHS)regulation; unfair dismissal law; equal opportunity (EO) and (iv) sexual harassment law.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Successful management of design changes is critical for the efficient delivery of construction projects. Building Information Modeling (BIM) is envisioned to play an important role in integrating design, construction and facility management processes through coordinated changes throughout the project life-cycle. BIM currently provides significant benefits in coordinating changes across different views in a single model, and identifying conflicts between different discipline-specific models. However, current BIM tools provide limited support in managing changes across several discipline-specific models. This paper describes an approach to represent, coordinate, and track changes within a collaborative multi-disciplinary BIM environment. This approach was informed by a detailed case study of a large, complex, fast-tracked BIM project where we investigated numerous design changes, analyzed change management processes, and evaluated existing BIM tools. Our approach characterises design changes in an ontology to represent changed component attributes, dependencies between components, and change impacts. It explores different types of dependencies amongst different design changes and describes how a graph based approach and dependency matrix could assist with automating the propagation and impact of changes in a BIM-based project delivery process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In the health care industry, Job Satisfaction (JS) is linked with work performance, psychological well-being and employee turnover. Although research into JS among health professionals has a long history worldwide, there has been very little analysis in Vietnam. No study has addressed JS of preventive medicine workers in Vietnam, and there is no reliable and valid instrument in Vietnamese language and context for evaluation of JS in this group. This project was conducted to fill these gaps. The findings contribute evidence regarding factors that influence JS in this sector of the health industry that should be applied to personnel management policies and practices in Vietnam.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose – There has been a tendency in sustainability science to be passive. The purpose of this paper is to introduce an alternative positive framework for a more active and direct approach to sustainable design and assessment that de-couples environmental impacts and economic growth. Design/methodology/approach – This paper deconstructs some systemic gaps that are critical to sustainability in built environment management processes and tools, and reframes negative “sustainable” decision making and assessment frameworks into their positive counterparts. In particular, it addresses the omission of ecology, design and ethics in development assessment. Findings – Development can be designed to provide ecological gains and surplus “eco-services,” but assessment tools and processes favor business-as-usual. Despite the tenacity of the dominant paradigm (DP) in sustainable development institutionalized by the Brundtland Report over 25 years ago, these omissions are easily corrected. Research limitations/implications – The limitation is that the author was unable to find exceptions to the omissions cited here in the extensive literature on urban planning and building assessment tools. However, exceptions prove the rule. The implication is that it is not too late for eco-positive retrofitting of cities to increase natural and social capital. The solutions are just as applicable in places like China and India as the USA, as they pay for themselves. Originality/value – Positive development (PD) is a fundamental paradigm shift that reverses the negative models, methods and metrics of the DP of sustainable development. This paper provides an example of how existing “negative” concepts and practices can be converted into positive ones through a PD prism. Through a new form of bio-physical design, development can be a sustainability solution.