746 resultados para knowledge management, enterprise resource planning systems, public sector, Delphi method, history
Resumo:
Triggered by the continuing global financial crisis, most public administration systems internationally are reviewing their ability to meet public expectations in more challenging strategic environments, while satisfying the pressure from their political masters to drive down the costs of public administration. Consequently public sector organizations are under constant pressure to reform to meet not only the global economic challenges, but the need for more responsive government (Brown et al 2003). Doyle et al (2000) propose that organizational change is seldom well managed, but that the public sector faces greater difficulty in implementing corporate change than the private sector because of its unique environment, e.g. the need to deliver bureaucratically impartial outcomes. The scale of the changes required, and the constraints imposed by the context within which these changes need to occur, have intensified the need for capable public sector leadership and management. The types of capability required now extend beyond those typically required in public organizations through the efficiency drive of new public management. Acquiring these capabilities remains a key issue for public organizations. One challenge for public management, then, is leadership and management quality, including the need to recruit externally to refresh, re-energize and change the sector and its individual organizations as well as develop advanced skills among existing senior executives.
Resumo:
This paper describes the background and methodology developed and employed in undertaking research developing a Knowledge Management Strategy for a key construction focused government agency. This paper reviews this methodology and examines a likely Knowledge Management Strategy. Two central objectives structure this Case Study: 1. Identify categories of important information generated by the Building Division, Queensland Department of Public Works in its service delivery to internal and external stake-holders, and 2. Formulate an appropriate and targeted Knowledge Management Strategy to meet the needs of the Queensland Building Capital Works program. The structure of this paper includes: *Description of the Queensland construction industry setting *Review the relevant literature *Design an appropriate research methodology *Analyse results *Formulate conclusions, contributions and implications of the targeted strategy.
Resumo:
A stage model for knowledge management systems in policing financial crime is developed in this paper. Stages of growth models enable identification of organizational maturity and direction. Information technology to support knowledge work of police officers is improving. For example, new information systems supporting police investigations are evolving. Police investigation is an information-rich and knowledge-intensive practice. Its success depends on turning information into evidence. This paper presents an organizing framework for knowledge management systems in policing financial crime. Future case studies will empirically have to illustrate and validate the stage hypothesis developed in this paper.
Resumo:
The purpose of this conceptual paper is to address the lack of consistent means through which strategies are identified and discussed across theoretical perspectives in the field of business strategy. A standardised referencing system is offered to codify the means by which strategies can be identified, from which new business services and information systems may be derived. This taxonomy was developed using qualitative content analysis study of government agencies’ strategic plans. This taxonomy is useful for identifying strategy formation and determining gaps and opportunities. Managers will benefit from a more transparent strategic design process that reduces ambiguity, aids in identifying and correcting gaps in strategy formulation, and fosters enhanced strategic analysis. Key benefits to academics are the improved dialogue in strategic management field and suggest that progress in the field requires that fundamentals of strategy formulation and classification be considered more carefully. Finally, the formalization of strategy can lead to the clear identification of new business services, which inform ICT investment decisions and shared service prioritisation.
Resumo:
In Australia, it has been increasingly accepted that sustainability needs to be at the top of the agenda when contemplating infrastructure development. In practice however, many companies struggle to find effective ways to embrace sustainable ideas and implement them in real projects beyond minimum compliance. One of the reasons is the lack of underpinning knowledge and evidence to demonstrate and measure the linkage between sustainability implementations and the relevant outcomes. This is compounded by the fact that very often there are no common understandings between the stakeholders on sustainability and there is a big divide between research advancement and real-life applications. Therefore it is both feasible and timely to develop and expand the body of sustainability knowledge on infrastructure development and investigate better ways of communicating with and managing it within the infrastructure sector. Although knowledge management (KM) is a relatively new and emerging discipline, it has shown its value and promise in existing applications in the construction industry. Considering the existing KM mechanisms and tools employed in practice, this research is aimed at establishing a specific KM approach to facilitate sustainability knowledge identification, acquisition, sharing, maintenance and application within the infrastructure sector, and promote integrated decision-making for sustainable infrastructure development. A triangulation of questionnaire survey, semi-structured interviews and case studies was employed in this research to collect required qualitative and quantitative data. The research studied the unique characteristics of the infrastructure sector, the nature of sustainability knowledge, and evaluated and validated the critical elements, key processes, and priority issues of KM for the Australian infrastructure sector. A holistic KM framework was developed to set the overall context for managing sustainability knowledge in the infrastructure sector by outlining (1) the main aims and outcomes of managing sustainability knowledge, (2) the key knowledge activities, (3) effective KM strategies and instruments, and (4) KM enablers. Because of the highly project-oriented nature of the infrastructure sector, knowledge can only add value when it is being used in real projects. Implementation guidelines were developed to help the industry practitioners and project teams to apply sustainability knowledge and implement KM in infrastructure project scenarios. This research provides the Australian infrastructure sector with tools to better understand KM, helps the industry practitioners to prioritize attention on relevant sustainability issues, and recommends effective practices to manage sustainability knowledge, especially in real life implementation of infrastructure projects.
Resumo:
Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). As background to this challenge, a brief review is given of current practice in the selection of major public sector infrastructure in Australia, along with a review of the related literature concerning the Multi-Attribute Utility Approach (MAUA) and the effect of MAUA on the role of risk management in procurement selection. To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision making model is mentioned. A brief summary is also given of the research method and hypothesis used to test and develop the new procurement model and which uses competition as the dependent variable and as a proxy for VfM. The hypothesis is given as follows: When the actual procurement mode matches the theoretical/predicted procurement mode (informed by the new procurement model), then actual competition is expected to match optimum competition (based on actual prevailing capacity vis-à-vis the theoretical/predicted procurement mode) and subject to efficient tendering. The aim of this paper is to report on progress towards testing this hypothesis in terms of an analysis of two of the four data components in the hypothesis. That is, actual procurement and actual competition across 87 road and health major public sector projects in Australia. In conclusion, it is noted that the Global Financial Crisis (GFC) has seen a significant increase in competition in public sector major road and health infrastructure and if any imperfections in procurement and/or tendering are discernible, then this would create the opportunity, through the deployment of economic principles embedded in the new procurement model and/or adjustments in tendering, to maintain some of this higher level post-GFC competition throughout the next business cycle/upturn in demand including private sector demand. Finally, the paper previews the next steps in the research with regard to collection and analysis of data concerning theoretical/predicted procurement and optimum competition.
Resumo:
Web 2.0 is a new generation of online applications on the web that permit people to collaborate and share information online. The use of such applications by employees in organisations enhances knowledge management (KM) in organisations. Employee involvement is a critical success factor as the concept is based on openness, engagement and collaboration between people where organizational knowledge is derived from employees experience, skills and best practices. Consequently, the employee's perception is recognized as being an important factor in web 2.0 adoption for KM and worthy of investigation. There are few studies that define and explore employee's enterprise 2.0 acceptance for KM. This paper provides a systematic review of the literature prior to demonstrating the findings as part of a preliminary conceptual model that represents the first stage of an ongoing research project that will end up with an empirical study. Reviewing available studies in technology acceptance, knowledge management and enterprise 2.0 literatures aids obtaining all potential user acceptance factors of enterprise 2.0. The preliminary conceptual model is a refinement of the theory of planed behaviour (TPB) as the user acceptance factors has been mapped into the TPB main components including behaviour attitude, subjective norms and behaviour control which are the determinant of individual's intention to a particular behaviour.
Resumo:
This paper presents an approach to developing indicators for expressing resilience of a generic water supply system. The system is contextualised as a meta-system consisting of three subsystems to represent the water catchment and reservoir, treatment plant and the distribution system supplying the end-users. The level of final service delivery to end-users is considered as a surrogate measure of systemic resilience. A set of modelled relationships are used to explore relationships between system components when placed under simulated stress. Conceptual system behaviour of specific types of simulated pressure is created for illustration of parameters for indicator development. The approach is based on the hypothesis that an in-depth knowledge of resilience would enable development of decision support system capability which in turn will contribute towards enhanced management of a water supply system. In contrast to conventional water supply system management approaches, a resilience approach facilitates improvement in system efficiency by emphasising awareness of points-of-intervention where system managers can adjust operational control measures across the meta-system (and within subsystems) rather than expansion of the system in entirety in the form of new infrastructure development.
Resumo:
Information technology (IT) has been playing a powerful role in creating a competitive advantage for organisations over the past decades. This role has become proportionally greater over time as expectations for IT investments to drive business opportunities keep on rising. However, this reliance on IT has also raised concerns about regulatory compliance, governance and security. IT governance (ITG) audit leverages the skills of IS/IT auditors to ensure that IT initiatives are in line with the business strategies. ITG audit emerged as part of performance audit to provide an assessment of the effective implementation of ITG. This research attempts to empirically examine the ITG audit challenges in the public sector. Based on literature and Delphi research, this paper provides insights regarding the impact of, and required effort to address these challenges. The authors also present the ten major ITG audit challenges facing Australian public sector organisations today.
Resumo:
Purpose: Tacit knowledge is perceived as the most strategically important resource of the construction organisation, and the only renewable and sustainable base for its activities and competitiveness. Knowledge management (KM) activities that deal with tacit knowledge are essential in helping an organisation to achieve its long-term organisational objectives. The purpose of this paper is to provide empirical evidence for the stronger strategic role of tacit KM in comparison to explicit KM. Design/methodology/approach: A questionnaire survey was administered in 2005 to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal business environment, intensity of KM activities as executed by targeted organisations, and contribution of these activities to business performance (BP). A total of 149 usable responses were received from 99 organisations representing about 38 per cent of the sampling frame. The statistical analyses helped to map the reported KM activities into two groups that, respectively, deal with tacit and explicit knowledge. The sensitivity to variations of organisational policies and strength of association with BP in relation to the two groups of KM activities were also compared empirically. A total of 15 interviews with the managerial and professional staff of leading contractors was undertaken to provide insightful narratives of KM implementations. Findings: The effective implementation of organisational policies, such as encouraging innovations and strengthening strategic guidance for KM, would facilitate human interactions of tacit KM. Higher intensity of activities in managing tacit knowledge would ultimately help the organisations to achieve economic gain in the long run. Originality/value: The stronger strategic role of tacit KM is empirically investigated and established within the context of construction organisations.
Resumo:
Knowledge Management (KM) is a process that focuses on knowledge-related activities to facilitate knowledge creation, capture, transformation and use, with the ultimate aim of leveraging organisations’ intellectual capital to achieve organisational objectives. Organisational culture and climate have been identified as major catalysts to knowledge creation and sharing, and hence are considered important dimensions of KM research. The fragmented and hierarchical nature of the construction industry illustrates its difficulties to operate in a co-ordinated and homogeneous way when dealing with knowledge-related issues such as research and development, training and innovation. The culture and climate of organisations operating within the construction industry are profoundly shaped by the long-established characteristics of the industry, whilst also being influenced by the changes within the sector. Meanwhile, the special project-based structure of construction organisations constitutes additional challenges in facing knowledge production. The study this paper reports on addresses the impact of organisational culture and climate on the intensity of KM activities within construction organisations, with specific focus on the managerial activities that help to manage these challenges and to facilitate KM. A series of semi-structured interviews were undertaken to investigate the KM activities of the contractors operating in Hong Kong. The analysis on the qualitative data revealed that leadership on KM, innovation management, communication management and IT development were key factors that impact positively on the KM activities within the organisations under investigation.
Resumo:
Property is an important factor in all businesses production in order to function. Nourse (1990) quoted ¡°some businesses are real estate, all businesses use real estate¡±. In recent years, the management of property assets has become the focus of many organisations, including the non-real estate businesses. Good asset management is concerned with the effective utilisation of a property owner.s assets. It is the management process of ensuring that the portfolio of properties held meets the overall requirements of the users. In short, it is the process of identifying the user.s requirement and the rationalisation of property holdings to match that requirement best, followed by a monitoring and ongoing review of practice. In Malaysia, federal agencies and local authorities are among the largest property asset owners. Recently the federal government has released a Total Asset Management Manual (TAMM). It is at the preliminary stage of implementation. This thesis will study the international practices of asset management of public sector assets and assess the effectiveness of TAMM. This research will focus on current international practices for the effective management of public sector property assets. The current application in Malaysia will be highlighted, to determine the awareness and understanding of the current practices to the recently released TAMM. This research is an exploratory research. The basis of this research relies on the combination of qualitative and quantitative approach, whereby the qualitative approach focuses on the international practices and its application to the management of public sector property assets. Questionnaires survey will be conducted among the Malaysian public property assets managers and users in the quantitative approach to gauge the collective opinion on the current practices of TAMM and its implementation
Resumo:
Enterprises, both public and private, have rapidly commenced using the benefits of enterprise resource planning (ERP) combined with business analytics and “open data sets” which are often outside the control of the enterprise to gain further efficiencies, build new service operations and increase business activity. In many cases, these business activities are based around relevant software systems hosted in a “cloud computing” environment. “Garbage in, garbage out”, or “GIGO”, is a term long used to describe problems in unqualified dependency on information systems, dating from the 1960s. However, a more pertinent variation arose sometime later, namely “garbage in, gospel out” signifying that with large scale information systems, such as ERP and usage of open datasets in a cloud environment, the ability to verify the authenticity of those data sets used may be almost impossible, resulting in dependence upon questionable results. Illicit data set “impersonation” becomes a reality. At the same time the ability to audit such results may be an important requirement, particularly in the public sector. This paper discusses the need for enhancement of identity, reliability, authenticity and audit services, including naming and addressing services, in this emerging environment and analyses some current technologies that are offered and which may be appropriate. However, severe limitations to addressing these requirements have been identified and the paper proposes further research work in the area.
Resumo:
Safety of repair, maintenance, alteration, and addition (RMAA) works have long been neglected because RMAAworks are often minute and only last for a short period of time. With rising importance of the RMAA sector in many developed societies, safety of RMAA works has begun to draw attention. Many RMAA contracting companies are small- and medium-sized enterprises (SMEs) that do not have comprehensive safety management systems. Existing safety legislation and regulations for new construction sites are not fully applicable to RMAAworks. Instead of relying on explicit and well-established safety systems, tacit safety knowledge plays an extremely important role in RMAA projects. To improve safety of RMAAworks, safety knowledge should be better managed. However, safety knowledge is difficult to capture in RMAA works. This study aims to examine safety management practices of RMAA contracting companies to see how safety knowledge of RMAA projects is managed. Findings show that RMAA contracting companies undertaking large-scale RMAA projects have more initiatives of safety management. Safety management of small-scale RMAA works relies heavily on the motivation of site supervisors and self-regulation of workers. Better tacit knowledge management improves safety performance. To enhance safety capability of RMAA contracting companies, a knowledge sharing culture should be cultivated. The government should provide assistance to SMEs to implement proper safety management practices in small-sized projects. Potentials of applying computer software technology in RMAA projects to capture, store, and retrieve safety information should be explored. Employees should be motivated to share safety knowledge by giving proper recognition to those who are willing to share.
Resumo:
Public sector organisations (PSOs) operate in information-intensive environments often within operational contexts where efficiency is a goal. What's more, the rapid adoption of IT is expected to facilitate good governance within public sector organisations but it often clashes with the bureaucratic culture of these organisations. Accordingly, models such as IT Governance (ITG) and government reform -in particular the new public management (NPM)- were introduced in PSOs in an effort to address the inefficiencies of bureaucracy and under performance. This work explores the potential effect of change in political direction and policy on the stability of IT governance in Australian public sector organisations. The aim of this paper is to examine implications of a change of government and the resulting political environment on the effectiveness of the audit function of ITG. The empirical data discussed here indicate that a number of aspects of audit functionality were negatively affected by change in political direction and resultant policy changes. The results indicate a perceived decline in capacity and capability which in turn disrupts the stability of IT governance systems in public sector organisations.