839 resultados para in-house maintenance projects
Resumo:
Software development settings provide a great opportunity for CSCW researchers to study collaborative work. In this paper, we explore a specific work practice called bug reproduction that is a part of the software bug-fixing process. Bug re-production is a highly collaborative process by which software developers attempt to locally replicate the ‘environment’ within which a bug was originally encountered. Customers, who encounter bugs in their everyday use of systems, play an important role in bug reproduction as they provide useful information to developers, in the form of steps for reproduction, software screenshots, trace logs, and other ways to describe a problem. Bug reproduction, however, poses major hurdles in software maintenance as it is often challenging to replicate the contextual aspects that are at play at the customers’ end. To study the bug reproduction process from a human-centered perspective, we carried out an ethnographic study at a multinational engineering company. Using semi-structured interviews, a questionnaire and half-a-day observation of sixteen software developers working on different software maintenance projects, we studied bug reproduction. In this pa-per, we present a holistic view of bug reproduction practices from a real-world set-ting and discuss implications for designing tools to address the challenges developers face during bug reproduction.
Resumo:
In this paper, we explore how BIM functionalities together with novel management concepts and methods have been utilized in thirteen hospital projects in the United States and the United Kingdom. Secondary data collection and analysis were used as the method. Initial findings indicate that the utilization of BIM enables a holistic view of project delivery and helps to integrate project parties into a collaborative process. The initiative to implement BIM must come from the top down to enable early involvement of all key stakeholders. It seems that it is rather resistance from people to adapt to the new way of working and thinking than immaturity of technology that hinders the utilization of BIM.
Resumo:
The construction and operation of infrastructure assets can have significant impact on society and the region. Using a sustainability assessment framework can be an effective means to build sustainability aspects into the design, construction and operation of infrastructure assets. The conventional evaluation processes and procedures for infrastructure projects do not necessarily measure the qualitative/quantitative effectiveness of all aspects of sustainability: environment, social wellbeing and economy. As a result, a few infrastructure sustainability rating schemes have been developed with a view to assess the level of sustainability attained in the infrastructure projects. These include: Infrastructure Sustainability (Australia); CEEQUAL (UK); and Envision (USA). In addition, road sector specific sustainability rating schemes such as Greenroads (USA) and Invest (Australia) have also been developed. These schemes address several aspects of sustainability with varying emphasis (weightings) on areas such as: use of resources; emission, pollution and waste; ecology; people and place; management and governance; and innovation. The attainment of sustainability of an infrastructure project depends largely on addressing the whole-of-life environmental issues. This study has analysed the rating schemes’ coverage of different environmental components for the road infrastructure under the five phases of a project: material, construction, use, maintenance and end-of-life. This is based on a comprehensive life cycle assessment (LCA) system boundary. The findings indicate that there is a need for the schemes to consider key (high impact) life cycle environmental components such as traffic congestion during construction, rolling resistance due to surface roughness and structural stiffness of the pavement, albedo, lighting, and end-of-life management (recycling) to deliver sustainable road projects.
Resumo:
Formal incentives systems aim to encourage improved performance by offering a reward for the achievement of project-specific goals. Despite argued benefits of incentive systems on project delivery outcomes, there remains debate over how incentive systems can be designed to encourage the formation of strong project relationships within a complex social system such as an infrastructure project. This challenge is compounded by the increasing emphasis in construction management research on the important mediating influence of technical and organisational context on project performance. In light of this challenge, the research presented in this paper focuses on the design of incentive systems in four infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on a motivational theory frame, a cross case analysis is conducted to examine differences and similarities across social and cultural drivers impacting on the effectiveness of the incentive systems in light of infrastructure project context. Despite significant differences in case project characteristics, results indicate the projects’ experience similar social drivers impacting on incentive effectiveness. Significant value across the projects was placed on: varied performance goals and multiple opportunities to across the project team to pursue incentive rewards; fair risk allocation across contract parties; value-driven tender selection; improved design-build integration; and promotion of future work opportunities. However, differences across the contexts were identified. Results suggest future work opportunities were a more powerful social driver in upholding reputation and establishing strong project relationships in the Australian context. On the other hand, the relationship initiatives in the Dutch context seemed to be more broadly embraced resulting in a greater willingness to collaboratively manage project risk. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the social and cultural influences on incentive effectiveness across different geographical and contextual boundaries in future research.
Resumo:
The worldwide installed base of enterprise resource planning (ERP) systems has increased rapidly over the past 10 years now comprising tens of thousands of installations in large- and medium-sized organizations and millions of licensed users. Similar to traditional information systems (IS), ERP systems must be maintained and upgraded. It is therefore not surprising that ERP maintenance activities have become the largest budget provision in the IS departments of many ERP-using organizations. Yet, there has been limited study of ERP maintenance activities. Are they simply instances of traditional software maintenance activities to which traditional software maintenance research findings can be generalized? Or are they fundamentally different, such that new research, specific to ERP maintenance, is required to help alleviate the ERP maintenance burden? This paper reports a case study of a large organization that implemented ERP (an SAP system) more than three years ago. From the case study and data collected, we observe the following distinctions of ERP maintenance: (1) the ERP-using organization, in addition to addressing internally originated change-requests, also implements maintenance introduced by the vendor; (2) requests for user-support concerning the ERP system behavior, function and training constitute a main part of ERP maintenance activity; and (3) similar to the in-house software environment, enhancement is the major maintenance activity in the ERP environment, encompassing almost 64% of the total change-request effort. In light of these and other findings, we ultimately: (1) propose a clear and precise definition of ERP maintenance; (2) conclude that ERP maintenance cannot be sufficiently described by existing software maintenance taxonomies; and (3) propose a benefits-oriented taxonomy, that better represents ERP maintenance activities. Three salient dimensions (for characterizing requests) incorporated in the proposed ERP maintenance taxonomy are: (1) who is the maintenance source? (2) why is it important to service the request? and (3) what––whether there is any impact of implementing the request on the installed module(s)?
Resumo:
Organizational and technological systems analysis and design practices such as process modeling have received much attention in recent years. However, while knowledge about related artifacts such as models, tools, or grammars has substantially matured, little is known about the actual tasks and interaction activities that are conducted as part of analysis and design acts. In particular, key role of the facilitator has not been researched extensively to date. In this paper, we propose a new conceptual framework that can be used to examine facilitation behaviors in process modeling projects. The framework distinguishes four behavioral styles in facilitation (the driving engineer, the driving artist, the catalyzing engineer, and the catalyzing artist) that a facilitator can adopt. To distinguish between the four styles, we provide a set of ten behavioral anchors that underpin facilitation behaviors. We also report on a preliminary empirical exploration of our framework through interviews with experienced analysts in six modeling cases. Our research provides a conceptual foundation for an emerging theory for describing and explaining different behaviors associated with process modeling facilitation, provides first preliminary empirical results about facilitation in modeling projects, and provides a fertile basis for examining facilitation in other conceptual modeling activities.
Resumo:
This paper outlines an approach for teaching Marketing Principles in an MBA course through service-learning to enable adult learners to connect the lectures’ marketing content to a real-world marketing project. During the course, 40 students in groups of four to five individuals were involved in eight different client-sponsored marketing projects executed simultaneously. The rationale, planning and management of this approach utilised current research on service-learning, living cases and client-sponsored projects in marketing education. The experimental curriculum design is presented in a timeline that mirrors the preparation and management of the group projects and the considerations to be taken into account when initiating and facilitating the projects. Reflections from this iteration of the service-learning design suggest the importance of: detailed project planning, the involvement of students in choosing the projects, the introduction of forms and feedback loops, the role of the instructor in facilitating the students and managing expectations, and the role of the company representative in supporting the groups.
Resumo:
Purpose – Preliminary cost estimates for construction projects are often the basis of financial feasibility and budgeting decisions in the early stages of planning and for effective project control, monitoring and execution. The purpose of this paper is to identify and better understand the cost drivers and factors that contribute to the accuracy of estimates in residential construction projects from the developers’ perspective. Design/methodology/approach – The paper uses a literature review to determine the drivers that affect the accuracy of developers’ early stage cost estimates and the factors influencing the construction costs of residential construction projects. It used cost variance data and other supporting documentation collected from two case study projects in South East Queensland, Australia, along with semi-structured interviews conducted with the practitioners involved. Findings – It is found that many cost drivers or factors of cost uncertainty identified in the literature for large-scale projects are not as apparent and relevant for developers’ small-scale residential construction projects. Specifically, the certainty and completeness of project-specific information, suitability of historical cost data, contingency allowances, methods of estimating and the estimator’s level of experience significantly affect the accuracy of cost estimates. Developers of small-scale residential projects use pre-established and suitably priced bills of quantities as the prime estimating method, which is considered to be the most efficient and accurate method for standard house designs. However, this method needs to be backed with the expertise and experience of the estimator. Originality/value – There is a lack of research on the accuracy of developers’ early stage cost estimates and the relevance and applicability of cost drivers and factors in the residential construction projects. This research has practical significance for improving the accuracy of such preliminary cost estimates.
Resumo:
Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.
Resumo:
The cells of multicellular organisms have differentiated to carry out specific functions that are often accompanied by distinct cell morphology. The actin cytoskeleton is one of the key regulators of cell shape subsequently controlling multiple cellular events including cell migration, cell division, endo- and exocytosis. A large set of actin regulating proteins has evolved to achieve and tightly coordinate this wide range of functions. Some actin regulator proteins have so-called house keeping roles and are essential for all eukaryotic cells, but some have evolved to meet the requirements of more specialized cell-types found in higher organisms enabling complex functions of differentiated organs, such as liver, kidney and brain. Often processes mediated by the actin cytoskeleton, like formation of cellular protrusions during cell migration, are intimately linked to plasma membrane remodeling. Thus, a close cooperation between these two cellular compartments is necessary, yet not much is known about the underlying molecular mechanisms. This study focused on a vertebrate-specific protein called missing-in-metastasis (MIM), which was originally characterized as a metastasis suppressor of bladder cancer. We demonstrated that MIM regulates the dynamics of actin cytoskeleton via its WH2 domain, and is expressed in a cell-type specific manner. Interestingly, further examination showed that the IM-domain of MIM displays a novel membrane tubulation activity, which induces formation of filopodia in cells. Following studies demonstrated that this membrane deformation activity is crucial for cell protrusions driven by MIM. In mammals, there are five members of IM-domain protein family. Functions and expression patterns of these family members have remained poorly characterized. To understand the physiological functions of MIM, we generated MIM knockout mice. MIM-deficient mice display no apparent developmental defects, but instead suffer from progressive renal disease and increased susceptibility to tumors. This indicates that MIM plays a role in the maintenance of specific physiological functions associated with distinct cell morphologies. Taken together, these studies implicate MIM both in the regulation of the actin cytoskeleton and the plasma membrane. Our results thus suggest that members of MIM/IRSp53 protein family coordinate the actin cytoskeleton:plasma membrane interface to control cell and tissue morphogenesis in multicellular organisms.
Resumo:
The history of software development in a somewhat systematical way has been performed for half a century. Despite this time period, serious failures in software development projects still occur. The pertinent mission of software project management is to continuously achieve more and more successful projects. The application of agile software methods and more recently the integration of Lean practices contribute to this trend of continuous improvement in the software industry. One such area warranting proper empirical evidence is the operational efficiency of projects. In the field of software development, Kanban as a process management method has gained momentum recently, mostly due to its linkages to Lean thinking. However, only a few empirical studies investigate the impacts of Kanban on projects in that particular area. The aim of this doctoral thesis is to improve the understanding of how Kanban impacts on software projects. The research is carried out in the area of Lean thinking, which contains a variety of concepts including Kanban. This article-type thesis conducts a set of case studies expanded with the research strategy of quasi-controlled experiment. The data-gathering techniques of interviews, questionnaires, and different types of observations are used to study the case projects, and thereby to understand the impacts of Kanban on software development projects. The research papers of the thesis are refereed, international journal and conference publications. The results highlight new findings regarding the application of Kanban in the software context. The key findings of the thesis suggest that Kanban is applicable to software development. Despite its several benefits reported in this thesis, the empirical evidence implies that Kanban is not all-encompassing but requires additional practices to keep development projects performing appropriately. Implications for research are given, as well. In addition to these findings, the thesis contributes in the area of plan-driven software development by suggesting implications both for research and practitioners. As a conclusion, Kanban can benefit software development projects but additional practices would increase its potential for the projects.
Resumo:
This work seeks to address those questions and evaluate other international experiences and experiments designed to achieve the same ends. The book is based on a study of two particular cases where parliamentary bodies designed and implemented participatory digital processes, namely, the e-Democracy Program developed by the Brazilian House of Representatives, and the Virtual Senator Program developed by the Chilean Senate. The text unfolds in the form of a systematic analysis of institutional aspects embracing political and organizational elements as well as the social aspects associated to the application of digital democracy in parliaments. The investigation shows that at the stage they found themselves in 2010 those projects had only brought in very incipient results in regard to the aspects of enhancing representativity in decision making processes, aggregating collective intelligence to the legislative process or transparency to parliamentary performances, even though all of those are precious components of any democracy that deems itself to be participatory and deliberative. Nevertheless, such experiences have had the merit of contributing towards the gradual construction of more effective participatory mechanisms, complementary to the political representation system in place.
Resumo:
The last 30 years have seen Fuzzy Logic (FL) emerging as a method either complementing or challenging stochastic methods as the traditional method of modelling uncertainty. But the circumstances under which FL or stochastic methods should be used are shrouded in disagreement, because the areas of application of statistical and FL methods are overlapping with differences in opinion as to when which method should be used. Lacking are practically relevant case studies comparing these two methods. This work compares stochastic and FL methods for the assessment of spare capacity on the example of pharmaceutical high purity water (HPW) utility systems. The goal of this study was to find the most appropriate method modelling uncertainty in industrial scale HPW systems. The results provide evidence which suggests that stochastic methods are superior to the methods of FL in simulating uncertainty in chemical plant utilities including HPW systems in typical cases whereby extreme events, for example peaks in demand, or day-to-day variation rather than average values are of interest. The average production output or other statistical measures may, for instance, be of interest in the assessment of workshops. Furthermore the results indicate that the stochastic model should be used only if found necessary by a deterministic simulation. Consequently, this thesis concludes that either deterministic or stochastic methods should be used to simulate uncertainty in chemical plant utility systems and by extension some process system because extreme events or the modelling of day-to-day variation are important in capacity extension projects. Other reasons supporting the suggestion that stochastic HPW models are preferred to FL HPW models include: 1. The computer code for stochastic models is typically less complex than a FL models, thus reducing code maintenance and validation issues. 2. In many respects FL models are similar to deterministic models. Thus the need for a FL model over a deterministic model is questionable in the case of industrial scale HPW systems as presented here (as well as other similar systems) since the latter requires simpler models. 3. A FL model may be difficult to "sell" to an end-user as its results represent "approximate reasoning" a definition of which is, however, lacking. 4. Stochastic models may be applied with some relatively minor modifications on other systems, whereas FL models may not. For instance, the stochastic HPW system could be used to model municipal drinking water systems, whereas the FL HPW model should or could not be used on such systems. This is because the FL and stochastic model philosophies of a HPW system are fundamentally different. The stochastic model sees schedule and volume uncertainties as random phenomena described by statistical distributions based on either estimated or historical data. The FL model, on the other hand, simulates schedule uncertainties based on estimated operator behaviour e.g. tiredness of the operators and their working schedule. But in a municipal drinking water distribution system the notion of "operator" breaks down. 5. Stochastic methods can account for uncertainties that are difficult to model with FL. The FL HPW system model does not account for dispensed volume uncertainty, as there appears to be no reasonable method to account for it with FL whereas the stochastic model includes volume uncertainty.
Resumo:
Abstract: Purpose – The aim of this paper is to examine and compare the performance of architects with respect to clients' rating of importance over a set of performance criteria in Nigerian public and private sector building projects. Design/methodology/approach – A survey involving clients from both public and private sectors of recently completed building projects in Nigeria was undertaken. Data analysis includes comparing similarities and differences using standardised ratio, Mann Whitney U and Wilcoxon tests. Findings – The results show that private sector clients are likely to be more concerned with cost, while public sector clients are more concerned with buildability of design. A total of 79 per cent of the criteria were similarly selected by both sectors with respect to importance of the criteria. Architects need to improve their performance significantly in about 82 per cent of the whole set of 28 criteria. The architects performed better in the public sector than the private sector and 14 per cent of the criteria were indicated as being statistically different in terms of architects' performance. Originality/value – The results provide feedback which can be incorporated in architects' future projects so as to ensure successful project implementation in the building delivery process.