982 resultados para Vegetation management - Victoria


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tributyl tin (TBT) deposits in the sediments are one of many impacts that have been imposed on both the environment and the up-coming development of Boat Haven, Airlie Beach, Queensland. The current costly solution to this problem (that is, removal and re-burial) could be put in future to the credit of the developer rather than be treated (as at present) as a penalty. The Queensland Government’s Offsets Scheme provides an opportunity to promote effective conservation of regional landscapes. Because this scheme plans for offsetting in terrestrial vegetation systems through rehabilitation, so credits could be given to those approved developers who rehabilitate valuable marine habitats disturbed by TBT deposits.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The low stream salinity naturally in the Nebine-Mungallala Catchment, extent of vegetation retention, relatively low rainfall and high evaporation indicates that there is a relatively low risk of rising shallow groundwater tables in the catchment. Scalding caused by wind and water erosion exposing highly saline sub-soils is a more important regional issue, such as in the Homeboin area. Local salinisation associated with evaporation of bore water from free flowing bore drains and bores is also an important land degradation issue particularly in the lower Nebine, Wallam and Mungallala Creeks. The replacement of free flowing artesian bores and bore drains with capped bores and piped water systems under the Great Artesian Basin bore rehabilitation program is addressing local salinisation and scalding in the vicinity of bore drains and preventing the discharge of saline bore water to streams. Three principles for the prevention and control of salinity in the Nebine Mungallala catchment have been identified in this review: • Avoid salinity through avoiding scalds – i.e. not exposing the near-surface salt in landscape through land degradation; • Riparian zone management: Scalding often occurs within 200m or so of watering lines. Natural drainage lines are most likely to be overstocked, and thus have potential for scalding. Scalding begins when vegetation is removed, and without that binding cover, wind and water erosion exposes the subsoil; and • Monitoring of exposed or grazed soil areas. Based on the findings of the study, we make the following recommendations: 1. Undertake a geotechnical study of existing maps and other data to help identify and target areas most at risk of rising water tables causing salinity. Selected monitoring should then be established using piezometers as an early warning system. 2. SW NRM should financially support scald reclamation activity through its various funding programs. However, for this to have any validity in the overall management of salinity risk, it is critical that such funding require the landholder to undertake a salinity hazard/risk assessment of his/her holding. 3. A staged approach to funding may be appropriate. In the first instance, it would be reasonable to commence funding some pilot scald reclamation work with a view to further developing and piloting the farm hazard/risk assessment tools, and exploring how subsequent grazing management strategies could be incorporated within other extension and management activities. Once the details of the necessary farm level activities have been more clearly defined, and following the outcomes of the geotechnical review recommended above, a more comprehensive funding package could be rolled out to priority areas. 4. We recommend that best-practice grazing management training currently on offer should be enhanced with information about salinity risk in scald-prone areas, and ways of minimising the likelihood of scald formation. 5. We recommend that course material be developed for local students in Years 6 and 7, and that arrangements be made with local schools to present this information. Given the constraints of existing syllabi, we envisage that negotiations may have to be undertaken with the Department of Education in order for this material to be permitted to be used. We have contact with key people who could help in this if required. 6. We recommend that SW NRM continue to support existing extension activities such as Grazing Land Management and the Monitoring Made Easy tools. These aids should be able to be easily expanding to incorporate techniques for monitoring, addressing and preventing salinity and scalding. At the time of writing staff of SW NRM were actively involved in this process. It is important that these activities are adequately resourced to facilitate the uptake by landholders of the perception that salinity is an issue that needs to be addressed as part of everyday management. 7. We recommend that SW NRM consider investing in the development and deployment of a scenario-modelling learning support tool as part of the awareness raising and education activities. Secondary salinity is a dynamic process that results from ongoing human activity which mobilises and/or exposes salt occurring naturally in the landscape. Time scales can be short to very long, and the benefits of management actions can similarly have immediate or very long time frames. One way to help explain the dynamics of these processes is through scenario modelling.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective: In Australia and comparable countries, case management has become the dominant process by which public mental health services provide outpatient clinical services to people with severe mental illness. There is recognition that caseload size impacts on service provision and that management of caseloads is an important dimension of overall service management. There has been little empirical investigation, however, of caseload and its management. The present study was undertaken in the context of an industrial agreement in Victoria, Australia that required services to introduce standardized approaches to caseload management. The aims of the present study were therefore to (i) investigate caseload size and approaches to caseload management in Victoria's mental health services; and (ii) determine whether caseload size and/or approach to caseload management is associated with work-related stress or case manager self-efficacy among community mental health professionals employed in Victoria's mental health services. Method: A total of 188 case managers responded to an online cross-sectional survey with both purpose-developed items investigating methods of case allocation and caseload monitoring, and standard measures of work-related stress and case manager personal efficacy. Results: The mean caseload size was 20 per full-time case manager. Both work-related stress scores and case manager personal efficacy scores were broadly comparable with those reported in previous studies. Higher caseloads were associated with higher levels of work-related stress and lower levels of case manager personal efficacy. Active monitoring of caseload was associated with lower scores for work-related stress and higher scores for case manager personal efficacy, regardless of size of caseload. Although caseloads were most frequently monitored by the case manager, there was evidence that monitoring by a supervisor was more beneficial than self-monitoring. Conclusion: Routine monitoring of caseload, especially by a workplace supervisor, may be effective in reducing work-related stress and enhancing case manager personal efficacy. Keywords: case management, caseload, stress

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Victorians feel a strong connection to their local waterways and most have a good grasp of river health issues. The My Victorian Waterway report analyses how Victorians interact with their local waterways including rivers, lakes and estuaries. The report is based on the results of a survey completed by more than 7,000 Victorians who answered questions about how they use and care for their local waterways as well as their knowledge of river health issues and aspirations for the future of our waterways.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Australian climate, soils and agricultural management practices are significantly different from those of the northern hemisphere nations. Consequently, experimental data on greenhouse gas production from European and North American agricultural soils and its interpretation are unlikely to be directly applicable to Australian systems. A programme of studies of non-CO2 greenhouse gas emissions from agriculture has been established that is designed to reduce uncertainty of non-CO2 greenhouse gas emissions in the Australian National Greenhouse Gas Inventory and provide outputs that will enable better on-farm management practices for reducing non-CO2 greenhouse gas emissions, particularly nitrous oxide. The systems being examined and their locations are irrigated pasture (Kyabram Victoria), irrigated cotton (Narrabri, NSW), irrigated maize (Griffith, NSW), rain-fed wheat (Rutherglen, Victoria) and rain-fed wheat (Cunderdin, WA). The field studies include treatments with and without fertilizer addition, stubble burning versus stubble retention, conventional cultivation versus direct drilling and crop rotation to determine emission factors and treatment possibilities for best management options. The data to date suggest that nitrous oxide emissions from nitrogen fertilizer, applied to irrigated dairy pastures and rain-fed winter wheat, appear much lower than the average of northern hemisphere grain and pasture studies. More variable emissions have been found in studies of irrigated cotton/vetch/wheat rotation and substantially higher emissions from irrigated maize.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Engineering asset management (EAM) is a rapidly growing and developing field. However, efforts to select and develop engineers in this area are complicated by our lack of understanding of the full range of competencies required to perform. This exploratory study sought to clarify and categorise the professional competencies required of individuals at different hierarchical levels within EAM. Data from 14 interviews and 61 on-line survey participants has informed the development of an initial Professional Competency Framework. The nine competency categories indicate that Engineers working in this field need to be able to collaborate and influence others, complete objectives within organizational guidelines and be able to manage themselves effectively. Limitations and potential uses in practice and research for this framework are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Environmental degradation has become increasingly aggressive in recent years due to rapid urban development and other land use pressures. This chapter looks at BioCondition, a newly developed vegetation assessment framework by Queensland Department of Resource Management (DERM) and how mobile technology can assist beginners in conducting the survey. Even though BioCondition is designed to be simple, it is still fairly inaccessible to beginners due to its complex, time consuming, and repetitive nature. A Windows Phone mobile application, BioCondition Assessment Tool, was developed to provide on-site guidance to beginners and document the assessment process for future revision and comparison. The application was tested in an experiment at Samford Conservation Park with 12 students studying ecology in Queensland University of Technology.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective To estimate the incidence and severity of invasive group A streptococcal infection in Victoria, Australia. Design Prospective active surveillance study. Setting Public and private laboratories, hospitals and general practitioners throughout Victoria. Patients eople in Victoria diagnosed with group A streptococcal disease notified to the surveillance system between 1 March 2002 and 31 August 2004. Main outcome measure Confirmed invasive group A streptococcal disease. Results We identified 333 confirmed cases: an average annualised incidence rate of 2.7 (95% CI, 2.3-3.2) per 100000 population per year. Rates were highest in people aged 65 years and older and those younger than 5 years. The case-fatality rate was 7.8%. Streptococcal toxic shock syndrome occurred in 48 patients (14.4%), with a case-fatality rate of 23%. Thirty cases of necrotising fasciitis were reported; five (17%) of these patients died. Type 1 (23%) was the most frequently identified emm sequence type in all, age groups. All tested isolates were susceptible to penicillin and clindamycin. Two isolates (4%) were resistant to erythromycin. Conclusion The incidence of invasive group A streptococcal disease in temperate Australia is greater than previously appreciated and warrants greater public health attention, including its designation as a notifiable disease.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Gambling activities and the revenues derived have been seen as a way to increase economic development in deprived areas. There are also, however, concerns about the effects of gambling in general and electronic gaming machines (EGMs) in particular, on the resources available to the localities in which they are situated. This paper focuses on the factors that determine the extent and spending of community benefit-related EGM-generated resources within Victoria, Australia, focusing in particular on the relationships between EGM activity and socio-economic and social capital indicators, and how this relates to the community benefit resources generated by gaming.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Engineering asset management (EAM) is a rapidly growing and developing field. However, efforts to select and develop engineers in this area are complicated by our lack of understanding of the full range of competencies required to perform. This exploratory study sought to clarify and categorise the professional competencies required of individuals at different hierarchical levels within EAM. Data from 14 field interviews, 61 online surveys, and 10 expert panel interviews were used to develop an initial professional competency framework. Overall, nine competency clusters were identified. These clusters indicate that engineers working in this field need to be able to collaborate and influence others, complete objectives within organisational guidelines, and be able to manage themselves effectively. Limitations and potential uses of this framework in engineering education and research are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose The purpose of this paper is to explore and compare the asset management policies and practices of six Australian states – New South Wales, Victoria, Queensland, South Australia, Western Australia and Tasmania – to improve understanding of the policy context to best shape policy focus and guidelines. Australian state-wide asset management policies and guidelines are an emergent policy domain, generating a substantial body of knowledge. However, these documents are spread across the layers of government and are therefore largely fragmented and lack coherency. Design/methodology/approach The comparative study is based on the thematic mapping technique using the Leximancer software. Findings Asset management policies and guidelines of New South Wales and Victoria have more interconnected themes as compared to other states in Australia. Moreover, based on the findings, New South Wales has covered most of the key concepts in relation to asset management; the remaining five states are yet to develop a comprehensive and integrated approach to asset management policies and guidelines. Research limitations/implications This review and its findings have provided a number of directions on which government policies can now be better constructed and assessed. In doing so, the paper contributes to a coherent way forward to satisfy national emergent and ongoing asset management challenges. This paper outlines a rigorous analytical methodology to inform specific policy changes. Originality/value This paper provides a basis for further research focused on analyzing the context and processes of asset management guidelines and policies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

These guidelines are intended to provide clinicians and palliative care services with guidelines to inform practice, the development of policy and procedures, and associated training and education programs in relation to portable subcutaneous infusion device (syringe driver) management.