990 resultados para Starting Process


Relevância:

20.00% 20.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIM-compatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIMcompatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis aims at developing a better understanding of unstructured strategic decision making processes and the conditions for achieving successful decision outcomes. Specifically it focuses on the processes used to make CRE (Corporate Real Estate) decisions. The starting point for this thesis is that our knowledge of such processes is incomplete. A comprehensive study of the most recent CRE literature together with Behavioural Organization Theory has provided a research framework for the exploration of CRE recommended =best practice‘, and of how organizational variables impact on and shape these practices. To reveal the fundamental differences between CRE decision-making in practice and the prescriptive =best practice‘ advocated in the CRE literature, a study of seven Italian management consulting firms was undertaken addressing the aspects of content and process of decisions. This thesis makes its primary contribution by identifying the importance and difficulty of finding the right balance between problem complexity, process richness and cohesion to ensure a decision-making process that is sufficiently rich and yet quick enough to deliver a prompt outcome. While doing so, this research also provides more empirical evidence to some of the most established theories of decision-making while reinterpreting their mono-dimensional arguments in a multi-dimensional model of successful decision-making.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Business Process Management (BPM) has emerged as a popular management approach in both Information Technology (IT) and management practice. While there has been much research on business process modelling and the BPM life cycle, there has been little attention given to managing the quality of a business process during its life cycle. This study addresses this gap by providing a framework for organisations to manage the quality of business processes during different phases of the BPM life cycle. This study employs a multi-method research design which is based on the design science approach and the action research methodology. During the design science phase, the artifacts to model a quality-aware business process were developed. These artifacts were then evaluated through three cycles of action research which were conducted within three large Australian-based organisations. This study contributes to the body of BPM knowledge in a number of ways. Firstly, it presents a quality-aware BPM life cycle that provides a framework on how quality can be incorporated into a business process and subsequently managed during the BPM life cycle. Secondly, it provides a framework to capture and model quality requirements of a business process as a set of measurable elements that can be incorporated into the business process model. Finally, it proposes a novel root cause analysis technique for determining the causes of quality issues within business processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To meet new challenges of Enterprise Systems that essentially go beyond the initial implementation, contemporary organizations seek employees with business process experts with software skills. Despite a healthy demand from the industry for such expertise, recent studies reveal that most Information Systems (IS) graduates are ill-equipped to meet the challenges of modern organizations. This paper shares insights and experiences from a course that is designed to provide a business process centric view of a market leading Enterprise System. The course, designed for both undergraduate and graduate students, uses two common business processes in a case study that employs both sequential and explorative exercises. Student feedback gained through two longitudinal surveys across two phases of the course demonstrates promising signs of the teaching approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a method which aims at increasing the efficiency of enterprise system implementations. First, we argue that existing process modeling languages that feature different degrees of abstraction for different user groups exist and are used for different purposes which makes it necessary to integrate them. We describe how to do this using the meta models of the involved languages. Second, we argue that an integrated process model based on the integrated meta model needs to be configurable and elaborate on the enabling mechanisms. We introduce a business example using SAP modeling techniques to illustrate the proposed method.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Determining sensitivity and specificity of a postoperative infection surveillance process is a difficult undertaking. Because postoperative infections are rare, vast numbers of negative results exist, and it is often not reasonable to assess them all. This study gives a methodological framework for estimating sensitivity and specificity by taking only a small sample of the number of patients who test negative and comparing their findings to the reference or “gold standard” rather than comparing the findings of all patients to the gold standard. It provides a formula for deriving confidence intervals for these estimates and a guide to minimum requirements for sampling results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Quality has been an important factor for shopping centers in competitive conditions. However, quality measurement has no standard. In Surabaya, only two regional shopping centers will be measured in this research. The objective is assessing quality of shopping centers building using Analytical Hierarchy Process (AHP) method and calculating the Building Quality Index. An overall ranking of Hierarchy priorities of quality criteria founded as a result from AHP analysis. Access and Circulation became the highest priority in affecting quality of shopping centers building according to respondents’ perception of quality. Weightened value as a result from comparison between two shopping centers as follows: Tunjungan Plaza get 0,732 point and Surabaya Plaza get 0,268 point. The first shopping center got higher weight than the second shopping center. The BQI for Tunjungan Plaza is 66% and for Surabaya Plaza is 64%.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Industrial applications of the simulated-moving-bed (SMB) chromatographic technology have brought an emergent demand to improve the SMB process operation for higher efficiency and better robustness. Improved process modelling and more-efficient model computation will pave a path to meet this demand. However, the SMB unit operation exhibits complex dynamics, leading to challenges in SMB process modelling and model computation. One of the significant problems is how to quickly obtain the steady state of an SMB process model, as process metrics at the steady state are critical for process design and real-time control. The conventional computation method, which solves the process model cycle by cycle and takes the solution only when a cyclic steady state is reached after a certain number of switching, is computationally expensive. Adopting the concept of quasi-envelope (QE), this work treats the SMB operation as a pseudo-oscillatory process because of its large number of continuous switching. Then, an innovative QE computation scheme is developed to quickly obtain the steady state solution of an SMB model for any arbitrary initial condition. The QE computation scheme allows larger steps to be taken for predicting the slow change of the starting state within each switching. Incorporating with the wavelet-based technique, this scheme is demonstrated to be effective and efficient for an SMB sugar separation process. Moreover, investigations are also carried out on when the computation scheme should be activated and how the convergence of the scheme is affected by a variable stepsize.